1352.10 ALTERNATIVE ACTIONS.
   (a)   When the City determines that site constraints compromise the intent of this chapter, off-site alternatives may be used that result in an improvement of water quality and a reduction of stormwater quantity. Such alternatives shall meet the standards in the Construction General Permit and shall achieve the same level of stormwater quantity control that would be achieved by the on-site controls required under this chapter. The City Engineer may require proof of Ohio EPA review and approval for any alternative action proposed.
(Ord. 23-O-001. Passed 1-3-23.)