Sec. 8-2.705.   Table of Development Requirements.
   The following Table 8-2.705 identifies the development requirements, including minimum parcel sizes, setbacks, and other standards that allowed and permitted uses in the industrial zones must meet as a standard or condition of any issued building permit, Site Plan Review, or Use Permit.
Table 8-2.705
Development Requirements in Industrial Zones
(2)
 
I ZONE
Minimum Lot Area (acres or square ft) (1)
Front Yard Setback (feet)
Rear Yard Setback (feet)
Side Yard Setback (feet)
Height Limits(2) (feet)
Maximum Floor Area Ratio (3)
Maximum Impervious Lot Coverage
I-L
5,000 square feet
None (5)
None, except 25 feet if abutting residential zone (5)
Maximum of 45 feet or four stories
0.5
90%
I-H
5,000 square feet
None, except 50 feet if abutting residential zone (5)
OPRD
1.5 acres
10 feet or according to an approved Planned Development Ordinance
10 feet, except 20 feet if abutting residential
None, except 20 feet if abutting residential
Maximum of 65 feet or five stories
1.0
75%
 
Notes:
(1)   Parcels in rural areas with no access to public water and/or wastewater services are subject to 2.0 acre minimum parcel sizes for new building permits, see Section 8-2.1002(a).
(2)   Appropriate findings for discretionary projects, and ministerial residential projects, located within the floodplain are required, see Section 8-2.306(ae). Structures built in the 100-year flood plain to comply with FEMA and local requirements will be measured from the top of the bottom floor, which may include a basement, crawlspace, or enclosed floor.
(3)   See definition in Sec. 8-2.607.
(4)   Development near the toe of any levee is restricted, see Section 8-2.306(ad).
(5)   For cannabis uses, see Article 14 (Cannabis Land Use Ordinance) for setbacks and buffer requirements.
(Ord. 1445, eff. August 14, 2014; as amended by Ord. 681.229, eff. October 29, 2015; as amended by § 2, Ord. 1497, eff. June 7, 2018; as amended by § 2, Ord. 1545, eff. January 6, 2022)