The director may inspect any and all materials before pouring the concrete. The contractor shall furnish the required samples when requested for the making of tests and other required examinations prior to the use of the materials. (Ord. Nos. 8590; 22026)
The contractor shall provide necessary red lanterns and flares and safeguards so placed that pedestrians will not be injured and vehicular traffic shall not be unnecessarily impeded and be protected from injury. Provisions shall be made for the passage of water in the street gutter. (Ord. 8590)