Loading...
Backwater valves installed in a storm drainage system shall conform to Section 18-29-715.
Inside storm drainage conductors installed above ground shall conform to one of the standards listed in Table 18-29-702.1.
Underground building storm drain pipe shall conform to one of the standards listed in Table 18-29-702.2, except that neither polyvinyl chloride (PVC) nor polypropylene (PPL) pipe and fittings shall be allowed in stormwater detention applications as oversized pipe.
Building storm sewers shall conform to one of the standards listed in Table 18-29-702.3.
(Amend Coun. J. 3-27-02, p. 82090, §§ 1, 3; Amend Coun. J. 7-29-15, p. 3537, § 4)
Loading...