Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. When the building drain is too low to permit gravity flow to the public sewer, sanitary wastewater carried by the building drain shall be lifted by any means approved by the Superintendent and discharged to the building sewer.
(Ord. 12-2001, passed 5-7-01) Penalty, see § 50.99