9-7-7: INSPECTION OF PRACTICES:
The stormwater management practices shall be subject to the inspection procedures outlined in section 9-6-6 of this title and as specified herein. All applicants are required to submit actual as built plans for any stormwater management practices located on site after final construction is completed. The grading, drainage, and erosion control plan must have survey elevations shown to adequately show that the final grading of all ponds, basins, ditches, swales, and berms are built per the stormwater management design. (Prior Code § 4-5-7)