8-6-10: INSTALLATION REQUIREMENTS:
The excavation, backfilling, patching, and restoration, and all other work performed in the right-of-way shall be done in conformance with Engineering Standards adopted by the PUC or other applicable local requirements, insofar as they are not inconsistent with the PUC Rules. (Prior Code § 6-6-17)