14N-C4-C408 Maintenance information and system commissioning.
The provisions of Section C408 of IECC-CE are adopted by reference with the following modifications:
1.   Throughout the body of each provision of this section, reset the singular and plural forms of the following terms in italic type: "air economizer," "enclosed space," and "nameplate horsepower."
2.   Throughout this section, reset the following term in non-italic type: "construction documents."
3.   Revise Section C408.2 by replacing "permitted" with "allowed."
4.   Revise Section C408.2.4.1 by deleting "pursuant to Section C105.2.6."
5.   Revise Section C408.2.4.2 by replacing "permitted" with "allowed."
6.   Revise Section C408.2.5 to read:
"The construction documents shall specify that the documents described in this section be provided to the building owner or owner’s authorized agent within 90 days of project completion as evidenced by passing the last required final inspection or issuance of a certificate of occupancy, as applicable in accordance with the Chicago Construction Codes Administrative Provisions."
7.   Revise Section C408.3.1.1 by replacing "permitted" with "allowed."
8.   Revise Section C408.3.2 to read:
"The construction documents shall specify that the documents described in this section be provided to the building owner or owner’s authorized agent within 90 days of project completion as evidenced by passing the last required final inspection or issuance of a certificate of occupancy, as applicable in accordance with the Chicago Construction Codes Administrative Provisions."