It shall be unlawful for any person to use or operate in connection with the drilling or reworking of any well within the city limits any wooden derrick or any steam-powered rig, and all engines shall be equipped with adequate mufflers approved by the Oil and Gas Well Inspector; or to permit any drilling rig or derrick to remain on the premises or drilling site for a period longer than 60 days after completion or abandonment of the well. At all times from the start of erection of a derrick, or a mast, or a gin-pole, until the well is abandoned and plugged or completed as a producer and enclosed with a fence as herein provided, the permittee shall keep a watchman on duty on the premises at all times; provided, that it shall not be necessary to keep an extra watchman on duty on the premises when other workers or permittees are on such premises.
(Prior Code, § 18-11) Penalty, see § 155.99