(A) Notice. Within 90 days following written notice from the city, a utility shall, at its own expense, protect, support, temporarily or permanently disconnect, remove, relocate, change or alter the position of any utility facilities within the rights-of-way whenever the corporate authorities have determined that such removal, relocation, change or alteration, is reasonably necessary for the construction, repair, maintenance or installation of any city improvement in or upon, or the operations of the city in or upon, the rights-of-way.
(B) Removal of unauthorized facilities. Within 30 days following written notice from the city, any utility that owns, controls or maintains any unauthorized facility or related appurtenances within the rights-of-way shall, at its own expense, remove all or any part of such facilities or appurtenances from the rights-of-way. A facility is unauthorized and subject to removal in the following circumstances:
(1) Upon expiration or termination of the permittee's license or franchise, unless otherwise permitted by applicable law;
(2) If the facility was constructed or installed without the prior grant of a license or franchise, if required;
(3) If the facility was constructed or installed without prior issuance of a required permit in violation of this chapter; or
(4) If the facility was constructed or installed at a location not permitted by the permittee's license or franchise.
(C) Emergency removal or relocation of facilities. The city retains the right and privilege to cut or move any facilities located within the rights-of-way of the city, as the city may determine to be necessary, appropriate or useful in response to any public health or safety emergency. If circumstances permit, the municipality shall attempt to notify the utility, if known, prior to cutting or removing a facility and shall notify the utility, if known, after cutting or removing a facility.
(D) Abandonment of facilities. Upon abandonment of a facility within the rights-of-way of the city, the utility shall notify the city within 90 days. Following receipt of such notice the city may direct the utility to remove all or any portion of the facility if the City Engineer determines that such removal will be in the best interest of the public health, safety and welfare. In the event that the city does not direct the utility that abandoned the facility to remove it, by giving notice of abandonment to the city, the abandoning utility shall be deemed to consent to the alteration or removal of all or any portion of the facility by another utility or person.
(Ord. 2022-61, passed 11-7-2022)
The utility shall remove all excess material and restore all turf and terrain and other property within ten days after any portion of the rights-of-way are disturbed, damaged or destroyed due to construction or maintenance by the utility, all to the satisfaction of the city. This includes restoration of entrances and side roads. Restoration of roadway surfaces shall be made using materials and methods approved by the City Engineer. Such clean-up and repair may be required to consist of backfilling, regrading, reseeding, resodding or any other requirement to restore the right-of-way to a condition substantially equivalent to that which existed prior to the commencement of the project. The time period provided in this section may be extended by the City Engineer for good cause shown.
(Ord. 2022-61, passed 11-7-2022)
(A) General. Facilities on, over, above, along, upon, under, across or within rights-of-way are to be maintained by or for the utility in a manner satisfactory to the city and at the utility's expense.
(B) Emergency maintenance procedures. Emergencies may justify noncompliance with normal procedures for securing a permit.
(1) If an emergency creates a hazard on the traveled portion of the right-of-way, the utility shall take immediate steps to provide all necessary protection for traffic on the highway or the public on the right-of-way including the use of signs, lights, barricades or flaggers. If a hazard does not exist on the traveled way, but the nature of the emergency is such as to require the parking on the shoulder of equipment required in repair operations, adequate signs and lights shall be provided. Parking on the shoulder in such an emergency will only be permitted when no other means of access to the facility is available.
(2) In an emergency, the utility shall, as soon as possible, notify the City Engineer or his or her duly authorized agent of the emergency, informing him or her as to what steps have been taken for protection of the traveling public and what will be required to make the necessary repairs. If the nature of the emergency is such as to interfere with the free movement of traffic, the City Police shall be notified immediately.
(3) In an emergency, the utility shall use all means at hand to complete repairs as rapidly as practicable and with the least inconvenience to the traveling public.
(C) Emergency repairs. The utility must file in writing with the city a description of the repairs undertaken in the right-of-way within 48 hours after an emergency repair.
(Ord. 2022-61, passed 11-7-2022)
(A) Request for variance. A utility requesting a variance from one or more of the provisions of this chapter must do so in writing to the City Engineer as a part of the permit application. The request shall identify each provision of this chapter from which a variance is requested and the reasons why a variance should be granted.
(B) Authority to grant variances. The City Engineer shall decide whether a variance is authorized for each provision of this chapter identified in the variance request on an individual basis.
(C) Conditions for granting of variance. The City Engineer may authorize a variance only if the utility requesting the variance has demonstrated that:
(1) One or more conditions not under the control of the utility (such as terrain features or an irregular right-of-way line) create a special hardship that would make enforcement of the provision unreasonable, given the public purposes to be achieved by the provision; and
(2) All other designs, methods, materials, locations or facilities that would conform with the provision from which a variance is requested are impracticable in relation to the requested approach.
(D) Additional conditions for granting of a variance. As a condition for authorizing a variance, the City Engineer may require the utility requesting the variance to meet reasonable standards and conditions that may or may not be expressly contained within this chapter but which carry out the purposes of this chapter.
(E) Right to appeal. Any utility aggrieved by any order, requirement, decision or determination, including denial of a variance, made by the City Engineer under the provisions of this chapter shall have the right to appeal to the City Council, or such other committee, board or commission as it may designate. The application for appeal shall be submitted in writing to the City Clerk within 30 days after the date of such order, requirement, decision or determination. The City Council shall commence its consideration of the appeal at the Council's next regularly scheduled meeting occurring at least seven days after the filing of the appeal. The City Council shall timely decide the appeal.
(Ord. 2022-61, passed 11-7-2022)
Nothing in this chapter shall be construed as limiting any additional or further remedies that the city may have for enforcement of this chapter.
(Ord. 2022-61, passed 11-7-2022)