4-02.4.0   MODIFICATIONS
4.1   A minor encroachment modification may be requested for necessary development in addition to the roadway, bike path, paved trail and utility improvements as provided in Technical Standard 4-02.2.5.B.2 above. A minor encroachment under this subsection shall be approved if the loss of riparian resources does not impair the function of the habitat and the mitigation provides riparian resources of greater value if the request is granted. A modification under this subsection shall not exceed 5% of the total area of the protected riparian area on the . The mitigation shall be provided on a three to one ratio of new habitat for disturbed habitat. The mitigation shall be within the protected riparian area or an area that directly connects with the protected riparian areas. The mitigation shall be integrated with, and function as a part of, the protected riparian areas. The requirements for the Environmental Resource Report may be modified by PDSD staff as may be appropriate to document a minor encroachment under this subsection.
4.2   Technical Standard Modification Requests are processed in accordance with Section 1-01.6.0.
4.3   Either the applicant or the PDSD Director can refer a Technical Standard Modification Request to this standard to the Advisory Committee or the Technical Advisory Committee for recommendation.