Section
General Provisions
50.001 Definition
50.002 Fees
50.003 Protection of permanent electrical equipment from damage by other work
50.004 Accessibility of installations
50.005 Telephone information
50.006 Exemptions
Demand Response Program
50.020 Authority
50.021 City as sole entity permitted to aggregate retail customer’s demand response and bid demand response
50.022 Program participation required for retail customers desiring to bid demand response
50.023 City sole entity permitted to bid demand response on behalf of retail customers
50.024 Retail customers must participate in city-approved program to bid demand response into independent system
50.025 Authority to adopt regulations to implement subchapter
50.999 Penalty
GENERAL PROVISIONS
As used in this chapter, the term EMERGENCY SYSTEM shall mean the installation, operation and maintenance of circuits, systems and equipment intended to supply illumination and power in the event of failure of the normal supply or in the event of accident to elements of a system supplying power and illumination essential for safety to life and property, as herein required.
(Prior Code, § 9-1) (Ord. 597, passed 11-7-1977; Ord. 770, passed 8-27-1984)
(A) Fees under this chapter shall be as follows:
Additional inspection | $40 |
Base minimum fee | $40 |
Final circuit (first) | $20 |
Each additional final circuit residential | $7 |
Each additional final circuit commercial | $10 |
License registration | $45 |
Low voltage wiring | |
Office partitions (first unit) | $25 |
Each additional partitions | $3 |
Low voltage 1 to 1,000 feet | $35 |
Each additional 1,000 feet | $3 |
Minor repairs | $40 |
Motors (first unit) | $40 |
Each additional unit in the same building | $15 |
Reinspection fee | $40 |
Rough circuit (first) | $20 |
Each additional rough circuit residential | $7 |
Each additional rough circuit commercial | $10 |
Service change | |
100 AMP | $30 |
150 AMP | $35 |
200 AMP | $40 |
400 AMP | $60 |
Over 400 AMP | $60, plus $25 per 100 AMP |
Temporary service | $40 |
Special fees | |
Administration fee | $30 |
License registration fee | $15 |
Late fee | $25 |
(B) If a permit is not obtained before the work is started, a late fee of $125 will be charged in addition to regular permit fee.
(Prior Code, § 9-2) (Ord. 597, passed 11-7-1977; Ord. 770, passed 8-27-1984; Ord. 892, passed 7-23-1990; Ord. 1182, passed 10-20-2003; Ord. 1230, passed 7-11-2005; Ord. 1238, passed 8-29-2005; Ord. 1256, passed 12-12-2005)
Electrical contractors shall in no case install permanent electrical equipment that may be damaged by the roughing in of heating, ventilation and plumbing construction.
(Prior Code, § 9-3) (Ord. 597, passed 11-7-1977; Ord. 770, passed 8-27-1984; Ord. 892, passed 7-23-1990) Penalty, see § 50.999
No installation of plumbing equipment, refrigeration equipment, space heating equipment, duct work, cabinets, partitions or materials shall be made in such a way as to render the wiring in any electrical service equipment, distribution panel, outlet, splice, junction or pull box inaccessible.
(Prior Code, § 9-4) (Ord. 597, passed 11-7-1977; Ord. 770, passed 8-27-1984; Ord. 892, passed 7-23-1990) Penalty, see § 50.999
The electrical inspection authority shall not be responsible for code interpretations or other information relative to electrical installations given over the telephone. Requests for such information should be made in person or in writing.
(Prior Code, § 9-5) (Ord. 597, passed 11-7-1977; Ord. 770, passed 8-27-1984; Ord. 892, passed 7-23-1990)