Whenever the Engineer finds that it is necessary for any person to construct a connection to any sewer of eighteen (18") inches in diameter, or smaller, where no Y or T spur branch or other structural opening exists, the contractor or person doing the work shall excavate to the sewer at the point where the connection is being made, and the sewer maintenance forces of the District shall then cut the required hole in the sewer top and install a saddle furnished by the District for the connection. The additional fee for tapping the sewer and furnishing and installing the saddle shall be Twenty-Five and no/100ths ($25.00) Dollars. Sewers over eighteen (18") inches in diameter, where a saddle is required to be installed, shall be handled on an individual basis in the same manner at the actual cost of making the connection. (§ 309, Ord. 497; as amended by § 2, Ord. 1470, eff. July 14, 2016)