For individual lots disturbing less than one acre, developed within a larger permitted project, a formal review and issuance of an individual lot plot plan permit will be required before a building permit can be issued. The individual lot owner must complete a residential lot plot plan permit application, in accordance with the Stormwater Technical Standards Manual. In submitting the individual lot plot plan for plan review, applicable fees are due in accordance with the City of Carmel Department of Engineering fee ordinance. These fees are due before approval for a plan can be issued. The individual lot owner is responsible for installation and maintenance of all erosion and sediment control measures until the site is stabilized. In instances where an NOT has been issued to the developer and there are multiple lots being developed and a violation of this Article occurs that cannot be attributed to an individual lot owner, then all lot owners with active construction shall, collectively, be found in violation.
(Ord. D-1794-06, 2-6-06)