Concrete shall be placed in as near its final position as possible, and in such manner as to prevent separation or segregation of the ingredients. Concrete shall be placed in such quantities that after being thoroughly compacted it will be the required thickness, the upper surface true, uniform and parallel to the finished surface. (Ord. 8590)