Ord. No. | Date Passed | Description |
Ord. No. | Date Passed | Description |
Res. D-32 | 6-23-1952 | Plat of First Addition to Mason Meadows Subdivision. |
Res. D-59 | 9-27-1954 | Authorizes acceptance of rights-of-way and easements for sewers in Second Addition to Mason Meadows Subdivision. |
Res. E-46 | 10-27-1958 | Plat of Fourth Addition to Manhasset Village Subdivision. |
Res. E-47 | 10-27-1958 | Plat of Sixth Addition to Mason Heights Subdivision. |
E-90 | 12-28-1959 | Plat of Block A - Olympia Fields Subdivision and dedication of streets and alleys shown thereon. |
E-91 | 12-28-1959 | Plat of Block B - Olympia Fields Subdivision and dedication of streets and alleys shown thereon. |
Res. F-15 | 10-24-1960 | Plats of Blocks C and D of Olympia Fields Subdivision. |
F-48 | 3-5-1962 | Plat of Block E - Olympia Fields Subdivision and dedication of streets and alleys shown thereon. |
G-30 | 3-25-1963 | Plat of Western Row Subdivision. |
7-1968 | 2-26-1968 | Approves plan of subdivision of the Minnie Marie Libecap parcel of 0.692 acres. |
8-1968 | 3-11-1968 | Approves plan of subdivision of the E. and E. Miller parcel of 20 acres. |
14-1968 | 5-13-1968 | Approves plan of subdivision of the Fred Emily tract on east side of U.S. Route 42. |
37-1969 | 5-12-1969 | Approves record plat of Oak Hill Subdivision, Section One, by Landtec Construction Co. |
12-1971 | 3-22-1971 | Accepts dedication of Castle Drive. |
13A-1971 | 3-8-1971 | Approves plan of Broadview Farms Subdivision, Sections 1 and 2 on Chateaugay Drive and Cox - Smith Road, and grants a variance thereon. |
3-1972 | 2-28-1972 | Approves plan of Olympia Fields Subdivision, Blocks F and G, Parts 1 and 2. |
7-1972 | 2-28-1972 | Approves plan of Winding Creek Estates Subdivision. |
11-1972 | 3-13-1972 | Approves plat of dedication of Parkside Drive for record purposes only. |
37-1972 | 9-25-1972 | Approves plan of Broadview Farms Subdivision, Section 3 and grants variance in lot size on Hanover Drive, Parkside Drive, Derby Court and Cox-Smith Road. |
58-1972 | 12-11-1972 | Approves plan of Pine Hill Estates Subdivision, Section 1 and grants variance in lot size on Lakeview Drive, Ontario Court and Champlain Court. |
6A-1973 | 1-22-1973 | Approves plan of subdivision of Mason Hills, Section One. |
24-1973 | 2-26-1973 | Approves plat of subdivision of Winding Creek Estates, Section Two. |
58-1973 | 6-25-1973 | Approves plat of subdivision of First Section of Burr Hill Estates. |
60-1973 | 7-16-1973 | Approves plat of subdivision of Fifth Edition of Manhasset Village Subdivision, Section One. |
72-1973 | 8-13-1973 | Approves plat of Bay Meadows Subdivision, Section One. |
74-1973 | 9-10-1973 | Approves plat of Bay Meadows Subdivision, Section One; amends Ord. 72-1973. |
85-1973 | 11-12-1973 | Approves plat of subdivision of Olympia Fields, Block G, Part 3 and Block H. |
22A-1974 | 5-29-1974 | Approves plan of subdivision of Bay Meadows, Section Two. |
56-1974 | 11-25-1974 | Approves plat of Bay Meadows Subdivision, Section Three. |
20-1975 | 6-23-1975 | Accepts dedication of right-of-way as shown on plat of Broadview Farms Subdivision, Section 4. |
44-1975 | 6-30-1975 | Approves plat of Broadview Farms Subdivision, Section 4. |
47-1975 | 7-14-1975 | Accepts dedication of certain lands shown on plat of Broadview Farms Subdivision as designed by Paul E. Hasselbring. |
71-1975 | 1-26-1976 | Accepts dedication of streets and public improvements as shown on plats of Mason Heights Subdivision, Seventh Edition. |
72-1975 | 1-26-1976 | Accepts dedication of streets and public improvements as shown on plats of Oak Hill Subdivision, Section 2. |
73-1975 | 1-26-1976 | Accepts dedication of streets and public improvements as shown on plats of Oak Hill Subdivision, Section 3. |
74-1975 | 9-8-1976 | Accepts dedication of Fairway Drive and perpetual easement as shown on plat of Fairway Drive. |
75-1975 | 9-8-1975 | Accepts dedication of streets and public improvements as shown on plat of Block A, The Greenery. |
86-1975 | 10-13-1975 | Approves plat of Burr Hill Estates, Section 2. |
8-1976 | 1-26-1976 | Accepts dedication of public improvements as shown on plats of Block B, The Greenery. |
14-1976 | 2-9-1976 | Accepts dedication of public improvements as shown on plats of Block C, The Greenery. |
74-1976 | 8-9-1976 | Plat of Van Leunen’s Inc. on U.S. Route 42 north of Western Row Road. |
82-1976 | 9-13-1976 | Plats of Block D Revised, The Greenery. |
95-1976 | 11-22-1976 | Final plat for dedication of The Greenery Phase II. |
39-1977 | 5-23-1977 | Plat of Baymeadows Subdivision, Section IV. |
58-1977 | 8-8-1977 | Plat of King-Mason Plaza, Section 1. |
70-1977 | 9-26-1977 | Final plat of Block F of The Greenery. |
76-1977 | 10-24-1977 | Final plat of Block G of The Greenery. |
82-1977 | 10-24-1977 | Plat of Osberger dedication. |
83-1977 | 11-28-1977 | Plat of Burr Hills Estates Section III. |
2-1978 | 1-9-1978 | Plat of Winding Creek Estates Section III. |
15-1978 | 3-27-1978 | With Mason Amateur Athletic Assn. for refreshment stand in Heritage Oak Park. |
54-1978 | 5-8-1978 | Plat of Quailwood Farms Subdivision Block A. |
55-1978 | 5-8-1978 | Final plat of Lot H of The Greenery. |
56-1978 | 5-8-1978 | Dedication of 0.287 acres adjacent to Reading Road by Wehrmeyer. |
60-1978 | 6-12-1978 | Plat of Mason Industrial Park. |
64-1978 | 6-12-1978 | Dedication of road right-of-way at Bethany Road and U.S. Route 42 by Tri-State Improvement Co. |
73-1978 | 7-10-1978 | Dedication of road right-of-way on plat of Gameela David dedication. |
79-1978 | 7-24-1978 | Dedication of 0.991 acres for part of Castle Drive. |
80-1978 | 7-24-1978 | Plat of Block J of The Greenery. |
97-1978 | 8-14-1978 | Dedication of road right-of-way on plat of Hilda Mein King property. |
130-1978 | 10-23-1978 | Plat of Putters Point Phase I. |
131-1978 | 10-23-1978 | Plat of Fairway Drive. |
139-1978 | 11-27-1978 | Dedication of right-of-way on plat of the Profit Sharing Trust for the employees of George Henkel Associates, Inc. |
154-1978 | 11-13-1978 | Plat of Quailwood Farms Subdivision Block B. |
6-1980 | 1-28-1980 | Plat of Provident Bank dedicating 0.046 acres adjacent to U.S. Route 42 for roadway purposes. |
12-1980 | 2-11-1980 | Plat of Western Estates Section 1. |
13-1980 | 2-11-1980 | Castle Drive Second Addition for public purposes. |
49-1980 | 5-12-1980 | Plat of Finsbury Pointe Subdivision Section 1. |
55-1980 | 7-14-1980 | Plat of Winding Creek Subdivision Section 4. |
60-1980 | 6-14-1980 | Plat of subdivision of Olympia Fields Block I. |
71-1980 | 9-22-1980 | Plat of subdivision of Olympia Fields Block I Section 2. |
101-1980 | 12-80-1980 | Plat of Taylor Creek Subdivision Section 1. |
102-1980 | 12-8-1980 | Plat of Western Estates Subdivision Section 2. |
31-1981 | 4-13-1981 | Approval of replatting of Winding Creek Estates, Section 2, Lots 32 and 33 which are combined and recorded as Lot 136. |
35-1981 | 4-27-1981 | Plat of Mason Hills Subdivision Section 2. |
55-1981 | 6-8-1981 | Plat of Putters Point Phase 2-B, Block A. |
19-1982 | 3-8-1982 | Plat of J. & E. Convalescent Rest Home, Inc. dedicating 0.862 acres adjacent to Cox-Smith Road at Chateaugay Drive. |
31-1982 | 4-12-1982 | Plat of J. & E. Convalescent Rest Home, Inc. dedication 0.281 acres adjacent to Cox-Smith Road at Chateaugay Drive. |
86-1982 | 11-8-1982 | Plat of Mason Church of Christ, dedicating 0.309 acres adjacent to Western Row Road at Brookcrest Drive. |
4-1983 | 1-24-1983 | Accepts public improvements of Burr Hills Estates Section III. |
9-1983 | 2-14-1983 | Accepts dedication plat of 0.733 acres of Fireside Drive extending south from Tylersville Road for roadway purposes. |
68-1983 | 7-18-1983 | Accepts final plat of Finsbury Pointe Subdivision Section 2. |
69-1983 | 7-25-1983 | Accepts final plat of Walnut Farms Landominium, Block A. |
77-1983 | 8-8-1983 | Plat of Olympia Fields Subdivision, Block 1, Section 2. |
101-1983 | 10-10-1983 | Plat of Putter’s Pointe Phase IIB, Block B. |
107-1983 | 10-24-1983 | Plat of Country Ridge Phase I, Part I. |
114-1983 | 12-1-1983 | Plat of Finsbury Pointe, Section III |
115-1983 | 12-12-1983 | Plat of Walnut Farms, Block B. |
116-1983 | 12-12-1983 | Plat of Eagle View Subdivision Phase I (Homearama 1984). |
2-1984 | 1-9-1984 | Plat of Country Ridge Phase I, Part II. |
11-1984 | 2-13-1984 | Plat of Walnut Farms Landominiums, Block B. |
13-1984 | 2-13-1984 | Accepts dedication plat of 0.4155 acres of Western Row Road in Charter Oak Subdivision for roadway purposes. |
18-1984 | 2-13-1984 | Plat of Finsbury Point Subdivision, Section IV. |
77-1984 | 8-27-1984 | Public improvements of Western Estates Section I and II. |
78-1984 | 9-15-1984 | Plat of Country Ridge Phase I, Part III. |
84-1984 | 8-27-1984 | Re-plat of Lots 1 and 2 as plat of Mason Industrial Park. |
99-1984 | 10-22-1984 | Final plat of Country Ridge Phase I, Part IV. |
21-1985 | 4-8-1985 | Final plat of Putter’s Point Phase II-B, Block C. |
45-1985 | 7-8-1985 | Final plat of Villas of Winding Creek, Section I. |
54-1985 | 8-12-1985 | Public improvements for Eagle View Subdivision, Phase One. |
72-1985 | 9-23-1985 | Accepts dedication of Beach Boulevard and Water Park Drive in Beach Subdivision. |
101-1985 | 12-23-1985 | Plat of the Villas of Winding Creek. |
86-38 | 4-14-1986 | Final plat of Country Ridge Phase I, Part 5. |
86-48 | 4-28-1986 | Accepts dedication of 0.7957 acres of Forrest Avenue. |
86-65 | 6-23-1986 | Final plat of Country Ridge Phase I, Part 7. |
86-68 | 7-28-1986 | Final plat of Bellefleur Subdivision, Section One. |
86-89 | 9-8-1986 | Replat of Crooked Tree Subdivision Block A, Part I. |
87-8 | 1-12-1987 | Final plat of Bethany Trails Subdivision. |
87-9 | 1-12-1987 | Final plat of Country Ridge Phase I, Part 6. |
87-28 | 4-13-1987 | Final plat of Timber Brook Estates, Section One. |
87-68 | 7-27-1987 | Final plat of Timber Brook Estates, Section 1. |
87-79 | 8-10-1987 | Preliminary plat of Timber Brook Estates, Section 2. |
87-126 | 10-26-1987 | Preliminary plat of Tri-Way Industrial Park. |
87-143 | 11-23-1987 | Final plat of Country Ridge Phase I, Part 8. |
87-148 | 12-14-1987 | Final plat of Country Ridge Phase I, Part 9. |
88-10 | 1-25-1988 | Final plat of Timber Brook Estates, Section 2. |
88-36 | 3-28-1988 | Final plat of Trailside Acres, Section I. |
88-40 | 4-11-1988 | Replat of Western Estates Subdivision. |
88-41 | 4-11-1988 | Approval of preliminary plat of Trailside Acres, Phase II. |
88-44 | 4-25-1988 | Preliminary plat of Quailwood Farms, Block C. |
88-51 | 5-9-1988 | Final plat of Kings Mills Center. |
88-70 | 6-27-1988 | Final plat of Country Ridge Condominiums Phase I, Part 8. |
88-101 | 8-8-1988 | Final plat of Crooked Tree, Section 2. |
88-102 | 8-8-1988 | Final plat of Quailwood Subdivision, Block C. |
88-103 | 8-8-1988 | Final plat of Country Ridge Condominiums, Phase I, Section 9. |
88-136 | 11-14-1988 | Approves final plat of Timber Brook Estates, Section 3. |
88-144 | 11-14-1988 | Approves replat of Trailside Acres, Section 1, Lots 27 through 33. |
88-145 | 11-14-1988 | Approves final plat of Trailside Acres, Section 2, Lots 38 through 52. |
89-10 | 1-23-1989 | Approves final plat of Woodcreek, Part B. |
89-48 | 4-10-1989 | Approving preliminary plat of Kings Mill Center Phase III. |
89-52 | 4-24-1989 | Approval of final plat of Kings Mill Center, Lot 8. |
89-64 | 5-8-1989 | Approval of revised final plat of Crooked Tree, Section 2. |
89-36 | 3-13-1989 | Final plat of Country Ridge, Phase 2. |
89-65 | 8-28-1989 | Final plat of Tri-Way Industrial Park. |
89-92 | 7-24-1989 | Final plat of Snider Cove Condominiums. |
89-83 | 7-24-1989 | Preliminary plat of Lakeside Subdivision. |
89-113 | 8-28-1989 | Final Development Plan of Concord Crossing, Section A. |
89-119 | 9-11-1989 | Final plat of Lakeside Subdivision. |
89-120 | 9-11-1989 | Preliminary plat of Shady Creek Subdivision. |
89-121 | 9-11-1989 | Preliminary plat of Castle Park Subdivision. |
89-153 | 11-27-1989 | Replat of Tower View Subdivision, Lots 1 to 17. |
89-154 | 11-27-1989 | Preliminary plat of Greystone Farms Subdivision. |
89-159 | 12-11-1989 | Final plat of Concord Crossing. |
89-160 | 12-11-1989 | Preliminary plat of Woodcreek Subdivision, Phase II. |
89-161 | 12-11-1989 | Final plat of Tri-Way Industrial Park. |
90-11 | 2-12-1990 | Dedication of Olympia Fields Subdivision, Block I, Trustway Court. |
90-29 | 3-12-1990 | Preliminary plat of Enterprise Park. |
90-30 | 3-12-1990 | Preliminary plat of Durfield Estates. |
90-38 | 3-26-1990 | Final development plan of Bay Pointe Condominiums. |
90-39 | 4-9-1990 | Preliminary plat of Bay Pointe Condominiums. |
90-45 | 4-9-1990 | Dedication of parcel 65 feet wide and 1,833 feet long on north side of Kings Mills Road east of Parkside Drive. |
90-67 | 5-14-1990 | Dedication of parcel of land on east side of Mason- Montgomery Road being 0.5052 acres. |
90-72 | 6-25-1990 | Final development plan of Kings Point Phase I. |
90-77 | 7-9-1990 | Replot of Trailside Acres Subdivision, Section 2, Lots 46 and 47. |
90-82 | 8-13-1990 | Final plat of Concord Crossing, Section B. |
90-86 | 8-27-1990 | Final plat of Winding Creek Estates, Section V. |
90-107 | 9-24-1990 | Replat of Kings Mills Road Subdivision, Phase III, Part 2. |
90-124 | 10-8-1990 | Final plat of Castle Park. |
90-125 | 10-8-1990 | Final plat of Lakeside Subdivision, Section 2. |
90-126 | 10-8-1990 | Replat of Trailside Acres, Section 1, Lots 27 through 33. |
90-135 | 11-12-1990 | Dedication of 3.746 acre right-of-way on SE corner of Mason-Montgomery Road and Bethany Road. |
90-137 | 11-12-1990 | Final plat of Bay Pointe PUD, Sections I and II. |
90-138 | 11-12-1990 | Dedication of Quailwood Subdivision Block C. |
91-4 | 1-14-1991 | Dedication of Lakeside Subdivision, Phase I. |
91-5 | 1-14-1991 | Final plat of Trailside Acres, Section III. |
91-7 | 1-14-1991 | Dedication of right-of-way on south side of Western Row Road and west side of Snider Road. |
91-10 | 1-28-1991 | Dedication of Concord Crossings Subdivision, Section A. |
91-14 | 2-11-1991 | Dedication of right-of-way on east side of Kings Mills Road. |
91-15 | 2-11-1991 | Final plat and dedication of Cintas Commerce Park. |
91-16 | 2-25-1991 | Revised preliminary plat of Durfield Estates Subdivision. |
91-38 | 4-8-1991 | Final plat of Bay Pointe PUD, Section IV. |
91-51 | 5-13-1991 | Dedication of Trailside Acres Subdivision, Sections I and II. |
91-52 | 5-13-1991 | Preliminary plat of Laural Court Subdivision. |
91-65 | 6-10-1991 | Preliminary plat of Lexington Park Subdivision. |
91-78 | 8-12-1991 | Final plat of Lakeside Subdivision, Section 3. |
91-91 | 9-9-1991 | Final plat of Fireside Place. |
91-113 | 11-25-1991 | Final plat of Durfield Estates. |
91-114 | 11-25-1991 | Final plat of Shadycreek Subdivision. |
91-116 | 11-25-1991 | Preliminary plat of Birchwood Farms Subdivision. |
91-127 | 12-9-1991 | Final plat of Bay Pointe PUD, Section V. |
91-128 | 12-9-1991 | Preliminary plat of Glenmeadows Subdivisions. |
92-4 | 1-13-1992 | Dedication of Trailside Acres Subdivision, Section III. |
92-14 | 2-10-1992 | Replat of Lots 12, 13 and 14 of Castle Park Industrial Subdivision. |
92-22 | 3-23-1992 | Revised preliminary plat of Greystone Farms Subdivision. |
92-23 | 3-9-1992 | Final plat of Bay Pointe PUD, Section VI. |
92-30 | 4-27-1992 | Dedication of right-of-way on east side of Reading Road. |
92-45 | 6-8-1992 | Final subdivision plat of Lexington Park, Section 1. |
92-46 | 5-11-1992 | Final subdivision plat of Winding Creek Estates, Section 6. |
92-47 | 5-11-1992 | Final subdivision plat of Laurel Court. |
92-58 | 6-22-1992 | Final subdivision plat of Tyler Station, Section 1. |
92-59 | 6-8-1992 | Final plat of Bay Pointe PUD, Section VII. |
92-64 | 7-13-1992 | Final subdivision plat of Concord Crossing, Section “C.” |
92-65 | 7-13-1992 | Final subdivision plat of Lakeside Subdivision, Section 4. |
92-66 | 7-13-1992 | Dedication of right-of-way on west side of Mason- Montgomery Road, south side of Enterprise Drive and east side of Venture Drive. |
92-67 | 7-13-1992 | Dedication of right-of-way east of Mason- Montgomery Road and south of Stitt Road. |
92-75 | 8-10-1992 | Final subdivision plat of Lexington Park, Section 2. |
92-76 | 8-10-1992 | Preliminary plat of Winding Creek Subdivision, Section VII. |
92-77 | 8-10-1992 | Replat of Lot 4 of Kings Mills Road Subdivision. |
92-91 | 9-14-1992 | Final subdivision plat of Birchwood Farms, Section 1. |
92-92 | 9-14-1992 | Final subdivision plat of Birchwood Farms, Section 2. |
92-99 | 9-14-1992 | Dedication of Lakeside Subdivision Phases II and III. |
92-101 | 10-12-1992 | Preliminary plat of Heathwood Subdivision. |
92-115 | 10-12-1992 | Final development plan for Village Lakes Subdivision, Phase I. |
92-117 | 10-12-1992 | Dedication of right-of-way on east side of Mason- Montgomery Road. |
92-116 | 12-14-1992 | Final subdivision plat of Glenmeadow. |
92-118 | 10-12-1992 | Dedication of right-of-way on south side of Western Row Road. |
92-129 | 11-23-1992 | Final plat of Tyler Station, Section 2. |
92-130 | 12-14-1992 | Final plat of Concord Crossing, Section “D.” |
92-136 | 12-28-1992 | Dedication of right-of-way on south side of Mason Road. |
92-137 | 12-28-1992 | Final subdivision plat of Birchwood Farms, Section 3. |
92-138 | 12-28-1992 | Final subdivision plat of Birchwood Farms, Section 4. |
92-140 | 12-14-1992 | Final plat of Bay Pointe PUD, Section VIII. |
93-13 | 2-8-1993 | Preliminary plat of Crooked Tree Estates, Part III. |
93-35 | 4-12-1993 | Final plat of Kings Mill Road Subdivision, Phase IV. |
93-46 | 5-10-1993 | Preliminary plat of Pipestem. |
93-47 | 5-10-1993 | Preliminary plat of North Ridge Estates. |
93-49 | 5-10-1993 | Final plat of Bay Pointe PUD, Section IX. |
93-63 | 6-14-1993 | Final plat of Brookstone Subdivision, Section 1. |
93-64 | 6-14-1993 | Final development plan for Village Lakes Subdivision, Phase II. |
93-74 | 7-12-1993 | Final plat of Bay Pointe PUD, Section X. |
93-75 | 8-23-1993 | Final subdivision plat of Lexington Park, Section 3. |
93-76 | 8-28-1993 | Final subdivision plat of Birchwood Farms, Section 5. |
93-85 | 8-23-1993 | Final subdivision plat of Village Lakes, Section 1. |
93-92 | 9-13-1993 | Final subdivision plat of Winding Creek, Section 7. |
93-93 | 9-27-1993 | Final subdivision plat of Crooked Tree Estates, Part Three. |
93-104 | 10-11-1993 | Accepting dedication of right-of-way on northeast corner of Mason-Montgomery Road and Stitt Road containing about 0.1817 acres. |
93-105 | 10-11-1993 | Accepting dedication of right-of-way on east side of U.S. Route 42 and west side of Snider Road containing about 1.1163 acres. |
93-108 | 10-11-1993 | Accepting dedication of Lakeside Subdivision, Phase IV. |
93-113 | 1-10-1994 | Final subdivision plat of Village Lakes, Section Two. |
93-114 | 10-11-1993 | Preliminary plat of Trailside Acres, Phase 4. |
93-127 | 11-22-1993 | Final subdivision plat of Birchwood Farms, Section 6. |
93-128 | 11-22-1993 | Replat of Lot 9 of Castle Park Industrial Subdivision. |
93-129 | 11-22-1993 | Accepting right-of-way on west side of U.S. Route 42 containing about 0.307 acres. |
93-130 | 11-22-1993 | Preliminary plat of Crooked Tree Estates, Part 4. |
93-131 | 11-22-1993 | Final plat of Concord Crossing, Section “E.” |
93-132 | 11-22-1993 | Final plat of Franklin Park, Resubdivision of Lot 112, Concord Crossing Subdivision, Section “D.” |
93-138 | 11-22-1993 | Final subdivision plat of Lexington Park, Section 4. |
93-139 | 11-22-1993 | Preliminary plat of Mason Commerce Park. |
93-147 | 1-10-1994 | Preliminary plat of Kings Mill Center. |
93-148 | 12-13-1993 | Preliminary plat of Trailside Acres, Phase 5. |
93-149 | 12-20-1993 | Accepting dedication of right-of-way of Beach Boulevard extension containing about 0.4821 acres. |
94-2 | 1-10-1994 | Dedication of Tyler Station Sections One and Two. |
94-3 | 1-10-1994 | Replat of Lot 7 of Castle Park Industrial Subdivision. |
94-4 | 1-10-1994 | Final plat of Franklin Park, Resubdivision of Lot 106, Concord Crossing Subdivision, Section “D.” |
94-15 | 2-14-1994 | Dedication of right-of-way on west side of Mason- Montgomery Road and north side of Western Row Road. |
94-20 | 2-14-1994 | Final plat of Franklin Park, Resubdivision of Lot 111, Concord Crossing Subdivision, Section D. |
94-14 | 5-9-1994 | Approves preliminary development plan (PUD) of Jewish Home of Cincinnati for 32.557 acres on west side of Mason-Montgomery Road about 1,100 feet north of Socialville-Foster Road. |
94-45 | 4-25-1994 | Approves replat of Lot 67 of Crooked Tree Estates, Part Three. |
94-46 | 4-25-1994 | Approves final development plan for Phase III of Village Lakes Subdivision. |
94-47 | 4-25-1994 | Approves preliminary plat of Leland Subdivision. |
94-51 | 4-25-1994 | Approves final plat of Franklin Park resubdivision of Lot 110, Concord Crossing Subdivision, Section D. |
94-53 | 5-9-1994 | Approves preliminary plat of Lee Ann Estates Subdivision. |
94-54 | 5-9-1994 | Approves final subdivision plat of Trailside Acres, Phase 5. |
94-55 | 5-9-1994 | Approves final plat of Snider Cove Development, Phase III. |
94-59 | 5-22-1994 | Approves final plat of Franklin Park resubdivision of Lots 107 to 109, Concord Crossing Subdivision, Section D. |
94-67 | 6-13-1994 | Approves final subdivision plat of Coddington Reserve, Phase I. |
94-68 | 6-13-1994 | Approves final subdivision plat of Coddington Reserve, Phase II. |
94-78 | 8-22-1994 | Approves final subdivision plat of Lexington Park, Phase 5. |
94-79 | 7-25-1994 | Approves final subdivision plat of Trailside Acres, Phase 4. |
94-80 | 7-28-1994 | Approves final replat of Coddington Reserve, Phase I and II, Lots 97 through 105. |
94-85 | 8-8-1994 | Approves final subdivision plat of Village Lakes, Section III, Blocks “A” and “B.” |
94-91 | 8-22-1994 | Aproves final subdivision plat of Birchwood Farms, Section 7. |
94-97 | 9-12-1994 | Dedication of right-of-way on west side of Mason- Montgomery Road, 0.5208 acres. |
94-98 | 9-12-1994 | Approves final subdivision plat of Village Lakes, Section III, Block “C.” |
94-107 | 10-10-1994 | Approves final subdivision plat of Lee Ann Estates. |
94-108 | 10-10-1994 | Dedication of Lexington Park Subdivision Sections 1 and 2. |
94-111 | 10-24-1994 | Dedication of right-of-way on west side of U.S. Route 42, 0.058 acres. |
94-115 | 11-14-1994 | Approves final subdivision plat of Crooked Tree Estates, Part Four, Block “A.” |
94-116 | 11-14-1994 | Approves replat of Lot 87 of Village Lakes Subdivision, Section III, Block “A.” |
94-117 | 11-14-1994 | Dedication of Durfield Estates Subdivision. |
94-129 | 12-12-1994 | Dedication of Kings Mill Road Subdivision, Phases I and III. |
94-130 | 12-12-1994 | Approves preliminary plat of Birchwood South Subdivision. |
94-131 | 12-12-1994 | Approves final development for Cedar Village. |
94-138 | 12-12-1994 | Approves final plat of Brookstone Subdivision, Section Two. |
95-1 | 1-9-1995 | Approves final subdivision plat of Birchwood Farms, Section 8. |
95-2 | 1-9-1995 | Approves final plat of Pipestem Subdivision. |
95-3 | 1-9-1995 | Dedication of Birchwood Farms Subdivision, Sections 1 and 3. |
95-8 | 2-13-1995 | Approves final plat of Mason Commerce Park Subdivision. |
95-9 | 1-23-1995 | Approves final plat of Coddington Reserve, Phase III. |
95-18 | 2-13-1995 | Approves preliminary plat of the Oaks of Crooked Tree and the Willows of Crooked Tree. |
95-19 | 2-13-1995 | Approves replat of Lots 138-143 of Village Lakes Subdivision, Section Three, Block “B.” |
95-32 | 3-13-1995 | Approves final plat of Snider Cove Development, Phase IV. |
95-36 | 4-10-1995 | Approves preliminary plat of Heritage Club. |
95-37 | 4-10-1995 | Dedication of Village Lakes Subdivision, Section One. |
95-44 | 5-8-1995 | Dedication of right-of-way on east side of Mason- Montgomery Road, 0.9397 acres. |
95-45 | 5-8-1995 | Approves final development plan for Village Lakes Subdivision, Phase IV. |
95-46 | 5-8-1995 | Dedication of Shady Creek Subdivision. |
95-48 | 6-12-1995 | Approves preliminary development plan (PUD) of 19.365 acres on west side of Mason-Montgomery Road, 1,100 feet south of Bethany Road. |
95-50 | 7-10-1995 | Approves preliminary development plan (PUD) of 187.40 acres on north side of Stitt Road, 2,680 feet east of Mason-Montgomery Road. |
95-54 | 6-12-1995 | Approves final development plan of Village Lakes Subdivision, Phase IV. |
95-56 | 6-12-1995 | Approves final subdivision plat of Eagle View Village, Section I, Phase 1 through 16. |
95-75 | 8-14-1995 | Final plat of White Blossom, Section 1. |
95-76 | 8-14-1995 | Accepts dedication of 0.652 acres of right-of-way on east side of U.S. Route 42. |
95-77 | 8-14-1995 | Final plat of Western Row Plaza. |
95-96 | 9-11-1995 | Final planned unit development plan for Meadows at Ashley Place. |
95-97 | 9-11-1995 | Final planned unit development plan for Ashley Commons. |
95-98 | 9-11-1995 | Preliminary plat of Ashley Place. |
95-103 | 9-25-1995 | Final plat of Lexington Park, Phase 6. |
95-111 | 10-23-1995 | Final plat of Village Lakes, Section IV. |
95-112 | 10-23-1995 | Final plat of Village Lakes, Section V. |
95-113 | 10-9-1995 | Dedication of Lexington Park Subdivision. |
95-114 | 10-9-1995 | Final plat of Mallards of Mason, Lot No. 55. |
95-115 | 10-9-1995 | Replat of Eagle View Village, Phase I, Section 1. |
95-118 | 10-9-1995 | Preliminary plat of Cooper Ridge Subdivision. |
95-120 | 10-23-1995 | Final plat of Heritage Club, Section 1. |
95-129 | 11-13-1995 | Replat of Eagle View Village, Phases 2 thru 6 and Phase 16, Section 1. |
95-130 | 11-13-1995 | Dedication of Castle Park Subdivision. |
95-137 | 11-27-1995 | Dedication of 0.353 acre right-of-way on north side of U.S. Route 42. |
95-138 | 11-27-1995 | Replat of Lots 11 and 12 of Kings Mill Road Subdivision. |
95-139 | 11-27-1995 | Preliminary plat of Crooked Tree Estates, Part 5. |
95-140 | 11-27-1995 | Final plat of Birchwood Farms, Section 9. |
95-145 | 12-11-1995 | Final planned unit development plat for Fairways of Pine Run. |
95-146 | 12-11-1995 | Final plat of Oaks of Crooked Tree, Section 1. |
95-147 | 12-11-1995 | Preliminary plat of Mallards of Mason Subdivision. |
96-2 | 1-8-1996 | Final subdivision plat of White Blossom, Section 2. |
96-3 | 1-8-1996 | Final subdivision plat of Birchwood Farms, Section 10. |
96-4 | 1-8-1996 | Final subdivision plat of Birchwood South, Section 1. |
96-5 | 1-8-1996 | Final plat of Coddington Reserve, Phase IV. |
96-6 | 1-8-1996 | Dedication of Trailside Acres, Sections 4 and 5. |
96-7 | 1-8-1996 | Dedication of Winding Creek Subdivisions, Sections 5, 6, and 7. |
96-13 | 1-22-1996 | Dedication of Birchwood Farms Subdivision, Sections 2, 4, 5 and 6. |
96-14 | 1-22-1996 | Dedication of Lexington Park Subdivision, Section 4. |
96-15 | 1-22-1996 | Dedication of Village Lakes Subdivision, Section 2. |
96-16 | 1-22-1996 | Dedication of Brookstone Subdivision, Section 1. |
96-17 | 1-22-1996 | Dedication of Crooked Tree Subdivision, Section 3. |
96-18 | 1-22-1996 | Dedication of Concord Crossing Subdivision, Sections C and D. |
96-19 | 1-22-1996 | Dedication of Beach Boulevard extension. |
96-20 | 1-22-1996 | Dedication of Glenmeadows Subdivision. |
96-22 | 2-12-1996 | Preliminary plat of Wellmax. |
96-23 | 2-12-1996 | Final subdivision plat of Wellmax. |
96-24 | 2-12-1996 | Replat of Eagle View Village, Phases 7, 8 and 9, Section 1. |
96-25 | 2-12-1996 | Final subdivision plat of Eagle View Village, Section 2, Phases 17 thru 35. |
96-50 | 4-8-1996 | Final subdivision plat of Heritage Club, Section 2, Lot 104. |
96-57 | 4-22-1996 | Final subdivision plat of White Blossom, Section III. |
96-62 | 5-13-1996 | Dedication of Mason Commerce Park. |
96-69 | 5-28-1996 | Final plat of Concord Crossing, Section “F.” |
96-71 | 6-10-1996 | Final planned unit development plan for Tyler Station Office Park. |
96-78 | 6-10-1996 | Final planned unit development plan for Village Lakes Subdivision, Section 6. |
96-94 | 7-8-1996 | Final planned unit development plan for Hickory Woods Subdivision, Section 1. |
96-95 | 7-22-1996 | Final plat of Crooked Tree Estates Subdivision, Part 4, Block B. |
96-96 | 7-8-1996 | Final plat of White Blossom Center Commercial Subdivision. |
96-97 | 7-8-1996 | Final subdivision plat of White Blossom Section IV. |
96-98 | 7-8-1996 | Final plat of Eagle View Subdivision, Section 3, Phases 36 thru 47. |
96-99 | 7-8-1996 | Final plat of Eagle View Subdivision, Section 4, Phases 48 thru 51. |
96-104 | 7-22-1996 | Final plat of Hickory Woods Subdivision, Section 1. |
96-105 | 7-22-1996 | Final subdivision plat of Heritage Club Subdivision, Section 3. |
96-106 | 7-22-1996 | Final subdivision plat of Heritage Club Subdivision, Section 4. |
96-107 | 7-22-1996 | Final subdivision plat of Lexington Park, Phase 7. |
96-110 | 8-12-1996 | Replat of Lots 6 and 7, Hi-tek Court, Triway Industrial Park. |
96-111 | 8-12-1996 | Final subdivision plat of Village Lakes Subdivision, Section 5, Block “B” PUD. |
96-112 | 8-12-1996 | Final subdivision plat of Village Lakes Subdivision, Section 5, Block “C” PUD. |
96-113 | 8-12-1996 | Replat of Lot 29 of Oaks of Crooked Tree, Section One. |
96-114 | 8-12-1996 | Final subdivision plat of Fairway at Pine Run Subdivision, Section 1. |
96-115 | 8-12-1996 | Final subdivision plat of Tyler Office Park. |
96-116 | 9-9-1996 | Revised preliminary development plan (PUD) for Franklin Park Subdivision, Lot 115. |
96-121 | 8-26-1996 | Final subdivision plat of Meadows at Ashley Place. |
96-122 | 8-26-1996 | Final subdivision plat of Meadows at Ashley Place, Section 1. |
96-126 | 9-23-1996 | Final plat of Oaks of Crooked Tree Subdivision, Section 2. |
96-127 | 9-9-1996 | Dedication of 1.1488 acres on north side of Socialville-Fosters Road. |
96-128 | 9-9-1996 | Replat of Eagle View Village, Section 1, Phases 10, 14, 15. |
96-141 | 10-14-1996 | Final subdivision plat of Birchwood South, Section 2. |
96-142 | 10-14-1996 | Final plat of Oaks of Crooked Tree Subdivision, Section Three “A.” |
96-143 | 10-14-1996 | Final subdivision plat of Village Lakes Subdivision, Section Six. |
96-144 | 10-14-1996 | Final subdivision plat of Fairways at Pine Run Subdivision, Section 2. |
96-145 | 10-14-1996 | Preliminary plat of Villas at Pine Run Subdivision. |
96-147 | 10-28-1996 | Final subdivision plat of Ashley Commons. |
96-157 | 11-25-1996 | Final plat of White Blossom Subdivision, Section V. |
96-158 | 11-11-1996 | Preliminary plat of Fairways of Crooked Tree, Part 2. |
96-159 | 11-11-1996 | Final plat of Eagleview Village Subdivision, Section V. |
96-160 | 11-11-1996 | Replat of Eagle View Village, Section One, Phases 11 and 13. |
96-161 | 11-11-1996 | Replat of Eagle View Village, Section Two, Phase 18. |
96-162 | 12-9-1996 | Preliminary development plan (PUD) of 11.4 acres located on east side of Mason-Montgomery Road about 2300 feet south of Western-Row Road. |
96-164 | 3-10-1997 | Preliminary development plan of 175.5 acres located on north side of Tylersville Road about 3,200 feet west of U.S. Route 42. |
96-175 | 12-9-1996 | Final plat of The Fairways of Crooked Tree Subdivision, Section 1, Block A. |
96-176 | 12-9-1996 | Replat of Eagle View Village, Section 2, Phase 30. |
96-177 | 12-9-1996 | Replat of Eagle View Village, Section 3, Phase 36. |
97-1 | 1-13-1997 | Final planned unit development plan for Evergreen Manor Development, Section 1. |
97-2 | 1-13-1997 | Revision to the preliminary development plan for White Blossom Subdivision, Section VI. |
97-3 | 1-13-1997 | Final subdivision plat of Snider Cove Subdivision. |
97-20 | 2-10-1997 | Dedication of right-of-way on north side of Stitt Road containing about 1.337 acres. |
97-21 | 2-10-1997 | Replat of Lots 21, 23, 24 and 25 of Castle Park Subdivision. |
97-22 | 3-10-1997 | Preliminary development plan (PUD) of 146 acres located on south side of Bethany Road about 2700 feet west of Mason-Montgomery Road. |
97-37 | 3-10-1997 | Final planned unit development plan for Franklin Park, Phase II. |
97-38 | 3-10-1997 | Preliminary plat for dedication of relocation of Irwin-Simpson Road on south part of Proctor and Gamble Health Care Research property, containing 3.94 acres. |
97-42 | 4-28-1997 | Final subdivision plat of Ashley Place, Section II. |
97-47 | 4-14-1997 | Final subdivision plat of The Manor House. |
97-48 | 4-14-1997 | Final planned unit development plan for Parkside Subdivision. |
97-49 | 4-14-1997 | Final planned unit development plan for Greenbrier, Phase I. |
97-50 | 5-12-1997 | Approval of final subdivision plat of Franklin Park, Phase II. |
97-51 | 4-14-1997 | Replat of Eagle View Village, Section 4, Phases 48 through 51. |
97-64 | 4-28-1997 | Accepts dedication of Lexington Park Subdivision, Section 5. |
97-67 | 5-12-1997 | Approval of final subdivision plat of White Blossom, Section VI. |
97-72 | 5-12-1997 | Approves replat of Eagle View Village, Section Three, Phase 37. |
97-76 | 5-27-1997 | Accepts dedication of Birchwood Farms Subdivision, Section 7. |
97-77 | 5-27-1997 | Accepts dedication of Birchwood Farms Subdivision, Section 8. |
97-80 | 6-23-1997 | Approves preliminary plat of Greenbrier Subdivision. |
97-81 | 6-23-1997 | Approves replat of Eagle View Village, Section Three, Phase 38. |
97-89 | 7-28-1997 | Approves final subdivision plat of Villas of Pine Run. |
97-98 | 8-11-1997 | Approves preliminary plat of Mason Pointe Subdivision. |
97-103 | 10-13-1997 | Accepts dedication of right-of-way for realignment of Irwin-Simpson Road between Duke Drive and Mason-Montgomery Road (3.4 acres). |
97-107 | 9-8-1997 | Accepts dedication of right-of-way on north side of Western Row Road between Snider Road and Indiana & Ohio Railroad right-of-way. |
97-114 | 9-22-1997 | Approves replat of Eagle View Village, Section One, Phase 12; Section Four, Phase 51; and Section Two, Phase 31. |
97-120 | 9-22-1997 | Approves final subdivision plat of Birchwood South, Section Three. |
97-122 | 10-13-1997 | Approves final plat of Heritage Club Subdivision, Section Five. |
97-123 | 10-13-1997 | Approves final plat of Oaks of Crooked Tree Subdivision, Section 4. |
97-124 | 10-13-1997 | Approves final plat of Fairways of Crooked Tree Subdivision, Part One, Block B. |
97-125 | 10-13-1997 | Approves final subdivision plat of Fairway at Pine Run Subdivision, Section 3. |
97-126 | 10-13-1997 | Approves final subdivision plat of Ashley Place, Section III. |
97-127 | 1-13-1997 | Approves replat of Eagle View Village, Section Three, Phase 39. |
97-131 | 10-27-1997 | Approves final subdivision plat of Greenbrier, Phase I. |
97-138 | 11-10-1997 | Approves replats of Eagle View Village, Section Two, Phase 29 and Section Five, Phase 52. |
97-140 | 11-24-1997 | Approval of final subdivision plat of Greenbrier, Phase I-A. |
97-147 | 12-8-1997 | Approves final plat of Parkside Subdivision, Phase One. |
97-149 | 12-8-1997 | Approves final plat of Sunset Ridge Subdivision, Section One. |
97-150 | 12-8-1997 | Accepts dedication of Birchwood Farms Subdivision Section 9, and public improvements. |
97-151 | 12-8-1997 | Accepts dedication of Lexington Park Subdivision, Section 6 and public improvements. |
98-7 | 1-12-1998 | Approves replat of Eagle View Village, Section Five, Phase 53. |
98-18 | 2-9-1998 | Accepts dedication of right-of-way for Snider Road on E side of Sunset Ridge Subdivision (1.986 acres). |
98-24 | 2-23-1998 | Approves final plat of Oakwood Lakes, Section 1-A. |
98-47 | 4-13-1998 | Accepting dedication of 60-feet right-of-way for Cedar Village Drive (1.02 acres). |
98-49 | 4-13-1998 | Approves revision to preliminary subdivision plat for Oaks of Crooked Tree Subdivision. |
98-50 | 4-13-1998 | Approves replat of Village Lakes Subdivision, Section Five, Lots 261A and 262A. |
98-51 | 4-13-1998 | Approves replat of Eagle View Village, Section Four, Phases 48-50. |
98-53 | 4-13-1998 | Approves replat of Castle Park Industrial Subdivision. |
98-71 | 6-8-1998 | Approves preliminary plat of 42 North Commerce Parke Subdivision. |
98-72 | 6-8-1998 | Approves final plat of Heritage Club Subdivision, Section Six. |
98-73 | 6-8-1998 | Approves final plat of Heritage Club Subdivision, Section Seven. |
98-74 | 6-8-1998 | Accepts dedication of Concord Crossing Subdivision, Section E and improvements. |
98-80 | 6-22-1998 | Approves final plat of Oaks of Crooked Tree Subdivision, Section 5A. |
98-83 | 7-13-1998 | Approves final plat of Heritage Club Subdivision, Section Eight. |
98-84 | 7-13-1998 | Approves final plat of Oakwood Lakes Subdivision, Section 1, Part B. |
98-85 | 7-13-1998 | Approves final plat of Parkside Subdivision, Section 1, Part B. |
98-88 | 7-13-1998 | Approves replat of Eagle View Village, Section Two, Phases 17-35. |
98-115 | 8-24-1998 | Approves replat of Eagle View Village, Phases 19 and 20, Section Two, Phases 17-35. |
98-116 | 8-24-1998 | Approves replat of Eagle View Village, Section Four, Phases 48-51; Section Five, Phases 52-59. |
98-117 | 8-24-1998 | Approves replat of Eagle View Village, Section Three, Phases 36-47. |
98-122 | 9-14-1998 | Approves final plat of Greenbrier, Phase 1F. |
98-123 | 9-14-1998 | Accepts dedication of right-of-way for Innovation Way Extension (1.539 acres). |
98-141 | 10-12-1998 | Approves replat of Heritage Club Subdivision, Sections Two and Three, Lots 211-216. |
98-144 | 10-12-1998 | Approves replat of Parkside Subdivision, Section One, Lots 167-170. |
98-145 | 10-12-1998 | Approves final plat of Fairways at Pine Run, Section 4. |
98-146 | 10-12-1998 | Approves replat of Eagle View Village, Section Three, Phase 47, Lots 149-152. |
98-153 | 10-26-1998 | Accepts dedication of Crooked Tree Subdivision, Part II and public improvements. |
98-154 | 10-26-1998 | Approves final plat of Birchwood South Subdivision, Section 4. |
98-155 | 10-26-1998 | Approval of final plat of Fairways of Crooked Tree, Part 2, Block A. |
98-161 | 11-9-1998 | Approves replat of Kings Mills Road Subdivision, Lot 3. |
98-162 | 11-9-1998 | Accepts dedication of right-of-way on north side of Cedar Village Drive (.41 acres). |
98-163 | 11-9-1998 | Approves replat of Parkside Subdivision, Section One, Lot 217. |
98-171 | 11-23-1998 | Approves final plat of Windemere Subdivision, Phase I. |
98-172 | 11-23-1998 | Approves final plat of Greenbrier Subdivision, Section 1B. |
98-173 | 11-23-1998 | Approves final plat of Greenbrier Subdivision, Section 1C. |
98-174 | 11-23-1998 | Approves final plat of Parkside Subdivision, Section 2, Blocks A and B. |
98-188 | 12-14-1998 | Accepts dedication of right-of-way on northeast corner of Reading Road, and Western Row Road. |
98-189 | 12-14-1998 | Approves replat of Eagle View Village, Section Three, Phase 42, Lots 153-156. |
99-2 | 1-11-1999 | Accepts dedication of Concord Crossing Subdivision, Section F and public improvements. |
99-11 | 3-22-1999 | Approves final plat of 42 North Commerce Parke. |
99-21 | 2-8-1999 | Approving the preliminary plat of Lakewood Commerce Center Subdivision. |
99-22 | 2-8-1999 | Accepting dedication of a right-of-way on the west side of Mason-Montgomery Road, south of Brewer, containing approximately .254 acre. |
99-23 | 2-8-1999 | Approving the preliminary plat of Weatherstone Residential Subdivision. |
99-37 | 2-22-1999 | Accepting dedication of Crooked Tree Estates, Part 4, Block “A” and the public improvements contained therein. |
99-38 | 2-22-1999 | Accepting dedication of Enterprise Drive and Ventura Drive and the public improvements contained therein. |
99-45 | 3-8-1999 | Approves preliminary plat of Kingsmill Business Park. |
99-46 | 3-8-1999 | Approves preliminary plat of Heritage Club Subdivision, Section 10. |
99-54 | 3-22-1999 | Approves final subdivision plat of Eagle View Village, Section II, Lots 157-160, Phases 17-35. |
99-56 | 4-12-1999 | Approves replat of Oakwood Lakes Subdivision, Section One, Block B, Lot 14. |
99-68 | 5-10-1999 | Approves the replat of Parkside Subdivision, Section 1A, Lots 227 and 228. |
99-69 | 5-10-1999 | Approves the replat of Eagle View Village, Phase 46, Lots 161-164. |
99-72 | 5-24-1999 | Approves the final plat of Central Parke of Mason. |
99-73 | 5-24-1999 | Accepts dedication of Coddington Reserve Subdivision, Sections 1, 2 and 3. |
99-74 | 5-24-1999 | Accepts dedication of Coddington Reserve Subdivision, Section 4. |
99-75 | 5-24-1999 | Approves the replat of Eagle View Village, Phase 34, Lots 165-168. |
99-79 | 6-14-1999 | Approves the final plat of Medical Professional Center of White Blossom. |
99-81 | 6-14-1999 | Approves the replat of Eagle View Village, Section Five, Phase 54, Lots 169-172. |
99-96 | 7-12-1999 | Approves the final plat of Hickory Woods Subdivision, Section Two. |
99-97 | 7-12-1999 | Approves the replat of Oakwood Lakes Subdivision, Lot 14, Section One, Block B. |
99-98 | 7-12-1999 | Approves the final plat of Sunset Ridge Subdivision, Section Two. |
99-99 | 7-12-1999 | Approves the final plat of Arborcreek Subdivision, Section One. |
99-100 | 7-26-1999 | Approves the preliminary plat of Everybody’s Farm, Snider Road Extension. |
99-101 | 7-12-1999 | Approves the replat of Village Lakes Subdivision, Lot 258, Section Five, Block C. |
99-102 | 7-26-1999 | Approves the final plat of the Oaks of Crooked Tree Subdivision, Section Five, Block B. |
99-103 | 7-26-1999 | Accepts the public improvements for Western Row Plaza. |
99-108 | 8-9-1999 | Approves the replat of Eagle View Village, Section Three, Phase 41, Lots 173-176. |
99-109 | 8-9-1999 | Approves the replat of Eagle View Village, Section Five, Phase 56, Lots 177-180. |
99-110 | 8-9-1999 | Accepts the public improvements for Ashley Place, Sections One, Two and Three. |
99-111 | 8-9-1999 | Accepts the public improvements for the Meadows of Ashley Place. |
99-112 | 8-9-1999 | Accepts the public improvements for Fairways of Crooked Tree, Part One, Blocks “A” and “B.” |
99-113 | 8-9-1999 | Accepts the public improvements for Crooked Tree Estates, Part 4, Block “B.” |
99-114 | 8-9-1999 | Approves the replat of Parkside Subdivision, Section 1, Lots 121A-123-A. |
99-119 | 9-13-1999 | Approves the final plat of the Greenbrier Subdivision, Phase 1D. |
99-125 | 9-13-1999 | Approves the final plat of the Fairways of Crooked Tree Subdivision, Part Two, Block “B.” |
99-126 | 9-13-1999 | Approves the final plat of Heritage Club Subdivision, Section Ten. |
99-127 | 9-13-1999 | Approves the preliminary plat of Mason Church of Christ, Central Parke Boulevard Extension. |
99-128 | 9-27-1999 | Accepts the public improvements for Cedar Village Drive, west of Mason-Montgomery Road. |
99-129 | 9-13-1999 | Accepts the public improvements for Manor House Subdivision. |
99-130 | 9-13-1999 | Accepts the public improvements for Leeann Estates Subdivision. |
99-143 | 9-27-1999 | Approves the final plat of Birchwood South, Section 5. |
99-144 | 9-27-1999 | Approves the final plat of Parkside Subdivision, Section 3, Block “A.” |
99-145 | 9-27-1999 | Approves the final plat of Parkside Subdivision, Section 3, Block “C.” |
99-146 | 9-27-1999 | Accepts the public improvements for Pipestem Subdivision. |
99-147 | 9-27-1999 | Approves the replat of Eagle View Village, Section 23, Phases 17-35, Lots 181 through 184. |
99-149 | 10-11-1999 | Approves the final plat of Whispering Springs Subdivision, Section One. |
99-150 | 10-11-1999 | Accepts the public improvements for Village Lakes Subdivision, Sections 3A, 3B, 3C, 4, 5, 5C and 6A. |
99-151 | 10-11-1999 | Dedication of a right-of-way on the north side of the intersection of Mason-Montgomery Road, south of the Indiana and Ohio Railroad. |
99-152 | 10-11-1999 | Dedication of a right-of-way on the northwest corner of the property owned by Kingsway Community Church on the south side of Cox- Smith Road. |
99-153 | 10-11-1999 | Approves the replat of Eagle View Village, Section Five, Phase 58. |
99-172 | 10-25-1999 | Accepts the public improvements for Brookstone Subdivision, Section 2. |
99-173 | 10-25-1999 | Approves the final plat of Crooked Tree Subdivision, Part Two, Block “D.” |
99-183 | 11-8-1999 | Approves the replat of Eagle View Village, Section Five, Phase 55, Lots 189-192. |
99-202 | 12-13-1999 | Approves the replat of the Fairways of Crooked Tree, Part Two, Block “B,” Lot 99. |
99-203 | 12-13-1999 | Accepts the public improvements for the Oaks of Crooked Tree, Sections 1 and 2. |
99-204 | 12-13-1999 | Accepts the public improvements for 42 North Commerce Parke. |
99-205 | 12-13-1999 | Approves the final plat of Thorngate at Windemere, Phases 1 and 4. |
2000-3 | 1-10-2000 | Approves the replat of Central Parke of Mason, Lots 5, 6 and 7. |
2000-4 | 1-10-2000 | Approves the final plat of Windemere, Phase 1A. |
2000-6 | 1-10-2000 | Approves the replat of Whispering Springs Subdivision, Lot 32. |
2000-13 | 1-24-2000 | Approves the final plat of Weatherstone Subdivision, Section One. |
2000-26 | 3-13-2000 | Approves the final plat of Snider Cove, Phase Six. |
2000-35 | 3-27-2000 | Accepts the public improvements for Birchwood Farms, Section 10. |
2000-41 | 4-10-2000 | Approves the preliminary plat of Avalon Farms Subdivision. |
2000-47 | 4-24-2000 | Approves the final plat of Windemere Subdivision, Phase II. |
2000-48 | 4-24-2000 | Approves the replat of Eagle View Village, Section Two, Phase 23, Lots 193 through 196. |
2000-49 | 4-24-2000 | Approves the replat of Eagle View Village, Section Two, Phase 57, Lots 197-200. |
2000-57 | 5-8-2000 | Approves the final plat of Birchwood South, Section 6. |
2000-63 | 5-22-2000 | Dedication of right-of-way from the current terminus of Central Park Boulevard south to Cedar Village Drive and the right-of-way on the west side of Mason-Montgomery Road directly north of Cedar Village. |
2000-65 | 6-12-2000 | Approves the replat of Eagle View Village, Section Three, Phase 45, Lots 201-204. |
2000-72 | 6-12-2000 | Approves the replat of Cintas Commerce Park Subdivision, Lot 2 and part of Lot 1. |
2000-73 | 6-12-2000 | Approves the preliminary plat of the Mason Enterprise Park. |
2000-74 | 6-12-2000 | Approves the replat of Thorngate at Windemere Subdivision, Lot 22. |
2000-75 | 6-12-2000 | Approves the final plat of Weatherstone Subdivision, Section 2. |
2000-77 | 6-12-2000 | Accepts the public improvements for White Blossom Subdivision, Sections 1, 2, 3, 4, 5 and 6. |
2000-85 | 6-26-2000 | Approves the final plat of Windemere Subdivision, Phase 3. |
2000-86 | 6-26-2000 | Approves the revised preliminary plat of Avalon Farms Subdivision. |
2000-95 | 7-24-2000 | Approves the final plat of Village Lakes Subdivision, Section 6, Block “B.” |
2000-96 | 7-24-2000 | Approves the final plat of Oakes of Crooked Tree Subdivision, Section 6, Block “A.” |
2000-97 | 7-24-2000 | Approves the replat of Eagle View Village, Section Two, Phase 26, Lots 205 through 208. |
2000-110 | 8-14-2000 | Approves the replat of Eagle View Village, Section Two, Phase 24, Lots 209 through 212. |
2000-120 | 8-28-2000 | Approves the plat of easement for Pebble Creek of Mason, Phase I. |
2000-121 | 8-28-2000 | Approves the final plat of Fairways of Crooked Tree Subdivision, Part 2, Block “E.” |
2000-127 | 9-10-2000 | Approves the final plat of Mason Fields Subdivision. |
2000-147 | 10-9-2000 | Approves the final plat of Oakwood Lakes Subdivision, Section 2. |
2000-148 | 10-9-2000 | Approves the final plat of Weatherstone Subdivision, Section 3, Block A. |
2000-149 | 10-9-2000 | Accepts the public improvements for Sunset Ridge, Section 1. |
2000-151 | 10-9-2000 | Approves the replat of Eagle View Village, Section Two, Phase 33, Lots 213 through 216. |
2000-159 | 10-23-2000 | Approves the final plat of the Greenbrier Subdivision, Phase 1E. |
2000-160 | 10-23-2000 | Approves the replat of Weatherstone Subdivision, Section One, Lots 18 and 20. |
2000-168 | 11-13-2000 | Accepts the public improvements for Lexington Park, Section 7. |
2000-177 | 12-11-2000 | Approves the dedication plat of Greenbrier Subdivision, Phase II, Section 1, Block “C.” |
2000-178 | 11-27-2000 | Approves the preliminary plat of Avalon Farms Subdivision. |
2000-179 | 11-27-2000 | Approves the replat of Eagle View Village, Section Two, Phase 32, Lots 217 through 220. |
2000-189 | 12-11-2000 | Approves the final plat of Arbor Creek Subdivision, Section 2. |
2000-190 | 12-11-2000 | Approves the final plat of Christ’s Church at Mason, Section 1. |
2000-191 | 12-11-2000 | Approves the replat of Tri-Way Industrial Park, Lot 2. |
2000-192 | 12-11-2000 | Approves the replat of Thorngate at Windemere Subdivision, Lot 15. |
2000-193 | 12-11-2000 | Accepts the public improvements for Fairways of Crooked Tree, Part 2, Block “A.” |
2000-194 | 12-11-2000 | Accepts the public improvements for the Oaks of Crooked Tree, Section 3, Block “A.” |
2000-195 | 12-11-2000 | Accepts the public improvements for Tyler Office Park. |
2000-196 | 12-11-2000 | Accepts the public improvements for Village Lakes, Section 5, Block “B.” |
2001-01 | 1-8-2001 | Accepts dedication of right-of-way on the west side of State Route 741, containing a total of 1.263 acres. |
2001-02 | 1-8-2001 | Approves the replat of Thorngate at Windemere Subdivision, Lot B and Lot 24. |
2001-27 | 2-12-2001 | Accepts the public improvements for Franklin Park Subdivision, Phase 2. |
2001-28 | 2-12-2001 | Approves the replat of Oakwood Lakes Subdivision, Section 2, Lots 19 through 24. |
2001-40 | 3-12-2001 | Approves the dedication plat of Snider Road, north of U.S. Route 42. |
2001-47 | 3-26-2001 | Approves the replat of Eagle View Village, Section 2, Phase 25, Lots 221 through 224. |
2001-48 | 3-26-2001 | Approves the replat of Eagle View Village, Section 3, Phase 43, Lots 225 through 228. |
2001-52 | 4-9-2001 | Accepts public improvements for Heritage Club Subdivision, Sections 1, 2, 3, 4, 5 and 8. |
2001-53 | 4-9-2001 | Approves the final plat of High Tech Center of White Blossom. |
2001-54 | 4-9-2001 | Approves the replat of Eagle View Village, Section 2, Phase 27, Lots 229 through 232. |
2001-73 | 4-23-2001 | Accepts public improvements for Ashley Commons Subdivision. |
2001-74 | 4-23-2001 | Approves preliminary plat of 31.775 acres and access road directly across from Cintas Boulevard on the south side of Western Row Road. |
2001-96 | 6-25-2001 | Approves the replat of Eagle View Village, Section 3, Phase 44, Lots 233 through 236. |
2001-97 | 6-25-2001 | Approves the replat of Thorngate at Windemere Subdivision, Lots 16 through 20. |
2001-98 | 6-25-2001 | Approves the replat of Parkside Subdivision, Lots 3 and 4. |
2001-99 | 6-25-2001 | Approves the replat of Parkside Subdivision, Lots 179 and 168. |
2001-100 | 6-25-2001 | Approves the replat of Kings Mills Road Subdivision, Lot 9. |
2001-101 | 6-25-2001 | Accepts public improvements for Central Parke of Mason Subdivision. |
2001-102 | 6-25-2001 | Approves the dedication plat of Mason- Montgomery Road north of Tylersville Road. |
2001-146 | 8-13-2001 | Approves the replat of Thorngate at Windemere, Lots 14 and 21 to Lots 14A through 14D and Lots 21A through 21D. |
2001-157 | 8-27-2001 | Approves final plat of the Oaks of Crooked Tree Subdivision, Section 6, Block B. |
2001-158 | 8-27-2001 | Approves the final plat of Parkside Subdivision, Section 2, Block C. |
2001-159 | 8-27-2001 | Approves the final plat of Parkside Subdivision, Section 3, Block B. |
2001-160 | 8-27-2001 | Accepts the public improvements for Heritage Club Subdivision, Section 7. |
2001-167 | 8-27-2001 | Approves the dedication plat of U.S. Route 42, west of State Route 741. |
2001-168 | 9-10-2001 | Approves the final plat of Arbor Creek Subdivision, Section 3. |
2001-177 | 10-8-2001 | Approves the replat of Oakwood Lakes Subdivision, Section 2, Lots 38 through 42. |
2001-196 | 11-26-2001 | Accepts the public improvements for Birchwood South Subdivision, Section 1. |
2001-197 | 11-26-2001 | Accepts the public improvements for Oaks of Crooked Tree Subdivision, Section 4. |
2001-198 | 11-26-2001 | Accepts the public improvements for Fairways of Crooked Tree Subdivision, Part 2, Blocks B, C and D. |
2001-199 | 11-26-2001 | Accepts the public improvements for Hickory Woods Subdivision, Section 1. |
2001-217 | 12-10-2001 | Approves the final plat of Weatherstone Subdivision, Section 4, Phase A. (Repealed by 2002-08.) |
2002-03 | 1-14-2002 | Approves the replat of Arbor Creek, Sections 1, 2 and 3, Lots 64-87, 104, 146, and 149 through 152. |
2002-04 | 1-14-2002 | Approves the final plat of Whispering Springs Subdivision, Section 2, Phase A. |
2002-08 | 1-14-2002 | Repeals Ord. 2001-217. |
2002-20 | 1-28-2002 | Accepts dedication of right-of-way on the west side of U.S. Route 42, containing a total of 0.11 acres. |
2002-21 | 1-28-2002 | Accepts dedication of right-of-way on the east side of U.S. Route 42, containing a total of 0.617 acres. |
2002-37 | 2-11-2002 | Approves the final plat of Weatherstone Subdivision, Section 3, Block B. |
2002-38 | 2-25-2002 | Approves the final plat of Weatherstone Subdivision, Section 4, Phase A. |
2002-46 | 3-11-2002 | Accepting dedication of right-of-way on the north side of Tylersville Road containing 0.15 acres. |
2002-47 | 3-11-2002 | Approves the final plat of Community Campus Subdivision, Section 1. |
2002-53 | 3-11-2002 | Approves the replat of Kings Island Technical Center, Block B, Lots 7 and 8 and accepting dedication of right-of-way on Socialville-Foster Road. |
2002-88 | 6-10-2002 | Approves preliminary plat of Avalon Farms Subdivision. |
2002-101 | 6-24-2002 | Approves final plat of Arbor Creek Subdivision, Section 4. |
2002-108 | 7-22-2002 | Approves the final plat of Whispering Spring Subdivision, Section 2, Phase B. |
2002-117 | 8-26-2002 | Approves the dedication plat of Stitt Road at Tylersville Road. |
2002-132 | 10-14-2002 | Approves the replat of the West Mason Church of Christ. |
2002-133 | 10-14-2002 | Approves the final plat of Oaks of Crooked Tree, Section 7. |
2002-142 | 11-11-2002 | Accepts the public improvements for Fairways of Crooked Tree Subdivision, Part 2, Block E. |
2002-159 | 12-9-2002 | Accepts the public improvements for Greenbrier Subdivision, Phase 1, 1A, 1B, 1C, 1D, 1E and 1F. |
2002-160 | 12-9-2002 | Accepts dedication of right-of-way, located on the southern property line of the WLW clear channel site abutting Tylersville Road. |
2002-162 | 12-9-2002 | Accepts the public improvements for Fairways at Pine Run, Section 1 and 2. |
2003-01 | 1-13-2003 | Approves final plat of Avalon Farms Subdivision. |
2003-02 | 1-13-2003 | Accepts the public improvements for Villas at Pine Run. |
2003-03 | 1-13-2003 | Approves dedication plat for Autozone, Inc. |
2003-04 | 1-13-2003 | Accepts the public improvements for Eagle View Village, Sections 1, 2, 3, 4 and 5. |
2003-09 | 1-27-2003 | Approves final plat of Lenscrafters Subdivision. |
2003-10 | 1-27-2003 | Accepts the public improvements for Greenbrier, Phase 2, Section 1A. |
2003-12 | 1-27-2003 | Approves final plat of Weatherstone, Section 4, Phase B. |
2003-18 | 2-10-2003 | Approves replat of The Fairways of Crooked Tree (Lots 204 and 205). |
2003-22 | 2-24-2003 | Accepts the public improvements for Parkside, Section 1, Blocks A and B. |
2003-33 | 4-14-2003 | Accepts the public improvements for Mason Enterprise Park Phase I. |
2003-46 | 4-28-2003 | Accepts the public improvements for Sunset Ridge Section 2. |
2003-47 | 4-28-2003 | Approves final plat of Columbia Commons Subdivision. |
2003-52 | 5-12-2003 | Approves final plat of Weatherstone, Section 3, Block C. |
2003-53 | 5-12-2003 | Approves replat of Lots 23 and 24B of the Thorngate at Windemere Subdivision. |
2003-62 | 6-9-2003 | Accepts the public improvements for Whispering Springs, Section 1. |
2003-63 | 6-9-2003 | Accepts the public improvements for Greenbrier, Phase 2, Section 1B. |
2003-64 | 6-9-2003 | Approves replat of Lots 11 and 24-A of the Thorngate at Windemere Subdivision. |
2003-65 | 6-9-2003 | Approves replat of the 4309 Mason-Montgomery Road. |
2003-66 | 6-9-2003 | Approves final plat of Renner Farm. |
2003-72 | 6-23-2003 | Approves replat of the St. Susanna Subdivision. |
2003-73 | 6-23-2003 | Approves final plat for Whispering Springs, Section 2, Phase C. |
2003-74 | 6-23-2003 | Approves final plat for Hickory Woods, Section 3, Block A. |
2003-76 | 6-23-2003 | Accepts the public improvements for Lenscrafters Subdivision. |
2003-83 | 7-14-2003 | Approves final plat for the Oaks of Crooked Tree, Section 6, Block C. |
2003-95 | 8-11-2003 | Accepts the public improvements for Laurel Court. |
2003-96 | 8-11-2003 | Accepts the public improvements for Oaks of Crooked Tree, Section 5A. |
2003-100 | 8-25-2003 | Approves dedication and replat for the Nymberg Subdivision. |
2003-101 | 9-8-2003 | Approves replat for Lots 244 and 245 in the Mason Heights Subdivision. |
2003-103 | 9-8-2003 | Approves the dedication plat for Bearcat Development. |
2003-104 | 9-8-2003 | Approves the dedication plat for K.P. Properties. |
2003-113 | 10-13-2003 | Accepts the public improvements for Oaks of Crooked Tree, Section 5B. |
2003-121 | 10-27-2003 | Approves replat of Oakwood Lakes, Section 2 to the Landing at Oakwood Lakes, Section 1. |
2003-122 | 10-27-2003 | Approves preliminary plat of Carmelle Subdivision. |
2003-125 | 11-10-2003 | Approves replat for Lots 14, 15, 22 and 23 in the Wykoff’s Addition. |
2003-127 | 11-10-2003 | Approves replat for Lots 232, 233 and 234 in the Heritage Club Subdivision, Section 10. |
2003-140 | 11-24-2003 | Accepts the public improvements for Arbor Creek Section 1. |
2003-147 | 11-24-2003 | Accepts the public improvements for Fairways at Pine Run Sections 3 and 4. |
2003-148 | 11-24-2003 | Accepts the public improvements for Heritage Club Section 10. |
2003-160 | 12-8-2003 | Approves revised preliminary plat of Carmelle Subdivision. |
2003-165 | 12-8-2003 | Accepts the public improvements for Birchwood South, Sections 2, 3, 4 and 5. |
2004-01 | 1-12-2004 | Approves dedication plat for the Deerfield Acquisition Corporation property. |
2004-02 | 1-12-2004 | Approves replat for Lots 2 and 3 of the Central Park of Mason Subdivision. |
2004-03 | 1-12-2004 | Approves replat and dedication plat for 100 West Church Street. |
2004-04 | 1-12-2004 | Accepts the public improvements for Hickory Woods Subdivision, Section 2. |
2004-05 | 1-12-2004 | Approves final plat for Windemere PUD, Phase 4. |
2004-06 | 1-12-2004 | Approves final plat for Windemere PUD, Phase 5. |
2004-22 | 2-23-2004 | Approves dedication and easement plat for Greenbrier Subdivision, Phase 2. |
2004-23 | 2-23-2004 | Approves dedication plat for the Veterans of Foreign Wars property as part of the Indiana & Ohio bridge replacement project on Mason- Montgomery Road. |
2004-27 | 3-8-2004 | Accepts public improvements for Arbor Creek, Sections 2, 3 and 4 and releasing the performance bond. |
2004-33 | 3-22-2004 | Approves replat and dedication plat for the offices of White Blossom. |
2004-40 | 3-22-2004 | Approves replat for Lot 1 of the Trailside Acres Subdivision. |
2004-47 | 4-12-2004 | Accepts public improvements for Village Lakes, Section 6, Block “B” and releasing the performance bond. |
2004-63 | 5-10-2004 | Approves dedication plat for Western Row Road and Snider Road. |
2004-65 | 5-10-2004 | Approves final plat for Tylersville Crossing PUD. |
2004-73 | 6-14-2004 | Approves preliminary plat of the Estates of Western Row Subdivision. |
2004-74 | 6-14-2004 | Approves replat for Lots 111 and 112 in the Windemere Subdivision PUD, Phase 4. |
2004-90 | 8-9-2004 | Accepts public improvements for Thorngate at Windemere, Sections 1 and 4, and releasing the performance bond. |
2004-91 | 7-12-2004 | Approves the waterline easement plat for Columbia Commons PUD. |
2004-103 | 8-9-2004 | Approves final plat for Rosemont Manor PUD. |
2004-116 | 9-13-2004 | Approves final plat for Weatherstone Subdivision, Section 4C. |
2004-117 | 9-13-2004 | Approves dedication and easement plat for Pebble Creek at Mason, Section 3. |
2004-126 | 10-11-2004 | Approves final plat for Wall-2-Wall PUD. |
2004-129 | 11-22-2004 | Accepts public improvements for Oaks of Crooked Tree, Sections 6A, 6B, 6C and 7, and releasing the performance bond. |
2004-130 | 11-8-2004 | Approves sanitary sewer easement plat for Fountains Office Park. |
2004-140 | 12-13-2004 | Approves final plat for Carmelle Subdivision, Section 1. |
2004-141 | 12-13-2004 | Approves replat for Lots 6 and 7 of the Cintas Commerce Park. |
2004-143 | 12-13-2004 | Approves dedication and easement plat for Everybody’s Farm. |
2005-01 | 1-10-2005 | Accepts public improvements for Parkside Subdivision, Sections 2A, 2B, 2C, 3A, 3B and 3C and releasing the performance bond. |
2005-03 | 2-28-2005 | Approves a revised concept planned unit development plan for property located between Tylersville Road, Luxottica Place and Western Row Road. |
2005-05 | 2-14-2005 | Approves preliminary plat of Promark Enterprise Park. |
2005-06 | 2-14-2005 | Approves dedication and easement plat for The Meadows of Crooked Tree Subdivision. |
2005-07 | 2-14-2005 | Approves dedication plat for Lots 1 and 2 of the Western Estates Subdivision. |
2005-08 | 2-14-2005 | Accepts public improvements for Windemere Subdivision, Phases 1, 1A and 2 and releasing the performance bond. |
2005-15 | 2-28-2005 | Accepts public improvements for Greenbrier, Phase II, Sections 1C and 2A, and releasing the performance bond. |
2005-19 | 3-14-2005 | Approval of the sewer and waterline easement plat for Grizzly Golf Center, Inc. |
2005-20 | 3-14-2005 | Approval of the sewer and waterline easement plat for Tennis for Charity. |
2005-38 | 4-11-2005 | Approving the preliminary plat of the Mitchell Farm Subdivision. |
2005-39 | 4-11-2005 | Approval of the Tri-Way Industrial Park, Lot 7. |
2005-40 | 4-11-2005 | Approval of the final plat for the Cedar Point PUD. |
2005-49 | 4-25-2005 | Approval of the final plat for Hickory Woods Section 3B. |
2005-50 | 4-25-2005 | Approval of the final plat for the Sword Deaf Baptist Church PUD. |
2005-59 | 5-23-2005 | Approval of the replat of Wall 2 Wall PUD, Lots 5, 6 and 7. |
2005-60 | 5-23-2005 | Approval of the final plat for The Landing of Oakwood Lakes, Section 2, Block A. |
2005-72 | 6-13-2005 | Accepts public improvements for Mason Fields. |
2005-74 | 6-13-2005 | Approval of the final plat for Great Wolf PUD. |
2005-75 | 6-13-2005 | Approval of the final plat for Snider Crossing Section 1 PUD. |
2005-76 | 6-13-2005 | Approval of the final plat for Snider Crossing Section 2. |
2005-88 | 7-25-2005 | Approval of the easement plat for The Landing of Oakwood Lakes, Section 2, Phase A and B. |
2005-89 | 7-25-2005 | Approval of the offsite waterline easement plat for The Landing of Oakwood Lakes. |
2005-94 | 8-22-2005 | Approval of the final plat for Mars Hills Subdivision. |
2005-96 | 8-22-2005 | Approval of the dedication and easement plat for the Snider Road Extension. |
2005-97 | 8-22-2005 | Approval of the replat of Trailside Acres Subdivision, Lot 131. |
2005-98 | 8-22-2005 | Approval of the replat of Trailside Acres Subdivision, Lot 158. |
2005-101 | 8-22-2005 | Accepts public improvements for Whispering Springs PUD, Sections 2A, 2B and 2C and releasing the performance bond. |
2005-115 | 9-26-2005 | Accepts public improvements for Birchwood South, Section 6 and releasing the performance bond. |
2005-116 | 9-26-2005 | Approval of the final plat for Greenbrier Commercial PUD. |
2005-120 | 10-10-2005 | Approval of the final plat for The Landing at Oakwood Lakes, Section 2, Block B. |
2005-127 | 10-24-2005 | Approval of the final plat for Everybody’s Farm Subdivision, Section 1. |
2005-128 | 10-24-2005 | Approval of the final plat for Everybody’s Farm Subdivision, Section 2. |
2005-129 | 10-24-2005 | Approval of the preliminary plat of The Estates of Mason Subdivision. |
2005-130 | 10-24-2005 | Approval of the preliminary plat of the Saddleback Estates at Chestnut Hills Subdivision. |
2005-137 | 11-14-2005 | Approval of the final plat for Mason Point Subdivision. |
2005-139 | 11-14-2005 | Approval of the offsite waterline easement plat for Carmelle Subdivision. |
2005-165 | 12-12-2005 | Approval of the final plat for Carmelle Subdivision, Section 2. |
2005-166 | 12-12-2005 | Approval of the replat of Trailside Acres Subdivision, Lot 39 and adjacent unplotted lot. |
2005-169 | 12-12-2005 | Approval of the dedication plat for Builders First Source. |
2006-04 | 1-23-2006 | Accepting the public improvements for Greenbrier Phase 2B and releasing the performance bond. |
2006-05 | 1-23-2006 | Accepting the public improvements for Fountains Office Park and releasing the performance bond. |
2006-06 | 1-23-2006 | Accepting the public improvements for Tylersville Crossing PUD and releasing the performance bond. |
2006-21 | 2-13-2006 | Approval of the final plat for Heritage Club, Section 11. |
2006-22 | 2-23-2006 | Approval of the replat of the First Church of God Subdivision. |
2006-23 | 2-23-2006 | Approval of the replat of Greenbrier Commercial PUD. |
2006-28 | 3-13-2006 | Approving the preliminary plat of Rosemont West Subdivision. |
2006-29 | 3-13-2006 | Approval of the dedication and easement plat for the Landing of Oakwood Lakes Subdivision. |
2006-38 | 4-10-2006 | Approval of the dedication plat for 0.3 acres on Innovation Way. |
2006-50 | 4-24-2006 | Approval of the final plat for Anchor Socialville Subdivision. |
2006-55 | 5-8-2006 | Approval of the easement plat for Falling Brook Subdivision. |
2006-56 | 5-8-2006 | Approval of the offsite waterline easement plat for Falling Brook Subdivision. |
2006-63 | 6-12-2006 | Approval of the final plat for the Landing at Oakwood Lakes Section 2C. |
2006-74 | 6-26-2006 | Approval of the dedication and easement plat for Marshall Brown Boulevard. |
2006-82 | 7-24-2006 | Approval of the Columbia Commons PUD replat. |
2006-89 | 8-14-2006 | Approval of the Mason Commerce Park replat (Prasco). |
2006-97 | 8-28-2006 | Accepting the public improvements for Thorngate at Windemere, Sections 2, 3, and 5 and releasing the performance bond. |
2006-102 | 9-11-2006 | Approving the preliminary late of Snider Station. |
2006-103 | 9-11-2006 | Accepting the public improvements for Pebble Creek, Section 1 and releasing the performance bond. |
2006-104 | 9-11-2006 | Accepting the public improvements for Greenbrier Phase 2C and releasing the performance bond. |
2006-113 | 9-25-2006 | Approval of the waterline easement plat for the Mason Early Childhood Center. |
2006-123 | 10-9-2006 | Approval of the final plat for Carmelle Subdivision. |
2006-124 | 10-9-2006 | Approval of the final plat for Falling Brook Section 1. |
2006-133 | 10-23-2006 | Approval of the final plat for Snider Station. |
2006-134 | 10-23-2006 | Approval of the final plat for Health Alliance. |
2006-144 | 11-13-2006 | Approval of the dedication plat for the Mason Animal Hospital. |
2006-145 | 11-13-2006 | Approval of the dedication plat for Crane Properties. |
2006-146 | 11-13-2006 | Approval of the final plat for Batsche Trails Boulevard. |
2006-147 | 11-13-2006 | Approval of the dedication plat for part of the Hermann Property along Mason-Montgomery Road. |
2006-148 | 11-13-2006 | Approval of the final plat for estates of Chestnut Hill, Section 1. |
2006-149 | 11-13-2006 | Approval of the final plat for estates of Chestnut Hill, Section 2. |
2006-150 | 11-13-2006 | Accepting the public improvements for Pebble Creek at Mason, Section 3 and releasing the performance bond. |
2006-163 | 11-27-2006 | Approval of the final plat for Rosemont West Subdivision. |
2006-164 | 11-27-2006 | Approval of the dedication and easement plat for Cincinnati Chinese Church on Reading Road. |
2006-175 | 12-11-2006 | Accepting the public improvements for Hickory Woods, Section 3A and releasing the performance bond. |
2006-176 | 12-11-2006 | Accepting the public improvements for the landing of Oakwood Lakes, Section 1 and releasing the performance bond. |
2006-177 | 12-11-2006 | Accepting the public improvements for Weatherstone Subdivision, Sections 1, 2, 4A, 4B, and 4C and releasing the performance bond. |
2006-178 | 12-11-2006 | Accepting the public improvements for Windemere Subdivision Phase 4 and releasing the performance bond. |
2007-1 | 1-8-2007 | Approval of the dedication plat for Kingsway Community Church. |
2007-2 | 1-8-2007 | Accepting a dedication plat, approving a lot split, and authorizing the execution of a deed for New Pine Hill Water Tower Site. |
2007-3 | 1-8-2007 | Accepting the public improvements for Carmelle Subdivision, Section 1 and releasing the performance bond. |
2007-39 | 3-26-2007 | Approving the preliminary plat of Reserves of Bethany Subdivision. |
2007-40 | 3-26-2007 | Approval of the replat of 424 Reading Road. |
2007-41 | 3-26-2007 | Approval of the final plat for Bethany Estates. |
2007-42 | 3-26-2007 | Approval of the dedication plat for 0.270 acres on U.S. Route 42. |
2007-62 | 4-23-2007 | Approval of the dedication plat for Sinclair Community College on Courseview Drive. |
2007-68 | 5-21-2007 | Approval of the replat of Wall 2 Wall PUD. |
2007-69 | 5-21-2007 | Approval of the final plat for Mason Self Storage. |
2007-70 | 5-21-2007 | Approval of the dedication plat for Lichtenburg landscaping. |
2007-71 | 5-21-2007 | Accepting the public improvements for Rosemont Manor PUD and releasing the performance bond. |
2007-83 | 6-18-2007 | Approval of the dedication plat for Christ’s Church at Mason. |
2007-84 | 6-18-2007 | Approval of the dedication plat for Lenscrafters Subdivision. |
2007-85 | 6-18-2007 | Approval of the final plat for Promark Enterprise Park. |
2007-86 | 6-18-2007 | Approval of the final plat for Mason Pointe Subdivision. |
2007-119 | 8-27-2007 | Accepting the public improvements for the Heritage Club, Section 11 and releasing the performance bond. |
2007-125 | 9-10-2007 | Approval of the replat for Snider Crossing, Section 1 PUD. |
2007-131 | 9-24-2007 | Approval of the preliminary plat of Reserves of Pine Hill Subdivision. |
2007-140 | 10-8-2007 | Accepting the public improvements for Great Wolf PUD and releasing the performance bond. |
2007-144 | 10-22-2007 | Approval of the replat for Lot 1 in Falling Brook Phase A. |
2008-35 | 3-17-2008 | Accepting the public improvements for Stress Engineering Way and releasing the performance bond. |
2008-56 | 5-12-2008 | Accepting the public improvements for Snider Road Between U.S. Route 42 and releasing the performance bond. |
2008-67 | 6-8-2008 | Approval of the dedication plat for Christ’s Church at Mason. |
2008-78 | 7-14-2008 | Accepting the dedication of the right-of-way for the Western Row Road improvement project (Western Row Subdivision). |
2008-82 | 7-14-2008 | Approval of the final plat for Lakewood Commerce Center. |
2008-91 | 8-11-2008 | Approval of the replat for Lots 127, 128, 129, 130, 131, 132, 133 and 134 in Carmelle Subdivision, Section 3. |
2008-92 | 8-11-2008 | Approval of the replat for Lots 6, 7, 8 and 9 in Mason Commerce Park. |
2008-106 | 10-13-2008 | Accepting the public improvements for Snider Crossing PUD and releasing the performance bond. |
2008-113 | 10-27-2008 | Approval of the final plat for Reserves of Bethany. |
2008-132 | 12-15-2008 | Approval of the final plat for Estates at Chestnut Hill, Section 3A. |
2008-133 | 12-15-2008 | Accepting the public improvements for Carmelle Subdivision, Section 2 and releasing the performance bond. |
2009-01 | 1-12-2009 | Approval of the final plat for Carmelle Subdivision, Section 4. |
2009-11 | 2-9-2009 | Accepting the public improvements for Hickory Woods Subdivision, Section 3B and releasing the performance bond. |
2009-36 | 4-27-2009 | Approval of the final plat for Mason Middle School PUD. |
2009-44 | 6-8-2009 | Approval of a revised concept PUD plan located between State Route 741 and Cox-Smith Road (Glimcher). |
2009-45 | 5-18-2009 | Accepting the public improvements for Rosemont West Subdivision and releasing the performance bond. |
2009-54 | 6-8-2009 | Approval of the replat for Lots 1 and 2 in Lakewood Commerce Center. |
2009-55 | 6-8-2009 | Approval of the replat for Lot 6 in Bethany Trails Subdivision. |
2009-69 | 7-13-2009 | Approval of the dedication and easement plat for 4600 Holding LLC. |
2009-70 | 7-13-2009 | Approval of the dedication plat for Mason Middle School PUD. |
2009-101 | 9-14-2009 | Approval of the replat for Lots 47, 48 and 49 in J.M. Stewart Subdivision. |
2009-144 | 12-15-2009 | Approval of the replat of the 3.019 acre lots in the Kings Island Technical Center. |
2010-2 | 1-11-2010 | Accepting the public improvements for Carmelle Subdivision Section 4 and releasing the performance bond. |
2010-23 | 2-22-2010 | Approving the preliminary plat of Boxwood Farms Subdivision. |
2010-59 | 5-24-2010 | Approval of the final plat for Agile Pursuits Subdivision. |
2010-60 | 5-24-2010 | Accepting the public improvements for Columbia Commons PUD and releasing the performance bond. |
2010-61 | 6-28-2010 | Accepting the public improvements for the landing at Oakwood Lakes Section 2A, 2B and 2C and releasing the performance bond. |
2010-103 | 9-13-2010 | Approval of the final plat for David A Eves Business Park PUD. |
2010-111 | 11-1-2010 | Approval of the replat for reserves of Bethany Subdivision - Section 1A. |
2011-1 | 1-24-2011 | Approval of the replat for Lots 25, 26, 29 and 30 of Carmelle Subdivision Section 1. |
2011-39 | 4-11-2011 | Approval of the dedication plat for 3810 State Route 741 (J.K. Stucco). |
2011-71 | 8-8-2011 | Approval of the replat for Lots 42 and 43 of the Brookstone Subdivision. |
2011-72 | 8-8-2011 | Approval of the final plat for Estates at Chestnut Hills Subdivision Section 3B. |
2011-90 | 10-10-2011 | Approval of the vacation plat for Everybody’s Farm PUD. |
2011-91 | 10-10-2011 | Approval of the final plat for Everybody’s Farm PUD. |
2011-100 | 11-14-2011 | Accepting the public improvements for the western portion of Batsche Trails Boulevard (Estates at Chestnut Hills) and releasing the performance bond. |
2011-101 | 11-14-2011 | Accepting the public improvements for Greenbrier Commercial PUD and releasing the performance bond. |
2012-9 | 2-13-2012 | Approval of the replat for Lot 15 in Falling Brook Phase A. |
2012-15 | 3-12-2012 | Approval of the replat for the Mason Manor House PUD. |
2012-38 | 5-14-2012 | Approval of the replat for part Lot 6, Lot 7 and Lot 15 of the Kings Island Technical Center Block "B" (Intelligrated). |
2012-40 | 6-11-2012 | Approval of the dedication plat for 3850 Bethany Road (First Choice Landscaping). |
2012-47 | 7-9-2012 | Approval of the final plat for The Reserves of Carmelle Subdivision Phase 1. |
2012-48 | 7-9-2012 | Approval of the final plat for Willow Brooke Subdivision - The Meadows Section One. |
2012-53 | 8-13-2012 | Approval of the final plat for Estates at Chestnut Hills Subdivision Section 4. |
2012-54 | 8-13-2012 | Approval of the dedication plat for 109 and 111 Kings Mills Road (Time Warner Entertainment). |
2012-61 | 9-10-2012 | Approval of the final plat for Lakewood Commerce Center Section 2. |
2012-85 | 12-10-2012 | Approval of the replat for Lot 8 in Falling Brook Phase A. |
2013-2 | 1-14-2013 | Approval of the record plat for People’s Building Loan Center. |
2013-20 | 2-11-2013 | Approval of the replat of Lots 3 and 4 of Columbia Commons PUD. |
2013-36 | 4-22-2013 | Approval of the final plat for Boxwood Farms Subdivision. |
2013-62 | 7-8-2013 | Approval of the final plat for the Reserves of Carmelle Phase 2. |
2013-70 | 8-12-2013 | Approval of the final plat for Falling Brooke Phase B, Block A. |
2013-89 | 11-18-2013 | Approval of the final plat for the Alverta Subdivision Section 1. |
2013-90 | 11-18-2013 | Approval of the final plat for Willow Brooke, the Meadows Section 2. |
2013-91 | 11-18-2013 | Approval of the dedication plat for 5380 Courseview Drive (Sinclair Community College). |
2013-101 | 12-9-2013 | Approval of the replat for Lot 7 in Falling Brook Phase A. |
2013-102 | 12-9-2013 | Approval of the final plat for Falling Brook Phase B, Block B. |
2013-103 | 12-9-2013 | Approval of the consolidation/dedication plat for the Mason Public Library Subdivision. |
2014-4 | 1-13-2014 | Approval of the replat for Lots 85 and 86 of the Lakeside Subdivision. |
2014-17 | 5-12-2014 | Approval of a revised concept PUD plan for a portion of the Columbia Commons Development located on the east side of Columbia Road north of Catalina Isle (Columbia Commons). |
2014-31 | 5-12-2014 | Approval of the final plat for the Fountains of Mason PUD. |
2014-53 | 7-14-2014 | Approval of the final plat for Woods of Rosemont PUD. |
2014-54 | 7-14-2014 | Approval of the final plat for the Alverta Subdivision Section 2. |
2014-55 | 7-14-2014 | Approval of the replat for Kings Island Technical Center Block “F”. |
2014-69 | 9-8-2014 | Approval of the replat for Lot 13 in Falling Brook Phase A-5. |
2014-70 | 9-8-2014 | Approval of the final plat for Willow Brooke Subdivision – The Estates Section One. |
2014-71 | 9-8-2014 | Approval of the final plat for Willow Brooke Subdivision – The Ridge Section One. |
2014-100 | 11-10-2014 | Approving the preliminary plat of Carmelle Subdivision Section Five. |
2014-101 | 11-10-2014 | Approval of the final plat for the Reserves of Carmelle Phase 3A. |
2014-123 | 12-15-2014 | Approval of the final plat for the Alverta Subdivision Section 3A. |
2014-124 | 12-15-2014 | Approval of the final plat for the Willow Brooke Subdivision The Meadows Section 3. |
2014-125 | 12-15-2014 | Approval of the dedication plat for Mason-Morrow- Millgrove Road and Cox- Smith Road. |
2014-126 | 12-15-2014 | Accepting the public improvements for Promark Enterprise Park and releasing the performance bond. |
2014-127 | 12-15-2014 | Accepting the public improvements for Carmelle Subdivision Section 3 and releasing the performance bond. |
2015-9 | 2-9-2015 | Accepting the public improvements for Willow Brooke Subdivision The Meadows Section 1 and 2 and releasing the performance bond. |
2015-27 | 3-9-2015 | Approving the preliminary plat of Crooked Tree Preserve Subdivision. |
2015-28 | 3-9-2015 | Approval of the final plat for the Festo Americas Subdivision. |
2015-48 | 5-11-2015 | Approval of the replat for the Nymberg Subdivision. |
2015-49 | 5-11-2015 | Approval of the replat for Lot 12 in Falling Brook Phase A-6. |
2015-50 | 5-11-2015 | Approval of the final plat for the Reserves of Carmelle Phase 3B. |
2015-51 | 5-11-2015 | Approval of the final plat for the Alverta Subdivision Section 3B. |
2015-71 | 7-13-2015 | Approval of the final plat for Mason Grand PUD. |
2015-93 | 9-28-2015 | Approval of the final plat for Willow Brooke Subdivision The Ridge Section 2. |
2015-94 | 9-28-2015 | Approval of the final plat for Carmelle Subdivision Section 5. |
2015-113 | 11-23-2015 | Approval of the final plat for Crooked Tree Preserve Subdivision Phase 1A. |
2015-114 | 11-23-2015 | Accepting the public improvements for Woods of Rosemont PUD and releasing the performance bond. |
2015-115 | 11-23-2015 | Accepting the public improvements for the Reserves of Carmelle Phases 1 and 2 and releasing the performance bonds. |
2015-116 | 11-23-2015 | Accepting the public improvements for Mason Grand and releasing the performance bond. |
2016-8 | 1-25-2016 | Approving the dedication plat for State Route 741. |
2016-12 | 2-8-2016 | Accepting the public improvements for Reserves of Bethany Subdivision and releasing the performance bond. |
2016-36 | 3-14-2016 | Approving the replat for Lakewood Commerce Center. |
2016-37 | 3-14-2016 | Approving the dedication plat for Mason Self Storage. |
2016-38 | 3-14-2016 | Approving the replat for Lot 14 in Falling Brook Phase A-7. |
2016-60 | 4-25-2016 | Accepting the public improvements for Alverta - Sections 1 and 2 and releasing the performance bonds. |
2016-71 | 5-16-2016 | Approving the dedication plat for portion of Alliance Drive. |
2016-72 | 5-16-2016 | Approving the dedication plat for Bunnell Road and U.S. Route 42. |
2016-73 | 5-16-2016 | Approving the dedication plat for U.S. Route 42. |
2016-86 | 7-11-2016 | Approving the replat of Lots 8 & 9 of Crooked Tree Preserve Subdivision Phase 1A. |
2016-87 | 7-11-2016 | Approving the final plat for Crooked Tree Preserve Subdivision Phase 1B. |
2016-93 | 8-8-2016 | Approving the final plat for the Reserves of Carmelle Phase 4A. |
2016-94 | 8-8-2016 | Approving the final plat for Willow Brooke Subdivision - The Estates Section Two. |
2016-103 | 9-12-2016 | Approving the replat of the Beach Subdivision, Phase Two. |
2016-105 | 9-12-2016 | Approving the record plat for Middleton Subdivision. |
2016-106 | 9-12-2016 | Approving the final plats for Ambleside Meadows - Phases 1A, 1B, and 1C. |
2016-114 | 10-24-2016 | Approving the replat for Mason Grand Section 1A. |
2016-115 | 10-24-2016 | Accepting the public improvements for the Estates at Chestnut Hill Subdivision Section 4 and releasing the performance bond. |
2016-128 | 12-12-2016 | Approving the replat of Lot 13 in Heritage Club, Section 1. |
2016-129 | 12-12-2016 | Approving the replat of Lot 254 and Parcel 16 in Heritage Club, Section 11. |
2016-130 | 12-12-2016 | Approving the replat of Lot 187 in Heritage Club Section 4. |
2016-131 | 12-12-2016 | Approving the final plat for Ambleside Meadows, Phase 1E. |
2017-25 | 2-27-2017 | Approval of the record plat for Everybody’s Farm PUD, Section 4. |
2017-32 | 3-20-2017 | Approving the preliminary plat of the Kings Mill retail site. |
2017-33 | 3-20-2017 | Accepting the public improvements for Mason Grand sanitary sewer extension and releasing the performance bond. |
2017-53 | 4-10-2017 | Approval of the final plat for Falling Brook, Phase B, Block C. |
2017-54 | 4-10-2017 | Approval of the Cintas Commerce Park, Section 2 replat. |
2017-55 | 4-10-2017 | Approval of the replat of Lot 2A in Christ’s Church at Mason, Section 1. |
2017-56 | 4-10-2017 | Approval of the dedication plat for Mason Montgomery Road (P&G). |
2017-68 | 5-15-2017 | Approval of the replat of Crooked Tree Preserve, Phase 1A, Revision 3. |
2017-69 | 5-15-2017 | Approval of the final plat for Ambleside Meadows, Phase 2. |
2017-78 | 6-12-2017 | Approval of the replat for Lot 6 in Falling Brook, Phase A-8. |
2017-79 | 6-12-2017 | Approval of the replat of Castle Park 2728. |
2017-80 | 6-12-2017 | Approval of the record plat for Malich Acres Subdivision. |
2017-81 | 6-12-2017 | Approval of the final plat for Crooked Tree Preserve Subdivision, Phase 1C. |
2017-82 | 6-12-2017 | Approval of the final plat for Kings Mill Plaza. |
2017-89 | 7-10-2017 | Approval of the final plat for Ambleside Meadows, Phase 1D. |
2017-90 | 7-10-2017 | Approval of the final plat for the Reserves of Carmelle, Phase 4B. |
2017-91 | 7-10-2017 | Approval of the replat of Lots 11, 12, 19 and 20 of the P.W. Wycoff’s Addition Subdivision. |
2017-92 | 7-10-2017 | Accepting the public improvements for Alverta, Section 3, Blocks A and B and releasing the performance bonds. |
2017-97 | 8-14-2017 | Approval of McGee’s Courts 4 Sports replat of Lot 5A. |
2017-107 | 9-11-2017 | Approval of the final plat for Ambleside Meadows, Phase 3A. |
2017-118 | 9-25-2017 | Approval of the final plat for Willow Brooke The Estates, Section 3. |
2017-119 | 9-25-2017 | Approval of the final plat for Willow Brook The Estates, Section 4. |
2017-130 | 10-23-2017 | Approval of Cintas Commerce Park, Section 2, Revision 1, record plat. |
2017-131 | 10-23-2017 | Approval of the Beach Subdivision, Phase 2, Revision 1, record plat. |
2017-160 | 12-11-2017 | Approval of the dedication plat and acceptance of public improvements for Mason Pointe. |
2017-161 | 12-11-2017 | Approval of the final plat for Ambleside Meadows, Phase 4. |
2017-162 | 12-11-2017 | Approval of the final plat for Crooked Tree Preserve Subdivision, Phase 2. |
2017-163 | 12-11-2017 | Accepting the public improvements for the Reserves of Carmelle, Phases 3A and 3B, and releasing the performance bonds. |
2018-2 | 1-8-2018 | Approval of the final plat for Ambleside Meadows, Phase 5A. |
2018-3 | 1-8-2018 | Approval of the dedication plat for Mason-Montgomery Road (UDF). |
2018-8 | 1-22-2018 | Approval of the Colonial Acres Replat No. 2. |
2018-32 | 3-12-2018 | Approval of the replat for Lot 5 in Falling Brook, Phase A-9. |
2018-63 | 5-14-2018 | Approval of the final plat for Ambleside Meadows, Phase 5B. |
2018-68 | 6-11-2018 | Approval of the final plat for Crooked Tree Preserve Subdivision, Phase 1D. |
2018-69 | 6-11-2018 | Approval of the record plat for Khan Noor Subdivision. |
2018-92 | 8-20-2018 | Approval of the final plat for Ambleside Meadows, Phase 5C. |
2018-93 | 8-20-2018 | Approval of the record plat for Mason Pointe Four Subdivision. |
2018-102 | 9-10-2018 | Approval of the final plat for the Reserves of Carmelle, Phase 4C. |
2018-103 | 9-10-2018 | Approval of the record plat for Festo Americas Subdivision, Phase 2. |
2018-120 | 10-8-2018 | Approval of the final plat for Crooked Tree Preserve Subdivision, Phase 3A. |
2018-139 | 12-10-2018 | Approval of the final plat for Ambleside Meadows, Phase 3B. |
2019-2 | 2-14-2019 | Approval of the replat for Kings Mills Plaza, Section 1A. |
2019-3 | 1-14-2019 | Approval of the Cox-Smith Road dedication plat (S-K Mason Area). |
2019-4 | 1-28-2019 | Approval of the Mason Oaks Townhomes easement plat. |
2019-5 | 1-28-2019 | Approval of the final plat for Crooked Tree Preserve Subdivision, Phase 3B. |
2019-14 | 2-11-2019 | Approval of the dedication plat for 414 Reading Road. |
2019-31 | 3-25-2019 | Approval of the final plat for Everybody’s Farm, Phase 2 PUD, Section 1. |
2019-32 | 3-25-2019 | Approval of the record plat for Bodenbender Subdivision. |
2019-57 | 5-13-2019 | Approval of the replat for Kings Mills Plaza, Section 1B. |
2019-70 | 6-10-2019 | Approval of the final plat for Crooked Tree Preserve, Subdivision Phase 1E. |
2019-87 | 8-12-2019 | Approval of the replat for Lot 4 in Falling Brook, Phase A-10. |
2019-88 | 8-12-2019 | Approval of the final plat for Crooked Tree Preserve, Subdivision Phase 3C. |
2019-89 | 8-12-2019 | Approval of the record plat for Royalmont Subdivision. |
2019-90 | 8-12-2019 | Approval of the dedication plat for Sound Wave Boulevard. |
2019-99 | 9-9-2019 | Approval of the replat for Kings Island Technical Center, Block C. |
2019-102 | 9-9-2019 | Approval of the dedication plat for Mason- Montgomery Road (3501 Mason-Montgomery Road). |
2019-119 | 10-28-2019 | Approval of the final plat for Ambleside Meadows, Phase 3C. |
2019-146 | 12-9-2019 | Approval of the final plat for the Reserves of Carmelle, Phase 4D. |
2020-31 | 3-9-2020 | Approval of the Sterling Self-Storage Subdivision plat. |
2020-32 | 3-9-2020 | Approval of the replat for Kings Mills Plaza, Section 1C, Lot 4. |
2020-54 | 6-8-2020 | Approval of the replat for Lot 19 in Falling Brook, Phase A-11. |
2020-55 | 6-8-2020 | Approval of the Dilley Subdivision, Phase 2 replat. |
2020-56 | 6-8-2020 | Approval of the dedication plat for Wahe Properties, LLC. |
2020-61 | 7-13-2020 | Approval of the dedication plat for Hageman Crossing, Phase 1. |
2020-68 | 8-10-2020 | Approval of the replat for Kings Mills Plaza, Section 1D, Lot 1A. |
2020-86 | 9-28-2020 | Approval of the final plat for Tower Park PUD. |
2020-97 | 10-26-2020 | Approval of the final plats for Crooked Tree Preserve, Phases 3D and 3E. |
2020-113 | 12-14-2020 | Approval of the final plats for Ambleside Meadows, Phases 3D and 6. |
2021-4 | 1-11-2021 | Approval of the replat for Kings Mills Plaza, Section 1E, Lots 4A and 4B. |
2021-40 | 3-8-2021 | Approval of the replat of the Beach Subdivision, Phase 3. |
2021-61 | 5-10-2021 | Approval of the replat for Lot 112 in Crooked Tree Preserve Subdivision, Phase 3A, Revision #1. |
2021-62 | 5-10-2021 | Approval of the final plat for Crooked Tree Preserve Subdivision, Phase 3F. |
2021-66 | 6-14-2021 | Approval of the replat of Promark Enterprise Park, Section 2. |
2021-83 | 8-9-2021 | Approval of the replat for Lot 2 in Falling Brook, Phase A-12. |
2021-97 | 9-27-2021 | Approving the preliminary plat of the Estates of Mason Subdivision. |
2021-103 | 10-11-2021 | Approval of the final plat for Lots 204-215 and 221 in the Crooked Tree Preserve Subdivision, Phase 3G. |
2021-104 | 10-11-2021 | Approval of the replat for Lot 1 in the Tower Park PUD Development. |
2021-121 | 11-29-2021 | Approval of the replat for Lots 22 and 23 in the Elkwood Subdivision. |
2021-122 | 11-29-2021 | Approval of the final plat for Mason Research and Development Park. |
2022-5 | 1-10-2022 | Approval of the replats for WRLD Subdivision Section 1 & 2. |
2022-46 | 4-11-2022 | Approval of the record plat of Degree Properties. |
2022-47 | 4-11-2022 | Approval of the replat of Falling Brook Phase B Block D. |
2022-65 | 5-9-2022 | Approval of the preliminary plat of the Ainsley Subdivision. |
2022-66 | 5-9-2022 | Approval of the replat for WRLD Subdivision, Section 2. |
2022-67 | 5-9-2022 | Approval of the dedication plat for Mesa Properties, LLC (UDF) at Tylersville Road and US 42. |
2022-78 | 6-13-2022 | Approval of the replat for Lot 1A in the Tower Park PUD Subdivision. |
2022-88 | 8-8-2022 | Approval of the replat for WRLD Subdivision, Section 2. |
2022-89 | 8-8-2022 | Approval of the replat for the Beach Subdivision, Phase 4. |
2022-93 | 9-20-2022 | Approval of the record plat for Young Subdivision. |
2022-94 | 9-20-2022 | Approval of the record plat for TWAS Properties, LLC. |
2022-106 | 11-14-2022 | Approval of the replat for Lot 111 in Heritage Club Section 6. |
2022-107 | 11-14-2022 | Approval of the replat for WRLD Subdivision, Section 3. |
2022-120 | 12-12-2022 | Approval of the Alverta, Section 4, replat. |
2023-4 | 1-9-2023 | Approval of the replat for Lot 3 in Falling Brook Phase A-13. |
2023-12 | 2-13-2023 | Approval of the final plat for Ainsley Subdivision. |
2023-28 | 3-13-2023 | Approval of the final plat for Grismer Subdivision (Reading Rd.). |
2023-45 | 4-10-2023 | Approval of the replat for Castle Park 2728 Revision 1. |
2023-46 | 4-10-2023 | Approval of the record plat for the Ferrell Subdivision. |
2023-49 | 5-8-2023 | Approval of the dedication plat for BSMH Fairfield, LLC (Mercy Hospital) along Kings Island Drive. |
2023-67 | 8-14-2023 | Approval of the dedication plat for U.S. Route 42 and Mason- Morrow-Millgrove Road (BC Bottle Lodge). |
2023-90 | 11-13-2023 | Approval of the replat for WRLD Subdivision, Section 4. |
2023-91 | 11-13-2023 | Approval of the replat for Lot 20A in Falling Brook Phase A-14. |
2023-92 | 11-13-2023 | Approval of the final plat for the Estates of Mason Subdivision. |
2023-93 | 11-13-2023 | Approval of the record plat for Grace Baptist Church of Mason Lot 1. |
2023-94 | 11-13-2023 | Approval of the record plat for J.G. Hancock Subdivision. |