909.03 LONG LINE PERMIT; FEES.
   A long line permit shall be issued by the Engineering Commissioner to cover work considered to be of a continuous nature over a relatively long length of right of way, specifically in the case of the installation of new lines, piping or conduits or the replacement of lines, piping or conduits where the length of the work exceeds 50 linear feet. Fees for a long line permit shall be paid, upon application, to the City Finance Director in accordance with the following schedule:
 
 
Long Line Permit Fees Per Opening
(a)    Limited Access Expressways
$1,000.00*
(b)    Major Streets
$200.00*
(c)    Secondary Major Streets
$100.00*
(d)    Central Business District Streets
$200.00*
(e)    Residential Streets and All Others
$50.00*
*   Plus $10.00 for every 100 foot section after the initial 50 feet covered by the base permit fee.
   Inspection charges shall be due and payable upon invoice by the Engineering Commissioner and shall be kept current. Failure to maintain a current account will be just cause for the refusal of all future permits of any type. Detailed plans governing long line work shall be submitted at least ten days prior to permit application for approval by the Engineering Commissioner. No permit governing this work will be issued prior to approval of detailed plans. Plan approval includes location of work, methods of construction, types of materials, pedestrian and vehicular traffic controls, types of pavement restoration, lawn restoration, time limits and any other requirement deemed necessary to insure the public health, safety and welfare.
(Ord. 10-333. Passed 10-20-10.)