Skip to code content (skip section selection)
Compare to:
Dallas Overview
The Dallas City Code
CITY OF DALLAS, TEXAS CODE OF ORDINANCES
CHARTER of THE CITY OF DALLAS, TEXAS
VOLUME I
VOLUME II
CHAPTER 29 RESERVED
CHAPTER 29A RESERVED
CHAPTER 30 NOISE
CHAPTER 31 OFFENSES - MISCELLANEOUS
CHAPTER 31A OFFICERS AND EMPLOYEES
CHAPTER 32 PARKS AND WATER RESERVOIRS
CHAPTER 33 ASSISTED LIVING FACILITIES
CHAPTER 34 PERSONNEL RULES
CHAPTER 35 RESERVED
CHAPTER 36 POLES AND WIRES
CHAPTER 37 POLICE
CHAPTER 37A POLICE AND FIRE WELFARE FUND
CHAPTER 38 PRIVATE DETECTIVES
CHAPTER 38A PROMOTERS
CHAPTER 39 RAILROADS
CHAPTER 39A RELOCATION ASSISTANCE - EMINENT DOMAIN
CHAPTER 39B REGULATED PROPERTY - PURCHASE AND SALE
CHAPTER 39C RECORDS MANAGEMENT PROGRAM
CHAPTER 40 RAT CONTROL
CHAPTER 40A RETIREMENT
CHAPTER 40B SECONDARY METALS RECYCLERS
CHAPTER 41 SMOKING
CHAPTER 41A SEXUALLY ORIENTED BUSINESSES
CHAPTER 42 HOME SOLICITATIONS
CHAPTER 42A SPECIAL EVENTS; NEIGHBORHOOD MARKETS; DALLAS FARMERS MARKET FARMERS MARKET; STREETLIGHT POLE BANNERS
CHAPTER 42B SHORT-TERM RENTALS
CHAPTER 43 STREETS AND SIDEWALKS
ARTICLE I. IN GENERAL.
ARTICLE II. AWNINGS.
ARTICLE III. CONSTRUCTION AND REPAIR OF SIDEWALKS, CURBS AND DRIVEWAY APPROACHES.
Division 1. Generally.
Subdivision I. In General.
SEC. 43-31. PURPOSE OF ARTICLE.
SEC. 43-32. DEFINITIONS.
SEC. 43-33. LIABILITY OF ABUTTING PROPERTY OWNERS FOR INJURIES CAUSED BY DEFECTIVE SIDEWALKS.
SEC. 43-34. LIABILITY OF PERSONS MAKING SPECIAL USE OF SIDEWALKS.
SEC. 43-35. ADMINISTRATION AND ENFORCEMENT OF ARTICLE; POLICE POWER OF DIRECTOR.
SEC. 43-36. DIRECTOR NOT PERSONALLY LIABLE FOR GOOD FAITH ACTIONS.
SEC. 43-37. AUTHORITY OF DIRECTOR GENERALLY.
SEC. 43-38. EFFECT OF ARTICLE ON RESPONSIBILITY FOR DAMAGES.
SEC. 43-39. CONSTRUCTION PERMIT - REQUIRED.
SEC. 43-40. SAME - APPLICATION - INFORMATION TO BE FURNISHED BY APPLICANTS.
SEC. 43-41. SAME - SAME - LOT PLAN TO BE FURNISHED WHEN REQUESTED.
SEC. 43-42. SAME - EXPIRATION; NEW PERMITREQUIRED BEFORE RECOMMENCING WORK.
SEC. 43-43. SURETY BOND - REQUIRED.
SEC. 43-44. SURETY BOND - CONDITIONS OF ISSUANCE.
SEC. 43-45. SAME - EFFECT OF ARTICLE ON PERSONS NOW ENGAGED IN CONSTRUCTION, ETC.
SEC. 43-46. STANDARDS FOR RAW MATERIALS USED IN CONSTRUCTION.
SEC. 43-47. SPECIFICATIONS FOR CONCRETE REINFORCING STEEL.
SEC. 43-48. SPECIFICATIONS AND PLACEMENT OF CONCRETE EXPANSION JOINT FILLER.
SEC. 43-49. SUBGRADE DETERMINATION.
SEC. 43-50. FORM, SPECIFICATIONS, AND PLACEMENT.
SEC. 43-51. CONCRETE - INGREDIENTS AND CONSISTENCY REQUIRED.
SEC. 43-52. SAME - PLACEMENT.
SEC. 43-53. SAME - PROTECTING AGAINST EXTREME TEMPERATURES, ETC.
SEC. 43-54. EXAMINATION AND APPROVAL OF MATERIALS PRIOR TO USE.
SEC. 43-55. ALL WORK TO COMPLY WITH ESTABLISHED LINES AND GRADES.
SEC. 43-56. PROTECTION OF GRADE AND LINE STAKES.
SEC. 43-57. LIGHTS AND SAFEGUARDS.
SEC. 43-58. REMOVAL OF DEBRIS, ETC., UPON COMPLETION OF WORK.
SEC. 43-59. CONSTRUCTION OF RETAINING WALLS ON PUBLIC PROPERTY.
SEC. 43-60. TRAFFIC BARRIERS FOR SERVICE STATIONS AND PARKING LOTS.
SEC. 43-61. SAME - PLACEMENT OF CURBS.
SEC 43-62. INDENTED PARKING.
SEC. 43-63. REPAIR OF DEFECTIVE SIDEWALKS OR DRIVEWAYS BY ABUTTING PROPERTY OWNERS.
SEC. 43-64. MIXING CONCRETE OR MORTAR ON EXISTING PAVEMENT; UNUSED MIXTURE TO BE IMMEDIATELY REMOVED.
SEC. 43-65. SIDEWALK DRAINAGE OPENINGS TO HAVE METAL COVERS.
SEC. 43-66. ALTERNATIVE MATERIALS AND CONSTRUCTION METHODS.
Subdivision II. Sidewalks.
Division 2. Material Specifications and Construction Methods.
ARTICLE IV. SNOW AND ICE.
ARTICLE V. BUILDING NUMBERING.
ARTICLE VI. LICENSE FOR THE USE OF PUBLIC RIGHT-OF-WAY.
ARTICLE VII. SALE OF MERCHANDISE AND PRODUCE ON STREETS AND SIDEWALKS.
ARTICLE VIII. CERTAIN USES OF PUBLIC RIGHT-OF-WAY.
ARTICLE IX. DRIVEWAYS GENERALLY.
ARTICLE X. SHARED DOCKLESS VEHICLE OPERATING PERMIT.
CHAPTER 43A SWIMMING POOLS
CHAPTER 44 TAXATION
CHAPTER 45 TEMPORARY INCLEMENT WEATHER SHELTER PROGRAM
CHAPTER 46 UNLAWFUL DISCRIMINATORY PRACTICES RELATING TO SEXUAL ORIENTATION AND GENDER IDENTITY AND EXPRESSION
CHAPTER 47 TRAILERS, TRAILER PARKS AND TOURIST CAMPS
CHAPTER 47A TRANSPORTATION FOR HIRE
CHAPTER 48 TREES AND SHRUBS
CHAPTER 48A VEHICLE TOW SERVICE
CHAPTER 48B VACANT BUILDINGS AND LOTS
CHAPTER 48C VEHICLE IMMOBILIZATION SERVICE
CHAPTER 49 WATER AND WASTEWATER
CHAPTER 50 CONSUMER AFFAIRS
Code Comparative Table
VOLUME III
Loading...
SEC. 43-48.   SPECIFICATIONS AND PLACEMENT OF CONCRETE EXPANSION JOINT FILLER.
   Expansion joint filler shall be of the pre-moulded type, one-half inch in thickness; the width shall conform to the section of concrete in which incorporated. Expansion joint filler shall be placed where new work abuts old concrete work. Upon completion of the work, expansion joint filler shall be cut off level with the top of the finished concrete. Expansion joint filler shall conform to the Standard Specifications for Bituminous Types (A.S.T.M. Designation D-994-53) or Non-extruding and Resilient Types (A.S.T.M. Designation D-544-56T). (Ord. 8590)
SEC. 43-49.   SUBGRADE DETERMINATION.
   Foundations or subgrades for all work shall be set at the grades determined by the director. Inspection of such foundation or subgrade must be made and approved by the director before concrete is placed on it. (Ord. Nos. 8590; 22026)
SEC. 43-50.   FORM, SPECIFICATIONS, AND PLACEMENT.
   Forms must be straight, smooth, free from warps, and aligned with the stakes set by the director and must be of sufficient strength to retain this alignment. Depth must be not less than the total thickness of the section for which used. Forms must be securely staked, anchored, braced, and set to the established line and grade, the upper edge conforming to the grade of the finished work. Forms must be cleaned of all mortar and dirt. Surface for forms next to concrete may be required to be oiled. Forms must be of either wood or metal. (Ord. Nos. 8590; 22026)
SEC. 43-51.   CONCRETE - INGREDIENTS AND CONSISTENCY REQUIRED.
   Concrete shall consist of a mixture of Portland cement, fine and coarse aggregate and water in such proportions that will secure a dense, plastic, workable concrete of the strength specified at 28 days. The quantity of water specified per sack of Portland cement shall include the moisture on the surface of the aggregate, but shall not include the amount of water absorbed by the aggregates in 30 minutes. Concrete which has partially set shall not be retempered or remixed by adding additional ingredients. Concrete shall not be mixed during freezing weather, and shall not be placed when the temperature is 40°F. or less. No frozen ingredients or conglomerates shall be used in concrete. Test for slump of concrete shall be made in accordance with the Method of Test for Consistency of Portland Cement Concrete (Serial Designation C-143-52) of the A.S.T.M. All tests for ingredients and concrete shall be made in accordance with the current applicable methods of tests of the A.S.T.M. (Ord. 8590)
SEC. 43-52.   SAME - PLACEMENT.
   Concrete shall be placed in as near its final position as possible, and in such manner as to prevent separation or segregation of the ingredients. Concrete shall be placed in such quantities that after being thoroughly compacted it will be the required thickness, the upper surface true, uniform and parallel to the finished surface. (Ord. 8590)
SEC. 43-53.   SAME - PROTECTING AGAINST EXTREME TEMPERATURES, ETC.
   Concrete shall be protected against freezing or excessive heat. Concrete shall be kept continuously moist for four days. Concrete shall be protected from traffic until it has developed 80 percent of the required strength. (Ord. 8590)
Loading...