8-4B-2: DEFINITIONS:
   A.   Terms or acronyms used in this article shall, unless defined in this article, have the meanings given to them in section 8-4-1 of this chapter.
APPLICANT: Also includes any person that has had a state permit issued to it, including, but not limited to, a secondary applicant.
APPLICANT'S ENGINEER: A licensed professional engineer, registered architect, registered landscape architect, licensed professional land surveyor, construction contractor, or any other person as expressly and specifically approved by the city engineer who is deemed qualified to prepare an SWPPP in accordance with good engineering practices.
CSR PERMIT: A permit issued by the city engineer as provided in section 8-4B-7 of this article for all construction sites from which a discharge of stormwater is possible.
CITY ENGINEER: Includes any other representative of the city engineer's office that is designated by the city engineer to act in the place and with the authority of the city engineer. As so defined, the city engineer is also referred to in this article as the "enforcement officer".
SWPPP MANAGER: A person qualified by sufficient knowledge of SWPPP design and implementation and of applicable regulations to perform the inspection, monitoring, enforcement and reporting necessary to comply with the state permit, SWPPP requirements and city regulations as applicable. The SWPPP manager, unless otherwise specified in writing by the applicant, shall serve as the point of contact for the city engineer for all matters pertaining to SWPPP compliance for the site.
SECONDARY APPLICANT: Any applicant that is the transferee of responsibility under the state permit and an SWPPP with respect to a single lot that was, as to any predecessor applicant, part of a larger common plan of housing development.
STATE PERMIT: A state NPDES general permit no. 2 issued by IDNR. (Ord. 5218, 5-19-2014)