§ 190.050 UTILITY AND DRAINING EASEMENTS.
   (A)   Except where alleys are permitted for the purpose, the Planning Commission shall require easements at least 12 feet in width centered along all rear lot lines for poles, wires, conduits, storm sewers, sanitary sewers, gas mains, water mains and other utility facilities. Where necessary or advisable in the opinion of the Planning Commission, similar easements shall be provided alongside lot lines or across lots.
   (B)   If the Planning Commission deems it necessary for proper drainage within or through a subdivision, it shall require that a storm water easement or drainage right-of-way be provided and maintained by the developer or abutting property owners.
   (C)   The Planning Commission shall require easements at least 15 feet in width parallel and adjacent to all road right-of-way for poles, wire conduits, storm sewers, gas mains, sanitary sewers, water mains and other utility facilities.
   (D)   Where necessary or advisable in the opinion of the Planning Commission, a similar easement shall be provided along parent tracts along with any necessary right-of-way dedications.
(Ord. passed 11-27-2017)