(A) When the village issues a permit based upon an application for a connection with the waterworks system, the village will furnish and install three-quarter inch copper tubing of up to 60 feet; and in addition, will provide and install the corporation stop, meter pit, meter box cover, three-quarter inch meter, meter yoke and three-quarter-inch saddle. All property furnished and materials utilized will remain the property of the village.
(B) If the applicant wishes a larger scale copper tubing, and so states in his or her application, he or she will be required to pay the cost difference between the requested tubing and the three-quarter inch tubing provided normally by the village.
(C) For each installation requiring more than the standard three-quarter-inch service, the village will provide to the applicant a cost estimate sheet which shall be prepared by the Water Superintendent, or his designee, and will include a reasonable estimate of the cost of materials, use of specialized equipment, labor (at its cost to the village), and administrative fee as set by the Water Superintendent or the Water Committee. The applicant shall pay this cost estimate in full prior to the materials for the installation being ordered. Any amounts left over from the estimate shall be refunded to the applicant and any cost overruns which are a result of unforeseen circumstances, shall be paid by the applicant upon completion of the installation.
(Prior Code, § 50B.021) (Ord. 88-005, passed 1-19-1988; Ord. 90-004, passed 9-18-1990; Ord. 90-005, passed 10-16-1990)