909.05 OPENINGS IN NEW PAVEMENTS.
   New pavements shall be considered those pavements which have been newly constructed in part, or in total or newly resurfaced in part, or in total in the five-year period prior to the permit application date.
   Permit fees for openings in new pavements shall be five times the normal fee as outlined in Section 909.02, and permits in new pavements shall be issued only with written approval of the Engineering Commissioner. The increase in fee shall not apply to inspection charges or restoration charges.
   In the case of long line permits in new pavements, the fee shall be five times the normal fee as outlined in Section 909.03, and permits shall be issued only after approval of detailed plans and with written approval of the Engineering Commissioner. In the event of a long line street opening for a roadway which had been newly constructed in part, or in total or newly resurfaced in part, or in total in the three-year period prior to the permit application date, the Engineering Commissioner reserves the right to require full-width restoration and paving of the affected area of roadway at the applicant’s expense.
(Ord. 10-333. Passed 10-20-10.)