§ 10.07.05 INSTALL AND MAINTAIN EFFECTIVE SEDIMENTATION AND EROSION CONTROL MEASURES.
   (A)   All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective sedimentation and erosion control measures.
   (B)   Disturbed areas shall be vegetated and stabilized (planted and mulched) within 14 days of construction completion.
   (C)   It shall be the responsibility of the property owner to ensure the installation and maintenance of effective sedimentation and erosion control measures and to stabilize disturbed areas within 14 days of construction completion.
   (D)   Failure to install and maintain effective sedimentation and erosion control measures during construction or stabilize disturbed areas after construction are in violation of this ordinance shall be subject to a fine in accordance with the Planning and Zoning Fee Schedule for Code Enforcement Civil Citations, as adopted by the Board of Aldermen.
(Ord. passed 10-4-2023)