The Director, before issuing such permit, may require the permittee to submit detailed plans, profiles and specifications for such work as well as a topographical map for examination and approval by a consulting engineer to be selected by the City. The permittee shall pay the consulting fee of the engineer.
(Ord. 2919-65. Passed 7-6-65.)
(Ord. 2919-65. Passed 7-6-65.)