150.097: PLUMBING FEE SCHEDULE:
   A.   Table:
There shall be a $5.00 inspection fee, plus the following:
Water:
     Building water line
$ 10.00
     The first fixture or opening, plus $0.75 for each additional fixtures or openings
5.00
Sewer:
     Building sewer line
10.00
     The first fixture or opening, plus $0.75 for each additional fixtures or openings
5.00
     Septic tank, plus $0.10 per foot for lateral lines
25.00
     Grease, oil or sand interceptor
25.00
     Sewer tap on unpaved street or alleyway
85.00
     Sewer tap on paved street or alleyway
350.00
     Each additional call which the code officer has to make due to incomplete or unapproved work
10.00
 
   B.   Double Fee: Work that is started before a permit is acquired, the fee will be doubled. (2001 Code § 150.097)