Post-construction, the applicant shall comply with the following provisions.
(A) Road repairs. Any road damage caused by the construction of project equipment, the installation of the same, or the removal of the same, shall be repaired as per the road use and maintenance agreement approved by the Board of County Commissioners. The County Highway Superintendent may choose to require either remediation of road repairs upon completion of the project or is authorized to collect fees for oversized load permits. Further, a corporate surety bond, in an amount to be fixed by a professional engineer, may be required by the County Highway Superintendent to ensure the county that future repairs are completed to the satisfaction of the unit of local government. The cost of bonding is to be paid by the applicant.
(B) As-built plans requirement. Where upon completion of all development, the exact measurements of the location of utilities and structures erected during the development are necessary for public record and shall therefore be recorded. The applicant, owner, or operator shall submit a copy of the final construction plans (as-built plans), as amended, to the Planning Department with the exact measurements thereon shown. The Building Commissioner, after being satisfied that the measurements are substantially the same as indicated on the originally approved final plan(s), shall approve, date, and sign said construction plans for the project, which the applicant, owner, or operator shall then record.
(C) Change in ownership. It is the responsibility of the owner or operator listed in the application to inform the Planning Department of all changes in ownership and operation during the life of the project, including the sale or transfer of ownership or operation.
(Prior Code § 153.089) (Ord. 2019-03, passed 5-7-2019)