A. No conditional use permit granted by the board shall be valid for a period longer than two (2) years from the date on which the board grants the permit, unless within such two (2) year period:
1. A building permit is obtained and the erection or alteration of a structure is started, or
2. An occupancy permit is obtained, if required, and the use is commenced.
B. The board may grant a maximum of one extension not exceeding six (6) months, upon written application, without notice of hearing. (Ord. 52-09, 10-19-2009)