Section
General Provisions
53.001 Turning on
53.002 Application
53.003 Deposit
53.004 Plumbing
53.005 Resale
53.006 Tampering
53.007 Fire hydrants
53.008 Required connections
Service Pipes
53.020 Installation
53.021 Pipes
53.022 Separate connections required
53.023 Repairs
53.024 Excavations
53.025 Leaded service lines
53.026 Fire hydrants
53.027 Required connection
Meters; Rates
53.040 Meters required
53.041 Installation; ownership
53.042 Reading meters
53.043 Testing
53.044 Rates
53.045 Bills
53.046 Construction contractors
53.047 Discontinuation of service
Installation Fees
53.060 Fee for inside corporate limits
53.061 Fee for outside corporate limits
Cross-Connections, Backflow and Back-Siphonage Control
53.075 Intent, purpose and control
53.076 Responsibilities
53.077 Definitions
53.078 Regulations
53.079 Industrial plants or facilities
53.080 Cross-connection with source, other than town, prohibited
53.081 Prevention of backflow and back- siphonage
53.082 Distribution systems
53.083 Connections for sprinkler systems
Water Shortage Conservation
53.095 Generally
53.096 Declaration of water shortage
53.097 Stage I Water Shortage Condition; guidelines
53.098 Stage II Water Shortage Condition; unlawful uses of water
53.099 Stage III Water Shortage Condition; restrictions
53.100 Lifting of water shortage restrictions
53.101 Disconnection for noncompliance