Skip to code content (skip section selection)
Compare to:

You are viewing an archived code

Loading...
18-29-1101.9  Backwater valves.
   Backwater valves installed in a storm drainage system shall conform to Section 18-29-715.
18-29-1102  Materials.
18-29-1102.1  General.
   The materials and methods utilized for the construction and installation of storm drainage systems shall comply with this section and the applicable provisions of Article 18-29-7.
18-29-1102.2  Inside storm drainage conductors.
   Inside storm drainage conductors installed above ground shall conform to one of the standards listed in Table 18-29-702.1.
18-29-1102.3  Underground building storm drain pipe.
   Underground building storm drain pipe shall conform to one of the standards listed in Table 18-29-702.2, except that neither polyvinyl chloride (PVC) nor polypropylene (PPL) pipe and fittings shall be allowed in stormwater detention applications as oversized pipe.
Loading...