§ 150.032 BUILDING PERMIT.
   No structure shall be erected or structurally altered until a building permit shall have been issued indicating that the existing or proposed structure and the use of the land comply with the Zoning Code and State Building Code. No building permits shall be issued until a complete drainage system has been reviewed by the city. If deemed appropriate, the City Building Official may require approval of the drainage system by the City Engineer. All applications for building permits pertaining to the erection or major alteration which will affect the outside dimensions of a structure shall be accompanied by two (2) copies of a plat drawn to scale showing the actual dimensions of the lot, lots or parcels to be built upon, the dimensions of the ground and the extensions beyond the outside wall of the proposed structures to be erected or structurally altered, their location on the site in relation to the outside boundary and such other information as may be necessary to provide for the enforcement of these regulations. One (1) copy of the approved building permit is to be made available on the site until the issuance of an occupancy permit. On building projects, when the Building Official and/or the Street Superintendent determine that dirt and debris will enter the city storm sewer system, an erosion control plan shall be prepared and followed.
(Ord. 395, passed 7-6-2010) Penalty, see § 150.999