(b) By-Pass. All meters two inches or larger shall have a by-pass installed around the meter, with a by-pass valve sealed by the Water Department. Any tampering with the by- pass seal shall be dealt with as an unauthorized turn on and a twenty-five dollar ($25.00) fee shall be charged.
(c) Meter Pits. Eighteen inch diameter pits shall be constructed and maintained by the Water Department. Anything over eighteen inches in diameter shall be constructed per Village regulations at the property owner’s expense.
(Ord. 79-18. Passed 12-18-79.)
(a) The following water rates shall be in effect from the March meter reading date in 2009, through the February meter reading date in 2010.
User Class | User Charge 90% (per 100 cu. ft.) | Capital Charge 10% (per 100 cu. ft.) | Commodity Charge (per 100 cu. ft.) |
Inside rate | |||
0 to 200 cu. ft. | 4.50 | 0.50 | 5.00 |
All over 200 cu. ft. | 3.60 | 0.40 | 4.00 |
Outside rate | |||
0 to 200 cu. ft. | 9.00 | 1.00 | 10.00 |
All over 200 cu. ft. | 7.20 | 0.80 | 8.00 |
(b) The following water rates shall be in effect from the January 2015 usage and meter reading and February 2015 bill, and each year thereafter:
User Class | User Charge 92% (per 100 cu. ft.) | Capital Charge 08% (per 100 cu. ft.) | Commodity Charge (per 100 cu. ft.) | |||||||||
2010 | 2011 | 2015 | 2016, and each year thereafter | 2010 | 2011 | 2015 | 2016, and each year thereafter | 2010 | 2011 | 2015 | 2016, and each year thereafter | |
Inside rate | ||||||||||||
0 to 200 cu. ft. | $4.83 | $5.06 | $5.36 | 2% increase | $0.42 | $0.44 | $0.47 | 2% increase | $5.25 | $5.50 | $5.83 | 2% increase |
All over 200 cu. ft. | $3.83 | $3.97 | $4.20 | 2% increase | $0.33 | $0.35 | $0.37 | 2% increase | $4.16 | $4.32 | $4.57 | 2% increase |
Outside Rate | ||||||||||||
0 to 200 cu. ft. | $9.66 | $10.12 | $10.73 | Double Inside Rates | $0.84 | $0.88 | $0.93 | Double Inside Rates | $10.50 | $11.00 | $11.66 | Double Inside Rates |
All over 200 cu. ft. | $7.66 | $7.95 | $8.42 | Double Inside Rates | $0.66 | $0.69 | $0.73 | Double Inside Rates | $8.32 | $8.64 | $9.15 | Double Inside Rates |
(Ord. 2014-08. Passed 9-2-14.)
(a) The following minimum cubic feet billed for each meter size shall be billed at the current rates, beginning with January 2015 usage and meter reading and February 2015 bill, and a 2% increase each year thereafter.
(1) Inside rates.
Meter Size | Cubic Feet | 4.60/3.50 2008 | 5.00/4.00 2009 | 5.25/4.16 2010 | 5.50/4.32 2011 | 5.83/4.57 (base rates) 2015 | 2016, and each year thereafter |
5/8" | 200 | $9.20 | $10.00 | $10.50 | $11.00 | $11.66 | 2% increase on base rates for each meter size |
3/4" | 500 | $19.70 | $22.00 | $22.98 | $23.96 | $25.37 | |
1" | 600 | $23.20 | $26.00 | $27.14 | $28.28 | $29.94 | |
1-1/4" | 800 | $30.20 | $34.00 | $35.46 | $36.92 | $39.08 | |
1-1/2" | 1100 | $40.70 | $46.00 | $47.94 | $49.88 | $52.70 | |
2" | 1600 | $58.20 | $66.00 | $68.74 | $71.48 | $75.64 | |
3" | 4800 | $170.20 | $194.00 | $201.86 | $209.72 | $221.88 | |
4" | 6400 | $226.20 | $258.00 | $268.42 | $278.84 | $295.00 | |
(2) Outside rates. The minimum outside water rate charges are double the inside charges on each water meter size.
(3) All calculations shall be rounded up at .5¢ to get to the nearest penny.
(4) Council may suspend the two percent (2%) rate increase from year to year, by approval of Council, if revenue exceeds expectation.
(Ord. 2014-08. Passed 9-2-14.)
The following fees for water service taps will be effective as of the effective date of this section:
(a) Inside Corporation Tap Fees.
(1) All tap fees shall be the current cost of material plus ten percent (10%).
(2) In addition to the tap fee, when applicable, material costs will be added such as street opening, sidewalk opening, boring fees, etc.
(b) Outside Corporation Tap Fees. All outside tap fees and applicable charges are double the inside fees.
(c) Tap Removal Fee. When demolition of a structure occurs, and it is determined the service to that structure is no longer needed, a tap removal charge shall be added to the demolition permit.
Tap removal fees shall be the current cost of material plus ten percent (10%).
(Ord. 2005-06. Passed 12-6-05.)
(a) The following services will be provided at the fee set forth opposite the service:
Meter test | $10.00 |
Turn-on after hours | Average hourly wage x 2 hours |
Turn-off after hours | Average hourly wage x 2 hours. |
(Ord. 93-02. Passed 2-2-93.)
(b) Plumbers may use the Village meter key for residential shut-off if provisions are made with the Village Administrator.
(Ord. 80-5. Passed 3-18-80.)
(Ord. 80-5. Passed 3-18-80.)