A. Table:
There shall be a $5.00 inspection fee, plus the following: | |
Water: | |
Building water line | $ 10.00 |
The first fixture or opening, plus $0.75 for each additional fixtures or openings | 5.00 |
Sewer: | |
Building sewer line | 10.00 |
The first fixture or opening, plus $0.75 for each additional fixtures or openings | 5.00 |
Septic tank, plus $0.10 per foot for lateral lines | 25.00 |
Grease, oil or sand interceptor | 25.00 |
Sewer tap on unpaved street or alleyway | 85.00 |
Sewer tap on paved street or alleyway | 350.00 |
Each additional call which the code officer has to make due to incomplete or unapproved work | 10.00 |
B. Double Fee: Work that is started before a permit is acquired, the fee will be doubled. (2001 Code § 150.097)