1076.05   CONSTRUCTION.
   Construction activities on any lot shall comply with this chapter, SWPPP or the following regulations if the construction site does not meet the State requirements for the filing of a SWPPP.
   (a)    Sediment control measures shall be in place and comply with the SWPPP filed by the original subdivider or land developer. Under no circumstances shall sediment be allowed to wash onto adjacent property, streets, alleys or any other property.
   (b)   Owner or contractor shall sign an agreement acknowledging they will comply with all terms and conditions of the SWPPP. Violation of the SWPPP will result in immediate suspension of the building permit and other penalties as listed in Section 1076.06.
   (c)   Owner or contractor shall not regrade the lot so that the original lot grading is changed from that as in the subdivision or land development plans as approved by the City. Any change to the lot grading will result in an immediate suspension of the building permit. Corrections to the grading shall be completed immediately at the sole expense of the owner. Failure to comply shall result in penalties as listed in Section 1076.06.
   (d)   Owner or contractor shall be solely responsible for all costs and work required to correct damage to other properties affected by failing to comply with this chapter.
(Ord. 1699. Passed 8-27-13.)