Section
50.01 Abbreviations
50.02 Definitions
50.03 Placing of objectionable material prohibited
50.04 Suitable sanitary facilities required
50.05 Private sewage disposal systems within the corporate boundaries of the city
50.06 Building sewer permits
50.07 Cost of installation
50.08 Independent sewer
50.09 Examination of old building sewers required before use
50.10 Conformance with codes required for building sewers
50.11 Gravity flow
50.12 Connection of runoff or groundwater with sanitary sewer prohibited
50.13 Inspection required for building sewers
50.14 Building sewer connection requirement
50.15 Discharging certain waters and substances
50.16 Grease, oil, and sand interceptors required
50.17 Preliminary treatment facilities
50.18 Tests, measurements, analyses
50.19 Damaging, destroying municipal wastewater system
50.20 Persons permitted to enter properties for inspection
50.21 Exemptions
50.22 Wastewater system extension rules and procedures
50.23 Wastewater extensions outside corporate limits
50.24 Due process
50.25 Jurisdiction
50.99 Penalty
Cross-reference:
Industrial wastewater pretreatment, see Chapter 56.