CHAPTER 13-124
SAFEGUARDS DURING CONSTRUCTION – BUILDING SAFETY REQUIREMENTS
Article I.  Safeguards During Construction
13-124-010   Construction safeguards – Specifications.
13-124-015   Notice of demolition.
13-124-020   Construction loads.
13-124-030   Reserved.
13-124-040   Protection of floor openings.
13-124-050   Temporary flooring.
13-124-060   Demolition – Regulations.
13-124-070   Demolition – Notification of commissioner.
13-124-080   Demolition – Procedure.
13-124-081   Posting of sign required.
13-124-090   Wrecking operations – Time limitations.
13-124-100   Filling and grading of openings.
13-124-110   Debris removal.
13-124-120   Temporary structures – Reflective material required.
13-124-130   Walkways, barricades and fences – Generally.
13-124-140   Reserved.
13-124-150   Reserved.
13-124-160   Reserved.
13-124-170   Reserved.
13-124-180   Walkways and temporary sidewalks – Construction requirements.
13-124-190   Roofs and skylights of adjoining buildings.
13-124-200   Anchorage of party walls.
13-124-210   Reserved.
13-124-220   Reserved.
13-124-230   Reserved.
13-124-240   Reserved.
13-124-250   Reserved.
13-124-260   Reserved.
13-124-270   Reserved.
13-124-280   Reserved.
13-124-290   Reserved.
13-124-300   Reserved.
Article II.  Safety Requirements
13-124-310   Guards – Required.
13-124-320   Guards – Required – Where.
13-124-330   Guards – Types.
13-124-335   Openings in guards.
13-124-340   Window cleaning devices.
13-124-350   Safety glazing materials – Required – Where.
13-124-360   Safety glazing materials – Defined.
13-124-370   Safety glazing materials – Standards.
Article III.  Excavation Work on Private Property
13-124-380   Reserved.
13-124-390   Reserved.
13-124-400   Reserved.
13-124-410   Reserved.
13-124-411   Reserved.
13-124-420   Reserved.
13-124-430   Reserved.
13-124-440   Reserved.
13-124-450   Exemptions.