9-4-4: APPLICATION AND REVIEW PROCEDURE:
   A.   Lighting Plans Required: All sign permit applications, building permit applications and design development review applications shall include a lighting plan that shows evidence that the proposed lighting fixtures and light sources will comply with this chapter and shall include the following:
      1.   Plans or drawings indicating the proposed location of lighting fixtures, height of lighting fixtures on the premises, and type of illumination devices, lamps, supports, shielding and reflectors used and installation and electrical details.
      2.   Illustrations, such as contained in a manufacturer's catalog cuts, of all proposed lighting fixtures. For commercial uses, photometric diagrams of proposed lighting fixtures are also required. In the event photometric diagrams are not available, the applicant must provide sufficient information regarding the light fixture, bulb wattage and shielding mechanisms for the planning commission to be able to determine compliance with the provisions of this chapter.
      3.   A table showing the total amount of proposed exterior lights, by fixture type, wattage, lumens and lamp type.
   B.   Approval Procedure:
      1.   The lighting plan for all new development shall be submitted for approval concurrent with the associated application process. (Ord., 3-10-2016)
      2.   A certificate of occupancy shall not be issued until such time as the property is subject to a postinstallation nighttime inspection by the building inspector. (Ord., 3-10-2016; amd. 2016 Code)