The finished grading around any newly constructed building shall be at least eighteen inches above the street or curb elevation and shall:
(a) Divert water away from the building by a minimum six-inch slope per ten-foot length;
(b) Prevent standing water and soil saturation detrimental to structures and lot use; and
(c) Provide for disposal of water from the lot to the gutter of the street.
(Ord. 1355. Passed 2-16-65.)