8-1-3: APPLICATION AND FEES FOR WATER CONNECTION:
   A.   Connection Required; Exceptions: Every owner of a structure within the corporate limits of the Village wherein water services are required by this Code, and where there is available Village water service to the premises, shall be connected to the Village water service, within six (6) months of the date that the water mains are available for connection to the premises, except in the following specific cases:
      1.   Where on July 11, 1984, there was no Village water service connected to the premises, and there was an existing operating private well, the owner of such a well may use same to provide water services to the premises as long as said well remains operable. In the event that such existing well becomes inoperable, or where there is a need to drill a new private well or extend the existing well, or in the event that the ownership of the premises is transferred, then in any of the said events, the premises shall be connected to the village water service within the time period above provided.
      2.   Where there is a new construction of a structure within the village where no village water service is then available, the owner of the premises shall notify the village in writing of the owner's intention to use water services for the premises, and the village shall have the option for thirty (30) days, from the date of notice, to either agree to provide water service to the premises, or waive its right to provide said service. If the village determines not to provide water service to the premises, the owner of the premises shall have the right to install a well or to obtain water service from a source other than the village to service the premises. Nevertheless, it shall be required that the owner provide the village with written notice as described above, before the installation of a well or to obtain other than village water service. (Ord. 915, 8-14-1996)
   B.   Application And Fees For Connection: All applications for connection to village water service shall be filed with the village clerk, on forms provided by the village, and shall as soon as reasonably possible thereafter be referred to the director of water and sewer for his approval. A tap-in fee for connection in the following amounts shall accompany each application:
      1.   Newly Available Service: Where water service is newly made available to a resident user's premises by the village, the tap- in fee shall be the sum of two thousand three hundred dollars ($2,300.00), provided an application is made and water connected to the subject premises within one hundred twenty (120) days of the water system becoming operational. If application is made within the one hundred twenty (120) day period and the premises are not connected to the water service within said period, or if no application is made during said period, the fee shall thereafter be two thousand five hundred dollars ($2,500.00).
      2.   Resident Users: The tap-in fee for resident users shall be two thousand five hundred dollars ($2,500.00).
      3.   Nonresident Users: The tap-in fee for nonresident users shall be the sum of three thousand dollars ($3,000.00).
      4.   Developments:
         a.   The tap-in fee for residential developments shall be as follows:
 
Line Size
Amount
 
 
   1 inch
$2,500.00
   11/2 inch
3,100.00
   2 inch
4,000.00
 
         b.   The tap-in fee for commercial developments shall be as follows:
Line Size
 
Amount
Line Size
 
Amount
 
 
 
   1 inch
 
$3,000.00
   11/2 inch
 
3,600.00
   2 inch
 
4,500.00
   3 inch
 
5,000.00
   4 inch
 
6,000.00
   6 inch
 
7,000.00
 
         c.   The tap-in fee for industrial developments shall be as follows:
Line Size
Amount
Line Size
Amount
 
 
 
   1 inch
 
$3,500.00
   11/2 inch
 
4,100.00
   2 inch
 
5,000.00
   3 inch
 
5,500.00
   4 inch
 
6,500.00
   6 inch
 
7,500.00
 
   C.   Approval Or Disapproval Of Application: The director of water and sewer shall have the right to approve or disapprove any application based on the particular circumstances and costs involved and shall report his decision to the water committee who shall make the final determination as to whether the connection shall be allowed. In the event the water committee disapproves an application for connection, the fees paid therefor shall be refunded to the applicant.
   D.   Fees Deposited In Certain Accounts: The fees collected under the provisions of this section shall be deposited into two (2) separate accounts. The accounts shall be known as "capital expansion" account, and as "inspection" account. The portion to be deposited into each account shall be as herein specified:
New resident as described in subsection B1 of this section:
 
Line Size
Capital Expansion
Inspection
Total
 
 
 
 
1 inch
$2,300.00 or $2,500.00
$200.00
$2,500.00 or $2,700.00
11/2 inch
2,900.00
200.00
3,100.00
2 inch
3,800.00
200.00
4,000.00
 
Resident as described in subsection B2 of this section:
 
Line Size
Capital Expansion
Inspection
Total
 
 
 
 
1 inch
$2,500.00
$200.00
$2,700.00
11/2 inch
3,100.00
200.00
3,300.00
2 inch
4,000.00
200.00
4,000.00
 
Nonresident as described in subsection B3 of this section:
 
Line Size
Capital Expansion
Inspection
Total
 
 
 
 
1 inch
$3,000.00
$500.00
$3,500.00
11/2 inch
3,600.00
500.00
4,100.00
2 inch
4,500.00
500.00
5,000.00
 
Commercial development, the amount for each account shall be as follows:
Line Size
Capital Expansion
Inspection
Total
Line Size
Capital Expansion
Inspection
Total
 
 
 
 
1 inch
$3,000.00
$500.00
$3,500.00
11/2 inch
3,600.00
500.00
4,100.00
2 inch
4,500.00
500.00
5,000.00
3 inch
5,000.00
500.00
5,500.00
4 inch
6,000.00
500.00
6,500.00
6 inch
7,000.00
500.00
7,500.00
 
Industrial development, the amount for each account shall be as follows:
Line Size
Capital Expansion
Inspection
Total
Line Size
Capital Expansion
Inspection
Total
 
 
 
 
1 inch
$3,500.00
$500.00
$4,000.00
11/2 inch
4,100.00
500.00
4,600.00
2 inch
5,000.00
500.00
5,500.00
3 inch
5,500.00
500.00
6,000.00
4 inch
6,500.00
500.00
7,000.00
6 inch
7,500.00
500.00
8,000.00
 
(Ord. 1249, 9-10-2003)