1191.04 PERMIT REQUIRED.
   (a)    A Conditional Use Permit, as per Chapter 1181, and a Certificate of Zoning Compliance as per Chapter 1183 are required for a wireless telecommunications facility. A site plan shall be submitted as part of the zoning permit, and shall include all information as part of each permit and the following information:
      (1)    Existing topography with a maximum of five foot contour intervals;
      (2)    Proposed finished grade of the development shown by a maximum of five- foot contour intervals;
      (3)    The location of all existing buildings and structures and the proposed location of the facility and support structures including square footage, dimensions, heights and gloss floor of buildings or structures;
      (4)    The location and dimensions of all curb cuts, driving lanes, off-street parking and loading areas including number of spaces, grades, surfacing materials, drainage plans and illumination of the facility;
      (5)    The location and dimensions of proposed sidewalks, fences, landscaping, screening and/or walls;
      (6)    The location of all existing and proposed public streets and utilities;
      (7)    Schedule of any phasing of the project including completion date;
      (8)    A statement concerning any visual or environmental mitigation proposed by the applicant;
      (9)    Distances from proposed facility to existing buildings or structures and distance from residential zoning districts;
      (10)    A diagram showing all other wireless telecommunication facilities that exist or are proposed by the applying wireless communication provider and their coverage area within two miles of a proposed wireless telecommunication facility. Additionally, applicant shall provide a diagram showing the locations of all other wireless telecommunication facilities within two miles of the proposed wireless communications facility;
      (11)    A diagram showing the grid system of coverage for proposed wireless telecommunication facility;
      (12)    Any other information as may be required by the Planning and Zoning Commission and/or Zoning Inspector to determine the conformance with the Village's Codified Ordinances and/or to ensure the protection of the public health, safety and welfare of the Village. Said requested information shall be provided to the applicant in a timely fashion.
   (b)    A non-refundable fee of one hundred fifty dollars ($150.00) for the Conditional Use Permit and a non-refundable fee twenty-five dollar ($25.00) for Zoning Certificate shall be paid to the Village for each application for a wireless telecommunication facility.