8-1-8: USE OF WATER DURING BUILDING CONSTRUCTION:
   A.   Permit Requirements: Persons intending to build or repair any building who require water from the waterworks shall make application to the superintendent, furnishing a certificate of the architect or builder of the amount and kinds of materials to be used in such work, and the other uses for which water will be required, and pay the schedule rates therefor. The Superintendent shall thereupon grant a permit to the applicant for the use of water for such work to the extent of the work returned by the architect or builder. Any abuse of this privilege or neglect, to guard against the use of such water for other than the purposes specified in the permit, shall subject the applicant to having the water cut off. (1993 Code p. 64 § 403.4-9)
   B.   Supply Of Water; Costs: When connection is made to supply water for building purposes, the service pipe shall be carried at the expense of the person holding the permit to the inside of the curb line within six feet (6') of the street line where a curb cock shall be placed with a pipe leading to the surface, the faucet of which shall be kept covered and locked when not in use. When building is completed, the faucet and pipe shall be taken up and the water shut off at the curb cock. (1993 Code p. 65 § 403.4-20)