The Building Commissioner may waive or modify the requirements of this chapter for plans, specifications, field observation testing and summary reports if the application for a permit or a certificate in writing of a geotechnical engineer states, to the satisfaction of the Commissioner, that the proposed excavation or fill:
(A) Will not interfere with adequate drainage for the site area and the drainage area of land tributary to the site;
(B) Will not obstruct, damage or adversely affect existing sewerage or drainage, public or private;
(C) Will not cause a stagnant pond of water to form;
(D) Will not create slope stability problems on subject and adjacent property;
(E) Will not cause detrimental erosion or sedimentation; or
(F) Is in an isolated, self-contained area and there is no apparent danger to adjacent public or private property.
(`82 Code, § 1492.07) (Ord. 82-57, passed 8-17-82)