1191.04 PERMIT APPLICATION, CONTENT.
   The applicant for a conditional use permit for a wireless telecommunications facility, in addition to complying with all requirements contained in Chapter 1198 - Conditional Uses, shall provide the following information to the Zoning Inspector in conjunction with the application:
   (a)   A set of plans specifying applicant's proposed land use and building and tower elevation drawings which specify the colors and types of materials to be used.
   (b)   A tax map identifying lot numbers within a radius of 300 feet from the outside edge of the affected property, along with a list of property owners and addresses within the same 300-foot radius.
   (c)   A report certified by a licensed professional engineer certifying to the following:
      (1)   Collocation with an existing facility is not feasible.
      (2)   The tower is necessary at the specific site.
      (3)   A soil report has been prepared which complies with the standards of Appendix 1: Geotechnical Investigations, ANSI/EIA 222-F, as amended, which substantiates the ability to support the proposed design.
      (4)   An ice load report has been prepared which complies with ANSI/EIA Section 222-F (Annex H: Commentary on new ice design criteria for communications structures).
      (5)   The proposed tower complies with all state and federal laws and regulations concerning air safety.
      (6)   The number and types of antennas the tower can accommodate.
      (7)   The plan is in compliance with all natural resource protection standards including flood plains, wetlands and steep slope regulations.
      (8)   The tower and antenna will withstand wind gusts as specified in the Ohio Basic Building Code (OBBC).
      (9)   The foundation is designed to have a tower of up to 200 feet above the finished grade.
   (d)   Where the telecommunications facility is located on a property with another principal use, evidence of legal access from the owner of the property and that vehicular access is provided to the facility.
   (e)   A maintenance statement to the effect that the facility owner/operator shall be responsible for the upkeep of the site.
      (Ord. 147-2018. Passed 7-2-18.)