Fee | |
(a) Administrative Code. | |
Initial booking/registration fee per jail confinement | $25.00 |
Breath or chemical test fee | $15.00 |
Fingerprinting | |
Resident | 12.00 |
Non-Resident | 35.00 |
(This fee shall be credited to the “Detention Center Revenue Fund”) | |
WEBCheck (BCI) | 22.00 |
National WEB check (FBI) | 25.25 |
(This fee shall be credited to the “WEBCheck Program Fund”) | |
Report fee | $.25 per sheet |
Traffic crash report fee | $4.00 per report |
Accident photo fee, each photo | photo reproduction $8.00 |
Department Video | 25.00 per tape, including up to ½ hour of recording, plus an additional $20.00 for each additional ½ hour or portion thereof of recording |
Tow release | $25.00, however, this fee shall not apply to an innocent owner, including, without limitation, a victim of crime |
Overnight winter parking permit fee | $25.00 per permit (per winter season of November 1st through April 15th) |
Safety Town fee | Non-refundable $40.00 per child, per year |
Special events | |
Non-City sponsored events, i.e. race events | Auxiliary police officer: Standard auxiliary police hourly rate |
Parma police officer: Straight hourly rate | |
Funds collected for auxiliary police services shall be paid directly to the Parma Auxiliary Police. | |
(b) Traffic Code. | |
Bicycle license, permanent | 1.00 |
Heavy load permit | 75.00 |
(c) Business Regulation Code. (Annual fees due by January 31 unless otherwise stated) | |
Abortion service license | 650.00 |
Adult entertainment business application and investigation fee (annual and renewal) | 650.00 |
Adult entertainment business license fee | 400.00 |
(annual fee due 30 days after issuance of new or renewal adult entertainment business license) | |
Adult entertainment employee application and investigation fee (annual and renewal) | 100.00 each employee |
Adult entertainment employee license fee | 75.00 each employee |
(annual fee due 30 days after issuance of new or renewal adult entertainment employee license) | |
Amusement machines, coin-operated, annual | 45.00 each |
Barbershop annual license | $65.00 |
Beauty salon annual license | 65.00 |
Billiards and pool parlor or school annual license | 75.00 first table |
30.00 for each additional table | |
Bowling alley annual license | 150.00 first alley |
30.00 each additional alley | |
Carnival license, annual | $125.00, plus $12.00 each employee |
Charitable game or scheme of chance license | 150.00 per event |
Christmas trees, resident and nonresident license | 275.00, plus $450.00 deposit for clean-up purposes |
Coin-operated dry cleaning and washing machines | 35.00 for each premises/multiple dwelling |
Dance permit | 20.00 |
Dance hall license | 75.00 annually |
Dance orchestra license | 100.00 annually (to be paid by the owner of the premises where the dance is held) |
(including D.J. and bands) | |
Day care facility (not located at school or church) | 40.00 |
Donation box annual permit (as set forth in Section 1707.09(d) of these Codified Ordinances, one box per location) (valid from date of issuance until September 30 of each year) | 100.00 |
Exterminating license, annual | 150.00 |
Food handler's license, annual | 30.00 |
Garage, basement, lawn, patio or yard sales, etc. (no more than three permits per calendar year) | 5.00 each |
Itinerant vendors license (valid 30 days) | 100.00 |
Junk dealer, pawnbroker, and secondhand dealer license, annual | 150.00 plus $15.00 for each employee |
Lawn services (pesticides or herbicides) annual certificate C.O. Chapter 759 | 60.00 |
Massage parlor license | 175.00 annually |
Masseur/masseuse permit | 100.00 annually |
Motion picture operator’s license, annual | 150.00 |
Music (juke box) license, annual | 50.00 |
30.00 | |
50.00 | |
Fee | |
Pet shop license (as set forth in Section 709.02 of these Codified Ordinances) | $60.00 |
Private policeman or policewoman license | 7.50 |
Public picnic permit | 30.00 |
Public picnic grounds permit | 75.00 |
Public shows license | 50.00 each show for first five units plus $25.00 per unit for all units over five, annually by owner-operator |
Snow plow operator registration | |
12-month period from September 1 of one year to August 31 of next year | 25.00 per vehicle (1 to 5 vehicles) |
15.00 per vehicle (6 or more vehicles) | |
Tattoo establishments | |
Application fee | 300.00 |
License fee | 300.00 per year |
Taxicab, application fee | 25.00 per vehicle up to 20 vehicles, annually |
Taxicab, fleet license, annual | 500.00 (over 20 vehicles) |
Taxicab, replacement license | 10.00 |
Taxicab, driver license, annual | 40.00 |
Taxicab, vehicle license, annual | 30.00 |
Temporary building/trailer (construction office, sales office, etc. - valid up to 90 days) | 175.00 each 90-day period |
Temporary cart license (RMU) (valid up to 90 days) | 40.00 each 90-day period |
Temporary store license (valid up to 90 days) | 35.00 each 90-day period |
Vending units (food, beverage, and merchandise) | 30.00 annual, each |
Weapon dealer license | 40.00 |
Weapons purchase permit | 10.00 |
(d) Planning and Zoning Code. | |
(1) Variance permit from the Board of Zoning Appeals | |
A. Residential (One- or two-family dwelling use): | 50.00 plus costs as outlined in C.O. Chapter 1127 |
B. Commercial (all other uses): | 150.00 plus costs as outlined in C.O. Chapter 1127 |
C. Special meeting | 600.00 |
D. Extension of variance as per C.O. Sec. 1127.12 | 50.00 each extension request |
(2) Planning Commission: | |
A. Subdivision of property: Submittal shall include 11 copies of plat. | |
1. Parcel split or consolidation (up to and including five lots) | $125.00 |
2. Parcel split or consolidation (over five lots) | 300.00 |
B. Site plan review: Submittal shall include 11 copies of site plan. | |
1. Residential: | |
Single-family | 60.00 per lot |
Two-family or cluster | 60.00 per unit |
Apartment-townhouse | 60.00 per unit |
Planned unit development | |
single-family or two-family | 60.00 per unit or lot |
multifamily | 75.00 per unit |
2. Commercial, industrial or public facility building (new or addition building size): | |
4,000 sq. ft. and less | 400.00 |
4,001 sq. ft. to 10,000 sq. ft. | 600.00 |
10,001 sq. ft. to 20,000 sq. ft. | 1,000.00 |
20,001 sq. ft. to 50,000 sq. ft. | 2,500.00 |
50,001 sq. ft. to 75,000 sq. ft. | 3,500.00 |
75,001 sq. ft. or more | 5,000.00 |
3. Review of revised plans for B.1. or B.2. | One-half of initial fee |
C. Rezoning: Rezoning shall be accompanied by a sketch plan of the proposal and a legal description with the sketch plan verifying the plan. | |
Per parcel equal to or less than one-half acre in area | $250.00 |
Per parcel greater than one-half acre in area | 600.00 |
D. Conditional use application fee: | |
1. Residential District | 150.00 |
2. Public Facilities Building | 200.00 |
3. Multifamily District | 250.00 |
4. Commercial District | 300.00 |
5. Industrial District | 400.00 |
E. Similar use determination | 200.00 |
F. Television, radio or wireless - new tower | 1,500.00 |
co-location with new platform | 500.00 |
co-location without new platform | 250.00 |
G. Residential antenna or tower | 150.00 |
H. Solar or wind energy conversion system | |
1. Residential (one- or two-family dwelling use) | 50.00 |
2. Commercial (all other uses) | 500.00 |
I. Parking lot expansion | 250.00 |
J. Sign application: | 60.00 |
K. Miscellaneous: | 100.00 |
(3) Special meeting. Any applicant requesting a special meeting of the Planning Commission shall pay a fee of six hundred dollars ($600.00) for the special meeting. | |
(4) Costs of additional work. Any extra costs or additional work performed by the Law Department or the City Engineer or any other department of the Municipality, including, but not limited to architectural, engineering services, in connection with the matter contained in the application, shall be added to the application fee and the applicant shall bear all additional expenses. | |
(5) House topo review: | 275.00 |
Revised house topo review (to be paid upon submittal) | 100.00 each revision |
(6) Signs. | |
A. Permanent: | 75.00 |
B. Temporary: | 35.00 |
C. Inflatable: | 150.00 |
(e) Building Code. | |
(1) Registration fees. | |
Contractor's annual registration certificates. | 125.00 for new registration or renewal after January 31 |
90.00 for renewal on or before January 31 | |
60.00 for period November 1 to December 31 | |
250.00 for work started without registration (any month) | |
50.00 Landscaping and lawn services contractor (C.O. Sec. 1507.17) | |
(2) Plan examination fees. | |
A. New dwelling unit including attached garage and basement (one-, two-, or three-family main use) | $200.00 base fee at submittal plus $.10 per sq. ft. |
B. New or replacement detached garage (accessory to one-, two-, or three-family use) | 15.00 base fee at submittal plus $.03 per sq. ft. |
C. New or replacement accessory building (sheds, tents, greenhouses, gazebos or similar structures) | 10.00 base fee at submittal plus $.03 per sq. ft. |
D. Residential additions and alterations (one-, two-, or three-family dwellings) | 35.00 base fee at submittal plus $.075 per sq. ft. |
E. New building (not one-, two-, or three-family structures) | |
1. General, architectural and structural | 300.00 base fee at submittal plus $.10 per sq. ft. |
2. Mechanical (HVACR) | 225.00 base fee at submittal plus $.05 per sq. ft. |
3. Plumbing | 225.00 base fee at submittal plus $.05 per sq. ft. |
4. Electrical | 225.00 base fee at submittal plus $.05 per sq. ft. |
5. Fire suppression | 225.00 base fee at submittal plus $.05 per sq. ft. |
6. Hood suppression | 100.00 at submittal (first hood) plus |
7. Fire alarm and detection | 200.00 base fee at submittal plus $.05 per sq. ft. |
8. Industrialized unit | 150.00 base fee at submittal plus $.02 per sq. ft. |
F. Additions and alterations (not one-, two-, or three-family structures) | |
1. General, architectural and structural | 200.00 base fee at submittal plus $.05 per sq. ft. |
2. Mechanical (HVACR) | 100.00 base fee at submittal plus $.05 per sq. ft. |
3. Plumbing | 100.00 base fee at submittal plus $.05 per sq. ft. |
4. Electrical | 100.00 base fee at submittal plus $.05 per sq. ft. |
5. Fire suppression | 100.00 base fee at submittal plus $.05 per sq. ft. |
6. Hood suppression | 75.00 at submittal (first hood) plus |
7. Fire alarm and detection | 100.00 base fee at submittal plus $.02 per sq. ft. |
8. Industrialized unit | 200.00 base fee at submittal plus $.05 per sq. ft. |
9. Demolition of building | 100.00 |
10. Tent | 50.00 at submittal |
G. Change of use and occupancy (without alterations) | 200.00 base fee at submittal plus $.05 per sq. ft. |
H. Zoning compliance | |
1. Change of owner or tenant | 75.00 at submittal |
2. Name change of business only | 25.00 at submittal |
I. Solar panel system | |
1. Residential (one or two-family dwelling use) | 40.00 |
2. Commercial (all other uses) | 600.00 |
Alterations | 500.00 |
J. Wind energy conversion system | |
1. Residential (one or two-family dwelling use) | 80.00 each turbine or windmill |
2. Commercial (all other uses) | 1,500.00 each turbine or windmill |
Alterations | 500.00 each turbine or windmill |
K. Television, radio or wireless - new tower | 1,500.00 |
Television, radio or wireless towers - alterations | 500.00 |
L. Re-submittal of drawings or specification; rejected, incomplete or revised construction documents | For each re-submittal, one-half of original plan examination fee, but not to exceed $5,000 per category (general, HVACR, electrical, etc.) |
M. Form of agreement for minor corrections to construction documents not requiring revised plan submittal | One-fourth of original plan examination fee, but not to exceed $25.00 |
N. Electrified fences | $150.00 |
(3) General building fees. | |
A. New dwelling unit building permit | 1,250.00 plus $.10 per sq. ft. of floor area |
B. New detached residential garage | 30.00 plus $.05 per sq. ft. of floor area |
C. New accessory to residential building (shed, greenhouse, gazebo, etc.) | 25.00 plus $.03 per sq. ft. of floor area |
D. Residential additions and alterations | 35.00 plus $.10 per sq. ft. of floor area |
1. Waterproofing | $35.00 plus $5.00 per $1,000 valuation or part thereof |
2. Window or glass block installation | 25.00 plus $5.00 per $1,000 valuation or part thereof |
E. Deck (one-, two- or three-family) | 40.00 plus $.05 per sq. ft. of floor area |
F. Roofing and siding (houses and garages) | 35.00 plus $5.00 per $1,000 valuation or part thereof |
G. Swimming pool, in-ground (does not include heavy load and yard grade) | 100.00 no base fee |
H. Swimming pool, above-ground pool | 40.00 no base fee |
I. New commercial, public facility or multi-family or industrial building | 1,500.00 plus $.15 per sq. ft. of floor area |
J. Addition or alteration to commercial, public facility, or industrial building | 300.00 plus $.20 per sq. ft. but not less than $5.00 per $1,000 valuation |
1. Roofing | 75.00 plus $5.00 per $1,000 valuation or part thereof (no $300.00 base fee) |
2. Siding or windows | 50.00 plus $6.00 per $1,000 valuation or part thereof (no $300.00 base fee) |
K. Demolition of buildings or structure | |
1 Commercial, multi-family, industrial, etc. | 500.00 |
2. One-, two- or three-family dwelling | 175.00 |
3. Garage for dwelling unit | 75.00 |
4. Accessory building | 15.00 |
5. Interior demolition only | 25.00 plus $5.00 per $1,000 of valuation or part thereof |
L. Dumpster enclosure | 100.00 |
M. Elevator permit | 40.00 per floor |
N. Fences, headwall and/or retaining wall | |
1. Residential | 40.00 plus $0.30 per linear foot |
2. Commercial | 225.00 plus $.30 per linear foot |
3. Electrified fences | 225.00 plus $.30 per linear foot 150.00 per annual license |
O. Grade | |
1. Garage, house or yard grade | 50.00 each |
2. Change of grade | 30.00 |
3. Final grade | 100.00 |
P. Handicap ramp or lift | 25.00 |
Q. Heavy load (construction) | 75.00 |
R. Landscaping | 25.00 |
S. Moving of building and/or structure | 750.00 on or across public thoroughfare |
250.00 moving from one lot to another without moving on a public way | |
T. Occupancy permits | |
1. Residential | 50.00 |
2. Residential temporary grade | 50.00 |
3. Residential temporary grade deposit | 250.00 |
4. Commercial | 200.00 |
5. Commercial temporary | 200.00 |
6. Commercial temporary grade deposit | 1,000.00 |
U. Parking lots, aprons, driveways or walks | |
1. New or replacement parking lot or drive | 200.00 plus $.005 per sq. ft. |
2. New or replacement pervious (BMP) portland cement concrete parking lot or drive | 150.00 plus $.001 per sq. ft. |
3. Resurfacing parking lot or drive | 75.00 plus $.005 per sq. ft. |
4. Resealing parking lot or drive | 75.00 plus $.002 per sq. ft. |
Re-striping of parking lot | 50.00 |
5. Apron (new or replacement; pervious (BMP) or regular) | 60.00 |
6. New commercial sidewalk or yardwalk | 60.00 plus $1.00 per linear foot |
7. Commercial sidewalk or yardwalk replacement | 60.00 plus $1.00 per linear foot |
V. Recreation fee for new residence | 250.00 |
W. Re-inspection fee for incomplete or defective work or for work not in compliance with approved plans | 75.00 each occurrence (not including SWP3 work) |
X. Sanitary sewer tap-in fee schedule | |
1. One-, two-, or three-family dwelling | 790.00 |
2. Multi-family residential (more than 4 units) | 790.00 |
3. Commercial, public facility or industrial building | 956.00 |
Y. Residential sidewalk, driveway, garage base, garage floor, shed base, apron, yardwalk or patio | 40.00 |
Sidewalk leveling | 15.00 |
Z. Special inspections | |
1. Overtime building inspection requested | 100.00 per hour or fraction thereof per inspector (minimum 2-hour charge per inspector) |
2. Engineering evaluation other than grading | 100.00 per hour or fraction thereof per engineer |
AA. Street maintenance | 250.00 |
BB. Tanks | Installation of outdoor, above-ground or buried tanks for storage of any substances including water: |
1. 150 to 275 gallon tank | 25.00 each |
2. 276 to 500 gallon tank | 35.00 each |
3. 501 to 3,000 gallon tank | 45.00 each |
4. 3,001 to 12,000 gallon tank | 70.00 each |
5. 12,001 to 20,000 gallon tank | 175.00 each |
6. 20,001 to 50,000 gallon tank | 225.00 each |
7. 50,001 to 100,000 gallon tank | 275.00 each |
8. Each tank over 100,000 gallons | $350.00 each |
9. Each tank removed | 100.00 each |
CC. Temporary building/trailer | 150.00 each |
DD. Towers and antennas | |
1. Television or radio broadcast tower, new | 5,000.00 each |
2. Television or radio broadcast tower, alteration | 1,000.00 each |
a. New tower | 3,500.00 each |
b. New or additional antenna | 500.00 each |
c. Co-location of antenna on existing tower or building | 1,500.00 each |
4. CB/ham tower and antenna, ground-mounted | |
a. New tower 50 feet or over in height | 300.00 |
b. New tower under 50 feet in height | 150.00 |
c. Addition or alteration | 75.00 |
5. CB/ham radio tower and antennas, roof-top | |
a. New | 50.00 |
b. Addition or alteration | 25.00 |
6. Satellite dish more than 3 ft. in diameter | 25.00 |
EE. Variance permit from the Board of Building Appeals | |
1. Residential | 50.00 |
2. Commercial, public facility, multi-family and industrial | 200.00 |
3. Special meeting | 600.00 |
FF. Re-issue a permit after a contractor abandons a job | 30.00 each permit |
GG. Solar panel system | |
1. Residential (one or two-family dwelling use) | 5.00 each panel |
2. Commercial (all other uses) | 10.00 each panel |
Alterations | 5.00 each panel |
1. Residential (one or two-family dwelling use) | 100.00 each turbine or windmill |
2. Commercial (all other uses) | 3,000.00 each turbine or windmill |
Alterations | 1,000.00 each turbine or windmill |
HH. Wind energy conversion system | |
1. Residential (one or two-family dwelling use) | 100.00 each turbine or windmill |
2. Commercial (all other uses) | 3,000.00 each turbine or windmill |
Alterations | 1,000.00 each turbine or windmill |
II. Television, radio or wireless- new tower | 3,000.00 |
Television, radio or wireless towers- alterations | 1,000.00 |
JJ. Extensions for permits (building, HVACR, plumbing, electrical, etc.) if substantial work has begun and inspections have occurred; maximum extension shall be for 12 months | Permits expire 12 months after the date of the issuance of the permit; permits may not be renewed if no inspections have occurred |
1. If request for extension is submitted at least 10 days prior to the expiration of the permit | One-fourth of the original fee, but not to exceed $1,500.00 per permit |
2. If request for extension is not submitted at least 10 days prior to the expiration of the permit, but is submitted within 30 days of the expiration date | One-half of the original fee, but not to exceed $2,000.00 per permit; may require re-review of plans |
KK. Refunds may not be issued for any permit for which work has commenced | If work has not commenced, a refund of the permit fee may be issued in the amount not to exceed three-fourths of the permit fee |
(4) Heating, ventilating, air conditioning and refrigeration fees. | |
A. New residence heating | 250.00 per dwelling unit |
B. All alterations in the heating system of an existing dwelling unit in which alterations are a part of a single improvement | 30.00 plus unit costs below |
1. Each direct fuel unit heater, wall heater, space heater or ceiling suspended heater | $30.00 |
2. Air conditioning condenser | 30.00 |
3. Each chimney liner | 25.00 |
4. Duct work | 0.05 per $10.00 valuation |
5. Radon remediation system | 40.00 |
6. Exhaust fan | 10.00 each |
C. New building's mechanical installation (not one-, two-, or three-family dwellings) | 250.00 plus $.05 per sq. ft. plus piping unit costs |
1. For hot water heat piping, chilled water piping, process piping or compressed air piping | 0.20 per linear foot |
D. Additions and alterations to mechanical (not one-, two-, or three-family dwellings) | 100.00 plus unit costs below |
1. For hot water heat piping, chilled water piping, process piping or compressed air piping | 0.20 per linear foot |
2. Each air conditioner condenser | 75.00 |
3. Each automatic hot water heater and power boiler stem | 100.00 |
4. Each roof-top unit | 125.00 |
5. Each air conditioning unit (central type) | 125.00 |
6. Each water cooling tower | 275.00 |
7. Each incinerator | 275.00 |
8. Each refrigeration unit | 60.00 |
9. Each exhaust hood, infrared oven, or pizza oven | 60.00 |
10. Each VAV box or diffuser | 30.00 |
11. Duct work | .075 per $10.00 valuation |
12. Exhaust fan | 20.00 each |
(5) Electrical fees. | |
A. New residence electric | 250.00 per dwelling unit |
1. Solar panel | 10.00 each panel |
2. Wind energy conversion system | 100.00 each turbine or windmill |
B. Residential alterations and additions | 30.00 plus unit costs below |
1. Service restoration for vacant house | 20.00 |
2. Each light fixture or receptacle outlet | 1.50 each |
3. Replacement panel, loadcenter, or service | 15.00 |
4. 220 volt outlet (range, dryer, spa, etc.) | 10.00 |
5. Hard-wired smoke detector | 1.50 each |
6. Generator | 60.00 |
7. Low voltage system | 10.00 |
8. Solar panel | 10.00 each panel |
9. Wind energy conversion system | 100.00 each turbine or windmill |
C. New building's electrical installation (not one-, two-, or three-family dwellings) | 200.00 plus $.05 per sq. ft. |
1. Generator | 150.00 |
2. Temporary lighting, power installation | 75.00 |
3. Low voltage installation (tel/data, security, fire, POS) | 100.00 |
4. Transformer | 60.00 |
5. Parking lot pole light | 125.00 each |
6. Solar panel | 20.00 each panel |
7. Wind energy conversion system | 300.00 each turbine or windmill |
D. Additions and alterations to electrical (not one-, two-, or three-family dwellings) | 150.00 plus unit costs below |
1. Service restoration for vacant building | 40.00 |
2. Light fixtures or receptacle outlet | 1.50 each |
3. Panel, switchboard, motor control center | 25.00 each unit |
4. Electric signs, marquees, etc. | 40.00 flat fee plus $1.25 per sq. ft. |
5. Bus duct | 0.60 per linear foot |
6. High capacity outlets | |
a. Motion picture projector | 125.00 each |
b. Other light outlet | 15.00 |
7. Heating outlet | 8.00 per unit |
8. Air compressor power circuit | 30.00 |
9. Motor | 15.00 per motor |
10. Generator | 200.00 |
11. Duct or pipe only | 0.15 per linear foot |
12. Portable X-ray machine | 30.00 each |
13. Fixed X-ray machine | 50.00 each |
14. Temporary lighting, power installation | 60.00 including carnival lighting (no base fee for carnivals) |
15. Low voltage installation (tel/data, security, fire, POS) | 100.00 |
16. Transformer | 60.00 |
17. Parking lot pole light | 25.00 each up to 5 poles. $10.00 each thereafter |
18. Solar panel | 20.00 each panel |
19. Wind energy conversion system | 300.00 each turbine or windmill |
(6) Plumbing fees. | |
A. New residence plumbing | 250.00 per dwelling unit |
1. Automatic fire suppression system | 4.00 per head |
2. Backwater valve | 10.00 |
B. Residential alterations and additions | 30.00 plus unit costs below |
1. Service restoration for vacant house | 20.00 |
2. Dishwasher | 7.00 |
3. Garbage disposal | 7.00 |
4. Water closet or bidet (installed or changed) | 7.00 |
5. Bathtub, hot tub or jacuzzi (installed or changed) | 7.00 |
6. Washstand (installed or changed) | 7.00 |
7. Section of wash tray | 7.00 |
8. Sink (installed or changed) | 7.00 |
9. Section of shower bath closet (installed or changed) | 7.00 |
10. Section sink (installed or changed) | 7.00 |
11. Residential water heater (installed or changed) | 1.00 |
12. Exterior water or gas piping | 0.20 per linear foot |
13. Lawn irrigation system | 35.00 |
14. Storm water storage containers | 1.00 |
The base fee of $30.00 found at Section 185.04(e)(6)B. shall not be collected until January 1, 2014 | |
15. Removal of storm water storage containers | 50.00 per system |
16. Sewer piping | 35.00 plus $.20 per linear foot |
17. Driveway or yard drain | 8.00 |
18. Automatic fire suppression system | 4.00 per head |
19. Backwater valve | 10.00 |
C. New building's plumbing or sewers installation (not one-, two-, or three- family dwellings) | 250.00 plus $.05 per sq. ft. (not including a warehouse room in square footage) |
1. Water and gas service line (up to 2 inches) | 0.20 per linear foot |
a. Greater than 2 inches in diameter | 0.30 per linear foot |
2. Automatic fire suppression system | |
a. Water system | 4.00 per head |
b. Non-water system | 75.00 |
3. Hydrant | 30.00 |
4. Hose bibb | 10.00 |
5. Grease traps, separators, interceptors | 30.00 |
6. Standpipe (plus fire line), underground fire line for hydrants and standpipe systems | 2.00 per linear foot |
7. Lawn sprinkler system | 60.00 |
8. Catch basin, inlet basin or manhole | 10.00 |
9. Sewers, drain pipes or detention piping | 0.50 per linear foot |
10. Backwater valve | 50.00 |
D. Additions and alterations to plumbing or sewers (not one-, two-, or three- family dwellings) | 150.00 plus unit costs below |
1. Service restoration for vacant building | 30.00 |
2. Dishwasher | 8.00 |
3. Garbage disposal | 8.00 |
4. Water closet or bidet (installed or changed) | 8.00 |
5. Bathtub, hot tub or jacuzzi (installed or changed) | 8.00 |
6. Washstand (installed or changed) | 8.00 |
7. Section of wash tray | 8.00 |
8. Sink (installed or changed) | 8.00 |
9. Section of shower bath closet (installed or changed) | 8.00 |
10. Section sink (installed or changed) | 8.00 |
11. Hot water heater (installed or changed) | 8.00 |
12. Pedestal urinal or slop sink | 8.00 |
13. Section of latrine closet | 8.00 |
14. Dental chair | 10.00 |
15. Floor drain | 8.00 |
16. Catch basin, inlet basin or manhole | 10.00 |
17. Inside downspout (installed or changed) | 10.00 |
18. Dishwashing machine (installed or changed) | 10.00 |
19. Drinking fountain | 8.00 |
20. Water and gas service line (up to 2 inches) | 0.20 per linear foot |
21. Radiant heat or geothermal piping | 0.02 per linear foot |
22. Automatic fire suppression system (including relocating of heads) | |
a. Water system | 4.00 per head |
b. Non-water system | 50.00 |
23. Hydrant | 20.00 |
24. Hose bibb | 10.00 |
25. Grease traps, separators, interceptors | 20.00 |
26. Standpipe (plus fire line), underground fire line for hydrants and standpipe systems | 2.00 per linear foot |
27. Lawn sprinkler system | 50.00 |
28. Sewers, drain pipes or detention piping | 0.50 per linear foot |
29. Backwater valve | 75.00 |
(7) Storm Water Management Fees | |
A. Cuyahoga Soil and Water Conservation District services for site plan reviews and inspections | |
1. Initial review | 400.00 each |
2. Review of revised plans | 250.00 each revision |
3. Field inspection | 125.00 each inspection |
B. City Engineering Department review of storm water management plan for NPDES and SWP3 compliance | |
1. Initial review | |
a. Residential (one-, two- or three-family dwelling) | 150.00 |
b. Subdivision or cluster development | 300.00 |
c. Commercial (not one-, two- or three-family or subdivision/cluster) | 300.00 |
2. Review of revised plans | |
a. Residential (one-, two- or three-family) | 75.00 each revision |
b. Subdivision or cluster development | 150.00 each revision |
c. Commercial (not one-, two- or three-family or subdivision/cluster) | 150.00 each revision |
3. SWP3 Permit | |
a. Residential (one-, two- or three-family) | 150.00 per acre or fraction thereof earth-disturbed area |
b. Subdivision or cluster development | 600.00 per acre or fraction thereof earth-disturbed area |
c. Commercial (not one-, two- or three-family or subdivision/cluster) | 600.00 per acre or fraction thereof earth-disturbed area |
C. City Engineering Department inspection of storm water management system for NPDES and SWP3 compliance for site disturbances of one acre or greater | |
1. Compliance inspection | 125.00 each per month |
2. First noncompliance inspection | 300.00 each following a Notice of Deficiency |
3. Second or subsequent noncompliance inspection | 500.00 each following a Notice of Violation |
D. City Engineering Department inspection of storm water management system for NPDES and SWP3 compliance for disturbances of less than one acre and not part of a common plan | |
1. Compliance inspection | 50.00 each per month |
2. First noncompliance inspection | 150.00 each following a Notice of Deficiency |
3. Second or subsequent noncompliance inspection | 250.00 each following a Notice of Violation |
E. Alternative Best Management Practice device for storm water management | 125.00 each |
F. Riparian or wetland intrusion or alteration | 200.00 per acre or fraction thereof disturbed area |
(8) Miscellaneous fees. | |
A. Large map/plan copies (each) | |
1. 11 inches x 17 inches | 0.25 |
2. 24 inches x 36 inches | 7.50 |
3. Larger than 24 inches x 36 inches | 10.00 |
(f) Property Maintenance Code. | |
(1) Annual rental registration fee (one- or two-family houses) and short-term rentals | |
A. 150.00 if paid by the due date of January 31 of each year | |
Said registration shall be valid for one calendar year (from January 1 through December 31) | |
B. Late fee for above annual rental and short-term rental registration 50.00 late fee for failure to register and pay by January 31 (additional fines and court costs may be imposed by Parma Municipal Court for failure to complete the rental registration form and pay the rental registration fee) | |
(2) An application for an annual certificate of multiple dwelling registration shall be accompanied by a nonreturnable fee for any one mixed use or apartment building. The fee for buildings containing one to four dwelling units is $100.00. Fees for buildings with five or more dwelling units is $20.00 per dwelling unit and shall not exceed the sum of $1,000 per year. | |
(3) Foreclosure registration and inspection fee | |
A. Residential property (one- or two-family structures or short-term rentals) | 100.00 |
B. Commercial property (all structures other than one- or two-family structures) | 300.00 |
(4) Processing fee for issuance of summons to court | 50.00 |
(g) Housing Code. | |
Foreclosure notice residential property fee (one- or two-family structure) | 100.00 |
Foreclosure notice commercial property fee (all structures other than one- or two-family structures) | 300.00 |
(Ord. 279-94. Passed 11-9-94; Ord. 102-95. Passed 6-5-95; Ord. 122-95. Passed 5-3-95; Ord. 142-95. Passed 6-5-95; Ord. 185-95. Passed 7-5-95; Ord. 373-95. Passed 2-20-96; Ord. 177-97. Passed 1-20-98; Ord. 181-97. Passed 9-15-97; Ord. 86-98. Passed 4-20-98; Ord. 92-98. Passed 4-20-98; Ord. 139-98. Passed 5-18-98; Ord. 279-98. Passed 10-5-98; Ord. 236-00. Passed 9-5-00; Ord. 61-01. Passed 3-19-01; Ord. 89-01. Passed 3-19-01; Ord. 311-01. Passed 12-3-01; Ord. 410-02. Passed 10-21-02; Ord. 111-03. Passed 5-5-03; Ord. 212-03. Passed 12-15-03; Ord. 226-04. Passed 12-27-05; Ord. 403-04. Passed 1-3-05; Ord. 43-05. Passed 4-4-05; Ord. 242-05. Passed 1-17-06; Ord. 9-06. Passed 1-17-06; Ord. 122-07. Passed 5-7-07; Ord. 26-07. Passed 7-2-07; Ord. 81-08. Passed 4-21-08; Ord. 139-08. Passed 6-2-08; Ord. 196-08. Passed 6-16-08; Ord. 345-08. Passed 1-5-09; Ord. 349-08. Passed 1-5-09; Ord. 152-09. Passed 8-3-09; Ord. 91-10. Passed 4-19-10; Ord. 109-10. Passed 5-3-10; Ord. 114-10. Passed 6-7-10; Ord. 32-11. Passed 3-21-11; Ord. 85-11. Passed 5-2-11; Ord. 76-12. Passed 4-16-12; Ord. 285-09. Passed 5-7-12; Ord. 105-12. Passed 5-21-12; Ord. 108-12. Passed 5-21-12; Ord. 22-13. Passed 2-4-13; Ord. 74-13. Passed 5-6-13; Ord. 58-14. Passed 5-5-14; Ord. 79-16. Passed 6-6-16; Ord. 110-16. Passed 7-11-16; Ord. 249-16. Passed 12-19-16; Ord. 49-17. Passed 5-1-17; Ord. 97-19. Passed 6-3-19; Ord. 178-19. Passed 9-16-19; Ord. 163-22. Passed 10-17-22; Ord. 215-22. Passed 1-17-23; Ord. 157-22. Passed 9-18-23; Ord. 148-24. Passed 10-7-24.)