Section A5.106.5.3 - A5.106.5.3.4 of the California Green Building Standards Code are deleted in its entirety, adopted as mandatory measures and is amended to read:
A5.106.5.3 Electric vehicle (EV) charging for nonresidential structures. New non- residential structures shall comply with the following requirements for electric vehicle supply equipment (EVSE). All parking space calculations under this section shall be rounded up to the next full space. The requirements stated in this section are in addition to those contained in Section 5.106.5.3 of the California Green Building Standards Code. In the event of a conflict between this section and Section 5.106.5.3, the more robust EV Charging requirements shall prevail.
A5.106.5.3.5 Nonresidential structures other than hotels. The following standards apply to newly constructed nonresidential structures other than hotels.
In general. For building with 10 to 20 parking spaces, the property owner shall provide at least 20% EV Capable or EVSE-Ready space, and at least 20% Level 2 EVSE installed of the total parking spaces.
For building with over 20 parking spaces, the property owner shall provide at least 15% EV Capable or EVSE-Ready space, and at least 15% EVSE installed for of the total parking spaces.
Accessible spaces. Projects shall comply with the 2022 California Building Code requirements for accessible electric vehicle parking.
Minimum total circuit capacity. The property owner shall ensure sufficient circuit capacity, as determined by the Chief Building Official or designee, to support a Level 2 EVSE in every location where EVSE Capable space, EVSE-Ready space or EVSE Installed is required.
Location. The EVSE, receptacles, and/or raceway required by this section shall be placed in locations allowing convenient installation of and access to EVSE. Location of EVSE or receptacles shall be consistent with all city regulations.
(Ord. 5626 § 2 (part), 2024)
Division A5.4 - ENERGY EFFICIENCY