11-15-4: BACKFILL REQUIREMENTS:
The contractor shall be required to provide adequate acceptable backfill at the site and restore the site to a natural condition. Any and all debris, excess backfill, or discarded material shall be removed from the site by the contractor at its sole expense. (Ord. 1775, 12-14-2016)