Skip to code content (skip section selection)
Compare to:
Chicago Overview
Prior Chicago Building Code
BUILDING CODE AND RELATED EXCERPTS OF THE MUNICIPAL CODE OF CHICAGO
DIVISION 1 - ADMINISTRATION
DIVISION 2 - DEFINITIONS
DIVISION 3 - USE AND OCCUPANCY CLASSIFICATIONS
DIVISION 4 - SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY
DIVISION 5 - GENERAL BUILDING HEIGHTS AND AREAS
DIVISION 6 - TYPES OF CONSTRUCTION
DIVISION 7 - FIRE-RESISTANCE-RATED CONSTRUCTION
DIVISION 8 - INTERIOR FINISHES (NA)
DIVISION 9 - FIRE PROTECTION SYSTEMS
DIVISION 10 - MEANS OF EGRESS
DIVISION 11 - ACCESSIBILITY
DIVISION 12 - INTERIOR ENVIRONMENT
DIVISION 13 - ENERGY EFFICIENCY AND ENVIRONMENTAL PROTECTION
DIVISION 14 - EXTERIOR WALLS (NA)
DIVISION 15 - ROOF ASSEMBLIES AND ROOFTOP STRUCTURES (NA)
DIVISION 16 - STRUCTURAL DESIGN
DIVISION 17 - STRUCTURAL TESTS AND SPECIAL INSPECTIONS
DIVISION 18 - SOILS AND FOUNDATIONS
DIVISION 19 - CONCRETE
DIVISION 20 - ALUMINUM (NA)
DIVISION 21 - MASONRY
DIVISION 22 - STEEL
DIVISION 23 - WOOD
DIVISION 24 - GLASS AND GLAZING (NA)
DIVISION 25 - GYPSUM BOARD AND PLASTER (NA)
DIVISION 26 - PLASTIC (NA)
DIVISION 27 - ELECTRICAL
DIVISION 28 - MECHANICAL SYSTEMS
DIVISION 29 - PLUMBING SYSTEMS
DIVISION 30 - ELEVATORS AND CONVEYING SYSTEMS
DIVISION 31 - SPECIAL CONSTRUCTION (NA)
DIVISION 32 - ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY
DIVISION 33 - SAFEGUARDS DURING CONSTRUCTION
DIVISION 34 - EXISTING STRUCTURES
DIVISION 35 - REFERENCED STANDARDS

You are viewing an archived code

Loading...
4-108-210  Approval required.
   No vapor collection and recovery system shall be installed or operated unless the components comprising the system have been approved by the commissioner. It shall be the responsibility of the owner or operator of the subject gasoline fuel-dispensing facility to provide proof to the commissioner that the vapor collection and recovery system, as installed, meets the requirements promulgated by the commissioner for approval of the system.
(Added Coun. J. 12-9-92, p. 25465)
4-108-220  Training and instruction.
   The owner or operator of a gasoline fuel- dispensing facility shall train and instruct operators and employees of the gasoline dispensing facility in the proper operation and maintenance of the vapor collection and recovery system.
(Added Coun. J. 12-9-92, p. 25465)
4-108-230  Maintenance.
   The owner or operator of a gasoline-dispensing facility shall maintain all vapor collection and recovery equipment in accordance with the manufacturer's specifications and the regulations issued by the commissioner.
(Added Coun. J. 12-9-92, p. 25465)
4-108-240  Operating instructions.
   The owner or operator of a gasoline-dispensing facility shall post operating instructions for dispensing gasoline using the vapor collection and recovery system in a conspicuous and readily visible place within the gasoline-dispensing area. The physical specifications and language of these instructions must include:
   A.   A clear description of how to correctly dispense gasoline using the system;
   B.   A warning not to attempt continued refueling after automatic shutoff;
   C.   The telephone number of the department to report any problems experienced with the vapor collection and recovery system;
   D.   A warning that breathing gasoline vapors is hazardous to human health, and that the user is responsible for proper operation of the dispensing equipment; and
   E.   Such other information and warnings as the commissioner may require by regulations.
(Added Coun. J. 12-9-92, p. 25465)
4-108-250  Modification or removal – Defective or missing parts.
   No owner or operator of a gasoline-dispensing facility shall modify, remove, replace or otherwise change or render inoperative any element or component of the vapor collection and recovery system which would render the system incapable of collecting gasoline vapors in accordance with this article and the regulations issued by the commissioner. No owner or operator of a gasoline-dispensing facility shall allow the use of a vapor collection and recovery system with defective, malfunctioning or missing components.
(Added Coun. J. 12-9-92, p. 25465)
4-108-260  Sale or installation.
   No person shall sell, offer for sale or install any new or rebuilt vapor collection and recovery system equipment for use within the City of Chicago, unless the system, components and parts are approved by the commissioner.
(Added Coun. J. 12-9-92, p. 25465)
4-108-270  Time limits for compliance.
   A.   The owner or operator of a gasoline- dispensing facility shall comply with all provisions of this article in accordance with the earliest date of the following schedule:
      1.   Any licensee who installs new gasoline storage tanks or repairs or replaces existing tanks shall at the same time install a vapor collection and recovery system on the tanks.
      2.   The owner or operator of a gasoline- dispensing facility with an average monthly volume of gasoline of 100,000 gallons or more shall install and operate vapor collection and recovery devices on all gasoline-dispensing tanks and hoses within one year of the effective date of the ordinance codified in this article.
      3.   The owner or operator of a gasoline- dispensing facility with an average monthly volume of gasoline of at least 10,000 gallons but less than 100,000 gallons shall install and operate vapor collection and recovery devices on all gasoline-dispensing tanks and hoses within two years of the effective date of the ordinance codified in this article.
   B.   The owner and operator of a gasoline- dispensing facility shall report in writing to the commissioner on or before the ninetieth day following the effective date of the ordinance codified in this article, when the facility shall come into compliance with the terms of this section. It shall be the responsibility of the owner or operator to provide written proof to the commissioner demonstrating that the identified compliance date is in accord with the compliance dates set forth in this section.
(Added Coun. J. 12-9-92, p. 25465)
Loading...