1305.25 SUBDIVISIONS AND LARGE DEVELOPMENTS.
   (a)   All subdivision proposals shall be consistent with the need to minimize flood damage and are subject to all applicable standards in these regulations;
   (b)   All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage;
   (c)   All subdivision proposals shall have adequate drainage provided to reduce exposure to flood damage; and
   (d)   In all areas of special flood hazard where base flood elevation data are not available, the applicant shall provide a hydrologic and hydraulic engineering analysis that generates base flood elevations for all subdivision proposals and other proposed developments containing at least 50 lots or 5 acres, whichever is less.
   (e)   The applicant shall meet the requirement to submit technical data to FEMA in Section 1305.20(a)(1)D. when a hydrologic and hydraulic analysis is completed that generates base flood elevations as required by Section 1305.25(d).
(Ord. 09-353. Passed 11-18-09.)