Section
General Provisions
51.01 Purpose and policy
51.02 Definitions
51.03 Abbreviations
Use of Public Sewers
51.10 Mandatory sewer connection
51.11 Unlawful discharge to storm sewers or natural outlets
51.12 Compliance with local, state and federal laws
51.13 Discharge of unpolluted waters into sewer
51.14 Substances which interfere
Private Wastewater Disposal
51.20 Public sewer not available
51.21 Requirements for installation
Building Sewers and Connections
51.30 Permits
51.31 Prohibited connections
51.32 Design and installation
51.33 Inspections
Pollutant Discharge Limits
51.40 General conditions
51.41 Restricted discharges
51.42 Dilution of wastewater discharge
51.43 Grease, oil, and sand interceptors
51.44 Special industrial pretreatment requirements
51.45 Protection from accidental discharge
51.46 State requirements
51.47 City's right of revision
51.48 Federal categorical pretreatment standards
Pretreatment Program Administration
51.50 Wastewater discharge
51.51 Industrial user discharge permit
51.52 Permit modifications
51.53 Permit conditions
51.54 Permit duration
51.55 Permit transfer
51.56 Reporting requirements for permittee
51.57 Permit violations
51.58 Monitoring
51.59 Inspection and sampling
51.60 Pretreatment
51.61 Confidential information
Fees
51.70 Purpose
51.71 Charges and fees
51.72 Specific fees for water services and administrative costs
Powers and Authority of Inspectors
51.80 Right to enter premises
51.81 Right to obtain information regarding discharge
51.82 Access to easements
51.83 Safety
51.84 Hauled wastewater
Enforcement
51.90 Informal notice to industrial user
51.91 Formal notice
51.99 Penalties