Flow coat operations shall comply with the requirements for dip tanks. The area of the sump and any area within 20 feet of the flow coat operations shall be considered the vapor area. Flow coat operations shall also conform to the following specific requirements:
(a) Paint or other flammable liquid shall be supplied by direct low pressure pumping arranged to automatically shut down by means of approved heat- actuated devices in the event of a fire.
(Prior code § 129.1-73)