§ 153.23 PROPOSED CONSTRUCTION; CAPITAL IMPROVEMENTS.
   (A)   Any operator desiring to erect or construct any new or renovated permanent or temporary structure, landscaping, signs or support facilities at the airport shall submit plans and specifications to the Airport Commission and Town Council for review and approval. No such approval shall be granted unless such construction and design is consistent with the airport layout plan (ALP) drawing. The plans shall include a general layout, drawn to scale, showing said structure (site location, building, ground and top elevations and aesthetic and decorative features), access and proposed boundary of leasehold area, plus a completed FAA Form 7460 “Notice of Proposed Construction or Alteration”.
   (B)   The Town Council, prior to construction, shall submit this information to the NCDOT, Division of Aviation/FAA for review and airspace determination.
      (1)   Before construction of facilities and equipment is undertaken, the operator must furnish the Airport Commission/Town Council with a performance bond commensurate with the construction costs to be performed.
      (2)   The building structure shall be constructed in accordance with State Building Codes and National Fire Protection Association (NFPA) standards.
      (3)   All such building permits, licensing and environmental certifications shall be obtained by the operator prior to construction. A certificate of occupancy must be obtained before the structure can be occupied.
      (4)   No operator shall erect advertising or vendor signs at the airport without express written permission of the Airport Commission/Town Council.
(Ord. passed - -2019) Penalty, see § 153.99