CHAPTER 52: WATER AND SEWERS
Section
Design and Construction of Wastewater Collection Systems
   52.01   Applicability
   52.02   Authorization to connect
   52.03   Unauthorized discharges
   52.04   Public system required
   52.05   References to other regulations
   52.06   Reimbursement agreements
   52.07   Separability
   52.08   Appeals
   52.09   Definitions
   52.10   Design requirements
   52.11   Plans and approvals
   52.12   Construction and inspection
   52.13   Acceptance of completed system
Connection to and Use of Sewers and Drains
   52.25   Definitions
   52.26   Deposits and discharges
   52.27   Connections required
   52.28   Installation and connection; fees, rates and charges; late payments
   52.29   Prohibited discharges
   52.30   Fats, oil, grease and sand
   52.31   Pretreatment of wastes
   52.32   State and federal requirements
   52.33   Damaging facilities
   52.34   Inspections; enforcement
 
   52.99   Penalty
Cross-reference:
   General utility provisions, see Ch. 50
   Utility and Public Works Construction in Rights-of-Way and Easements, see §§ 93.35 through 93.48